33, 000
Operation & Maintenance
Street Sweeping $ 97,000 $ 100, 000 $ 103, 000 $ 106,000 $ 109,000 $ 112, 000
Ditch Mowing and Repair $ 575, 000 $ ( jf) 2, 000 $ 610, 000 $ 628, 000 $ 647,000 $ 666, 000
Sewer System Maintenance $ 10, 000 $ 10. 000 $ 10, 000 $ 10, 000 $ 10, 000 $ 10, 000
Roadside Ditch & Culvert Maintenance $ 5, 000 $ 5,000 $ 5,000 $ 5, 000 $ 5, 000 $ 5,000
7, 000 $ 7,000 $ 7, 000 $ 7, 000 $ 7, 000 $ 7,000
System Inspections $
NPDES Illicit Discharge Inspections $- $ 7, 000 $ 7, 000 $ 7, 000 $ 7, 000 $ 7, 000
Pond Maintenance $ 24, 000 $ 25, 000 $ 26, 000 $ 27, 000 $ 28, 000 $ 29, 000
Capital Improvements
Existing CIP $ 314, 000 $ - $- $- $- $-
Debt Service on $ 5 million CIP $- $ 462. 000 $ 462, 000 $ 462, 000 $ 462, 000 $ 462, 000
Small/ Emergency Project Reserve $- $ 300,000 $ 309, 000 $ 318, 000 $ 328, 000 $ 338, 000
Equipment Replacement Reserve $- $ 88, 000 $ 88, 000 $ 88,000 $ 88, 000 $ 88, 000
Depreciation on Existing Equipment $- $ 53, 000 $ 53, 000 $ 53, 000 $ ;; 3, 000 $;; 3.000
TOTAL ANNUAL EXPENSES $ 1, 196, 000 $ 1 2, 011, 000 $ 2, 041;1, 000 $ 2,01111, 00.0 $ 2,1211, 000
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 113
07..
2. 3 Exemptions
ch will conduct an analysis of publicly
EarthTE:> ownE:>dandtax~E:> xempt property to
rmine
detE:> iVthey should be exempt from payiogaU/ oraportion. of the City' s
rfee. The
stormwatE:> criteria that should be diisp~
uSE:> rmination of
tE:>
the
sedqnthedE:>
rthE:>
whethE:> rty. is
prOPE:> a user of City' s s t o r m Wi<l t e r m < i l o agEl . ntinfrastructure
rnE:>
and Other City stormwater services. Some mayh(ilveNPDESJ> tormwater permits
simil(rtohatofheCity' s that may be grounds fOfeXclusion or reduction of fees.
r, in light of the Gainesville v FDOT( 2006) ruliogitis unclear whether a
HoweVE:>
stormwj;itE:> rfee maybe imposed on the StatewithoutitsexpresSyonsent. Earth
Tech Will analyze the specific facts in Fort Walto !i3e< ilchandreviewthE:> m with Mr.
Kurt . spitzer, ..ExeclJtive Director of theFlorida< StormINater Association, to
termineifGainesville v FOOT might influence hQwtheratestructure or fees are
dE:>
determined. strategies will be developed with...staff, .Techoical Assessment
Committee and elected officials to partner withtax\ s to address
exemptpropertiE:>
stormwater management and satisfy the finding of Gainesville v FOOT.
2. 4 local - Regional Stormwater Utility
Earth Tech will discuss with City staff and the Technical Assessment Committee
the .. poteotialjd; vantj; iges of forming a RegionalStofrnINater Utility. Two
advantji;gE:> s that j;ire likely to come forward j;ire( t) better /coordination and
j;iplicj; ition . of storm water management standardsji; nd( 2) j;ibjlty to fund Ij;irger
Earth Tech will estimate of the potential
cj;ipit(
ill/ projects. thepotepij; lrev nue
member communities. Earth Tech will discuss wittr Gity stafl' and. the Technical
Assessment Committee a strategy and estimjite;h lev Lofel' Ortthat would be
necessary for determining the level of intersof rmingj;rElgional authority.
Factors to consider .include what will happen toexistngstj;iff< i l n d equipment that
Fort.Walton Beach 20,619
are currently responsible for stormwater mji;nj; igement. . Qptions. that could be
Crestview 17, 206
dj;ire any combination of forming. ( 1) j;
considerE:> i regionj;ilauthority with total
control and responsibility, ( 2) regionji; l funding but locaL implementation and ( 3) Niceville 12, 791
regional funding and planning with some regional implementation and some local Destin 12, 015
implementation. 6,492
Valparaiso
Mary Esther 4.211
Task 2. 5 Feasibility Report Preparation
Shalimar 723
Earth Tech will prepare a summary report of the findings <:
Ind recommendations of Laurel Hill 569
the development of the rate structure. Public.. policy. decisions like the
Cinco Bayou 366
development of the stormwater fee need to be m<:lde open to the public. The
Total 185,958
documentation of the decisions made during the development and implementation
of thestormwater fee is an important piece of the public disclosure. The report will
document the sequencing of decisions that were made that led to the selected
alternative.
Task 3. 0 Enabling legislation
Two critical features of a fair, equitable and legally defensible stormwater utility are
its credjtpolicyand appeals policy. Appellants must exhaust their local appeals
before they are taken to court or the Public Services Commission. It is cheaper for
Engineering/Consulting Services,
Stormwater Utility Study, RFP 07- 113
commLJnities to handle appeals themselves than to defend them in court.
Therefore, it. is Jmportant that the ordinance giveS) stp eJ<ls:fair. consideration by
staff, comrnitteesand. elected officials. The City SE;) eksto have the ordinance
est<JPU:shing the utility in place by September 30,. 2007, Whichrneansthat the draft
ordinc;mce shQuld be Jeady to begin its reviwbynoJsterh<:1pAug st 1, 2007 ( two
monthsJPradpption), Assuming that the. billingsystemjs functioning by
mber30, 2007, rates should be established no laterth<Jn:October 1, 2007, so
NOvE;)
that the billing system can be fully tested before having to go live in December.
3. 1 Draft Ordinances
Earth TechwHI prepare a Draft Ordinance for establishing a stormw1<:ter utility that
reflectsthesel.ected recommended rate Jndcr~ ditpplicy. The Draft
structurE;)<:
distributed to staff and the City' s Jegal council for comment. The
Ordinance will bE;)
Draft Ordinance will be revised based on ntsT~
commE;) d<:
Jnd then returned to
ceivf:'\
the City' s legal council who will be responsibl~) forthefinal format of the
Ordinance. Issues and policy that will be addressed in the ordinance include:
Who will oversee the administration of the utility
II
Billing of property owner versus tenant utility customer
II
The appointment of and authority of a govemingboard
II
The need for and authority of an outside advisory council
II
Inactive LJtility accounts
II
Delinquent payments