READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 05-08-2007 regular agenda — reading text

Part 34 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-13449-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

level and I; Earth Tech will audit each organizational eleme.ntsofeach of the City' s stormwater management program ( Planning and Engine.ering, Inspections/ Enforcement Uituty Stormw~lerPM$ion Collected at StOfmwater Outfalls Number of Sal11PI% 80 -$- -$- JmprOvements, etc.), to clarify the Capital Number of rmits Reviewed .fprEnvironmentaJ Compliance P(:,} Numbftr QfLift$ ta,tions~ Y!ewed for QrdJnance Compliance 200 -$- -$- 5 -$- -$- services that are being provided. Earth Stormwater Mgmt Plans Reviewad for Ordinance CompUance 5 -$- -$- 5 -$- -$- Site ! nspEX:tions w Stormwater infrastructure installation for N., Tech. will review the NOI and other related Contractual Services 50, 000 -$- Public Works. documents. The audit will consist of Street Maintenance Un~ ar Feat of New Slorm Drain 0 -$- -$- interviews with appropriate staff and the Linear tof Repaireq! F!%! ed Storm Drain RepIOl' .<; Replaced 0 -$- -$- 0 -$- -$- LinearFfj~t jfSaltw{erOutalRepaired/ review of each of the City' s annual Miles of t linear $r~t SW(J:: pt perMonth J:etofStorrn Drain Cleaned F(: 562 -$- -$- 1, 000 -$- -$- budget. The City has already started to 1, 025 -$- -$- Number ofGulllE1rt$and Inlets Cleaned PubUcWorks segregate costs for stormwater services Engineering Number ofStormwaterfSite Plan RevJews 100 -$- -$- 40 -$- -$- which will reduce the effort anticipated to NUmpraf ofFload Zone Inql,i.res Hours$ p.entonCRS for Flood Program 100 -$- -$- ommunity Re.developmentArea be needed for this task. Re airedlRe laced 790 -$- -$- 50,000 $ 0 0 CAPITAl IMPROVEMENTS 2. 2. 2 Identifying Future Services and 5019 Storml 100, 000 Eglin Easement Phase 1 Costs Chicago Ave at Third and Oak 25. 000 150, 000 Eglin Easement Phase 2 150. 000 Eglin Easement Phase 3 50,000 Hughes 51. (From Walton Or. To Outfall) 600' Earth Tech will compare the results of the Hughes 81. (From Outfall To Iowa) 1, 300' 40, 000 Behind South Side Of Highland Dr. ( From Holmes To Robinwood) 1, 000' 45, 000 audit of the City' s program to the goals Cvral Ct.To Rose Marie In,( Re!ocate Line From Near BuUding} 120' rt To Jet Dr. 800' 12, 000 40, 000 Bisho Aile. Rear Lot Line From Shum summarized in the Mission Statement. Account Total 12,000 $ 40. 000 Where Gurrent services are not attaining 5297 Stormwater (Saltwater) Pipe Replacement 7. 200

Download this text file with its original spacing ↓