Ferry Park
the desired program goals ( the program' s Gamire' s Beach
8eabreeze
40, 000
7,200
7, 200
level of service). Earth Tech will work with
7~2oo $
South Sa ou
7,200 $ 7~ C)O $ 411, 000 $ 1,:ZC)O $ 7; 200
Account Total
staff to develop services, programs or 5403 Water Qualtiy Initiative
Water Qualti Initiative 25,000
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 07- 113
the cost
projects to achieve the desired level of service. EarthT~ chiWlrdQc.lment
of s.~ rvicesJPrQ{Jamsnd projects that the Citywillhav~ t()ad( lorwol. ld hope to
add inordertoprovide the desired level of service. Particl.Iar tention will be
the impact on City' s current list of services addressing the City' s NPDES
givent()
in
storm\iVaterpernit, the determination of the City' s rQle in implementing TMDL' s
Bay and the implementation of the Choctawhatchee River and
Choctawhatchee
Bay SWIMPlan.
Task2.2, 3 Personnel Requirements
Earth Tech will include a staffing needs assessment, similar to the table below
conducted for the City of Appleton. These analyses will include an examination of
the replacement or addition of equipment. However, the staffing assessment will
not be limited to operations/ maintenance but will include staffing needed at each
level of the stormwater utility program.
FutureTMDL Implementation Plan
Additional
I I- I I
Annual
I
Recommended """ 09
Stormwater Inventoried Maintenance omm"", Staff Field Maintenance
Units Frequency Staff Field Days Days Costs
Facility
A nnua 208 000
Storm 5- yr Cycle 317 375 $ 0
2 200 miles
Sewers
Ditches & 4. 5 miles 5- yr Cycle 59 5$ 27, 000
3
Culverts
3 Mowings
8
Detention Annually
9 5 20 $ 900
Basins Dredging 10- yr 3
Cycle
10
System 15, 000 20- yr Cycle 1, 125 250 $ 262, 500
Repairs
TotatField .Davs 3, 748 1, 070
17
AdditionafStaff Required
AdditionalAnnual Maintenance Costs $ 601, 200
2, 2. 4 Capital Improvements
The City has already identified over $ 15, 000, 000 in needed capital improvements,
including those listed below. Earth Tech will review the City' s capital Improvement
Earth Tech will
program for the City of Fort Walton Beach stormwater utility.
list of projects identified by the City' s NPDES stormwater permit,
compile a
TMDL's. in i Choctawhatchee Bay and the implementation of the Choctawhatchee
River and Bay SWIM Plan. Earth Tech staff and the Technical Assessment
Committee will the criteria for prioritizing any " new" projects. Earth Tech
develop
staff and the Technical Assessment Committee will program the prioritized
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 113
07..
to
projects into a comprehensive capital program. . ProjE)cts will be examined
that be grant eligible or cost shared with other jurisdictions.
identify those might
Storm Dr<.linage Program-$ 10, 000, 000
StorrnwpterlSaltwater Pipe Program-$ 675, 000
Retention Improvements at Gibson Holding Pond-$ 150, 000
StormwatE)r Management Plan-$ 75, 000
II
StormW<It.erSE) parators-$ 1, 500, 000
GIS tormw<.IterMap ing and Aerial Photography-$ 420, 000
III
PerviousPavers-$ 1, 750, 000
III
Oyster Reef Restoration-$ 500, 000
II
k Restoration-$ 750, 000
StreamB;; u")
II
StormWater Modeling Program-$ 429, 000
Erosion Control Measures for Construction Projects-$ 150, 000
III
StormWater Structure Rehabilitation-$ 675, 000
II
Choctawhatchee Basin Alliance Partnership-$ 200, 000
2. 2. 5 D~ velop 5- Year Cash- Flow for the Stormwat~r Program
Earth. Tech will compile a table showing the recorrunE)ndecJ multi- year " Cash- Flow"
for the phasing in of services for the storrnwatE)rprogram. The table will ( 1)
Itemizetheservices provided, ( 2) Outline the schedUled phasing in of services and
;: recommended to be used and ( 4)
3) Listthe revenue sources that ire
projects, (
Identify the level. of funding that is anticipated to be generated by each revenue
source. The table will show the estimatedannuaLcosts for these services for each
dfor the City of
year. TMetable will be similar to the one we recently develoPE)
Hinesville,. Georgia, a community of around 30, 392 located southwest of the City
of Savannah. Please refer to the following page for the Hinesville cash- flow table.
Engineering/Consulting Services,
Stormwater Utility Study, RFP 113
07..
oAramPlanninq.& Development
Pl'
City Manager and Staff $ 55, 000 $ 57, 000 $ 59, 000 $ 61, 000 $ 63,000 $ 65. 000
Rate Stabilization Reserve ($ 500, 000) $ $ 25,000 $ 50, 000 $ 50,000 $ 50,000 $ 50,000
Delinquent Accounts $ $ 48,000 $ 96, 000 $ 98,000 $ 99, 000 $ 101, 000
EnQineerinQ
Contract Services $ 15, 000 $ 15. 000 $ 15, 000 $ 15, 000 $ 15, 000 $ 15, 000
Stormwater Utility Implementation $ $ 60, 000 $ $ $ $
NPDES Compliance
NPDES Public I& E $ 5, 000 $ 5, 000 $ 5, 000 $ 5,000 $ 5, 000 $ 5,000
NPDES Wet Weather Monitoring $ $ 11, 000 $ 11, 000 $ 11, 000 $ 11, 000 $ 11, 000
NPDES Construction Erosion Control $ 28,000 $ 29,000 $ 30, 000 $ 31, 000 $ 32, 000 $ 33, 000
NPDES Illicit Connections & Discharge $ 4, 000 $ 4, 000 $ 4, 000 $ 4,000 $ 4, 000 $ 4, 000
Inspection & Enforcement
Plan Review $ 20, 000 $ 21, 000 $ 22, 000 $ 23,000 $ 24, 000 $ 25, 000
Construction Inspection $ 5, 000 $ 5, 000 $ 5,000 $ 5, 000 $ 5, 000 $ 5, 000
Pond Inspection $ 4, 000 $ 4, 000 $ 4, 000 $ 4, 000 $ 4, 000 $ 4, 000
GIS Support $ 28, 000 $ 29, 000 $ 30, 000 $ 31, 000 $ 32, 000 $