READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 05-08-2007 regular agenda — reading text
Part 34 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13449-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
level and
I;
Earth Tech will audit each organizational
eleme.ntsofeach of the City' s stormwater
management program ( Planning and
Engine.ering, Inspections/ Enforcement Uituty
Stormw~lerPM$ion
Collected at StOfmwater Outfalls
Number of Sal11PI% 80 -$- -$-
JmprOvements, etc.), to clarify the
Capital Number of rmits Reviewed .fprEnvironmentaJ Compliance
P(:,}
Numbftr QfLift$ ta,tions~ Y!ewed for QrdJnance Compliance
200 -$- -$-
5 -$- -$-
services that are being provided. Earth Stormwater Mgmt Plans Reviewad for Ordinance CompUance 5 -$- -$-
5 -$- -$-
Site ! nspEX:tions w Stormwater infrastructure installation
for N.,
Tech. will review the NOI and other related Contractual Services
50, 000 -$-
Public Works.
documents. The audit will consist of Street Maintenance
Un~ ar Feat of New Slorm Drain 0 -$- -$-
interviews with appropriate staff and the Linear tof Repaireq!
F!%! ed Storm Drain
RepIOl' .<;
Replaced
0 -$- -$-
0 -$- -$-
LinearFfj~t jfSaltw{erOutalRepaired/
review of each of the City' s annual Miles of t
linear
$r~t SW(J:: pt perMonth
J:etofStorrn Drain Cleaned
F(:
562 -$- -$-
1, 000 -$- -$-
budget. The City has already started to
1, 025 -$- -$-
Number ofGulllE1rt$and Inlets Cleaned
PubUcWorks
segregate costs for stormwater services Engineering
Number ofStormwaterfSite Plan RevJews
100 -$- -$-
40 -$- -$-
which will reduce the effort anticipated to NUmpraf ofFload Zone Inql,i.res
Hours$ p.entonCRS for Flood Program 100 -$- -$-
ommunity Re.developmentArea
be needed for this task. Re airedlRe laced 790 -$- -$-
50,000 $ 0 0
CAPITAl IMPROVEMENTS
2. 2. 2 Identifying Future Services and 5019 Storml
100, 000
Eglin Easement Phase 1
Costs Chicago Ave at Third and Oak
25. 000
150, 000
Eglin Easement Phase 2
150. 000
Eglin Easement Phase 3
50,000
Hughes 51. (From Walton Or. To Outfall) 600'
Earth Tech will compare the results of the Hughes 81. (From Outfall To Iowa) 1, 300'
40, 000
Behind South Side Of Highland Dr. ( From Holmes To Robinwood) 1, 000'
45, 000
audit of the City' s program to the goals Cvral Ct.To Rose Marie In,( Re!ocate Line From Near BuUding} 120'
rt To Jet Dr. 800'
12, 000
40, 000
Bisho Aile. Rear Lot Line From Shum
summarized in the Mission Statement. Account Total
12,000 $ 40. 000
Where Gurrent services are not attaining 5297 Stormwater (Saltwater) Pipe Replacement
7. 200
