READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 05-08-2007 regular agenda — reading text
Part 33 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13449-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
first Task will focus on understanding the historical
if
problems<Clnd projects from existing documents and staff, and,
staff, meet to review problems and needs with the
suggested by
Choctawhatchee Basin Alliance and the NWFWMD. It will
consist of:
II
Reviewing existing reports and budgets
Interviewing the staff to identify and qualify problem areas
Reviewing the City' s NPDES Stormwater Permitting records
Reviewing the Choctawhatchee River and Bay SWIM Plan
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 01- 113
1
We would recommend one workshop to establish agreement upon the
extent of the City' s jurisdiction and the priority of the problems that will
be addressed. If customers are to be charged for stormwater, they will
have their own expectation as to how those funds should be spent. For
example, some residents may expect funds to be used to improve
protection for storm surge or improved water quality in Choctawhatchee
Bay. The consensus can be, if desired, summarized as the Mission
Statement for the Stormwater Utility Program. The workshop could be
made up of the Technical Assessment Committee or any combination of
staff, elected official, and citizenry as the City may elect.
1. 3 Institutional/Management Assessment
Earth Tech wiUconduct an audit of the coordinatiqnots; tor!1water programs and
institutionals;tructures among all of the offices;.anddepa.rtments ( Utility, Public
Works and . Gommlmity Development) involved in the various elements of
and
stormwatermanagement. The audit will identify the institutional. barriers
that need to be addressed iftrulyeffectivestormwater control
finacingo.bstacles
is tob.e In many communities theexistlngi~overnmentalorganization
achieved.
does not change .but the coordination betweendepartrnent$ eind/ funding of specific
activities/ teisks. is funded from the stormwater account- If itisdeemedappropriate,
Earth. .. Tech.. will suggest changes to the organizational structure
or
policies/ procedures needed to administer the stormwater programs.
Task 2, 0 Develop Recommended Utility Program
def nsib.lestormwater utility is based on
Objective: A fair, equitable, and legally
between the fees that are cheirgedeind the services provided
establisl1inga nexus
There are two legal
eVeryone. pays their fair share of the cost ofstormWeiter}.
nexuses. that must be established. The first is · referred to the customer
how do we compute the bill for each customer. The customer
apportionment, or
apportionment is often base on the amount of imperviousareei. The second
nexus
is referred to as the cost apportionment which that are to be paid
linkstheseirvices
stems from
by a customer to the fee itself. By far the mostcQrnmonissue litigated
customers challenging that they are not receiving they are being
seryicesforwhich
the stormwater
charged. The public wants to know what they are gQingto getf9r
fee, and are they " getting their money' s worth". Together, the two part nexus
fee
establishes the foundation for the legal requirements for the rate structure, the
and the utility' s credit policy.
Development of Rate Structure
2. 1. 1 Obtain Assessor' s and GIS Data
Earth Tech will work with staff to obtain the correct data from the Okaloosa
Assessor and the available City and County GIS databases, which will contain key
information for estimating the stormwater utility charge for each parcel.
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 07- 113
2. 1. 2 Define Custo.mer Base
Earth Tech will characterize the makeup of.. the customers served by the
of the
StormvvaterProgr9m by conducting a detailed parcel-by-parcel analysis
number, size, land- Use, and amount of impervious9reao. e9ch parcel. The data
for thisanalysi$ wiUcome primarily from the mapping/ GIS and assessor' s records
provided the OkaloOsa County and the City.
2. 1. 3 CUsto.mer ApP.orti. onment
Earth Techwillcpnduct a Workshop to present the advantages anq disadvantages
for each of the three general rate models, thei;quiva. Unit ( ERU),
to City
lentResigential
the EquivalenlHydraulicArea ( EHA), and the IntensityofPevelopment (10)
Staff and the Technical Assessment Committee. The.
o b j e q t i v e of the workshop
will betoreach9consensus of a rate methodology thalrefleqtsthe objective of
will
the City' sprogram. There are many variations ofeachiratefT\Pdel. Earth Tech
customize the rate methodology to meetthe/ spec.ific/ condito.nsand unique
conditiqnswithin. the City of Fort Walton Beach. Thegeneral.connection between
methodology and objective of a stormwater program are briefly summarized
below.
Imperious Area Manage Increased Runoff from Impervious Area
Runoff Volume or Peak Manage Runoff from All Developed/ Undeveloped
EHA
Discharge Properties
Account for Differences in Runoff from Land Use /
ID Land Use
Percent Imperviousness / Water Quality Loads
2. 1. 4 Single Family Parcels and Estimati.on . of the Base Unit
The Base Unit represents the average cost
stormwaterfrom the average or typical customer.
provided to estimate the total impervious area
the number and variability in the amount of
establish the total square footage of the base unity
2, 1. 5 Tiered Single Family .other Residential Pr.operties
in the cost
Many communities choase ta acknowledge that there is some variability
of services provided to single family customers with very small
homes ( with small
amounts of impervious area) and the very large homes. Earth Tech will facilitate
the discussion of whether the City should consider a tiered single family custamer
class.
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 07- 113
2, 1. 6 Impervious Area Calculations
Single family Homes
Earth Tech will estimate impervious areas for all non single- of GA
famHyparcelsintheCity of Fort Walton Beach using the
availaple. C! erifi; / photography ( April 2005), City/ CountyGIS, site 700
Jfnecessary,. field measurements. The County' s GIS
plansanc;!,.
600
ingJootprint. The Earth Tech Teamwill
buHc;! curentlyhf;iS.
delinefit;ethe. parking f;ind . other imperious area to complete the 500
needed data for computing the number of billing units.
400
c
o
stimating Anticipated Revenue
2. 1. 7 I; 0300
200
Based on the rate structure recommended by the workshop,
Earth Tech will estimate the total number of billing units ( ERUs, 100
EHA, etc.} thf;itmake up the customer base of thesormvf; iter
utility,.. As!.unmary of this information will give an un(jerstanc;! ing
of the mf;i.keup of the customer base and will. asslstintaUoring
Impervious Area
the rf;ite. structure to reflect the unique characteristics of the City sq. ft.)
of Fort of Walton Beach.
Example of Impervious Calculations for HinesviUe, GA
Rates
2. 2. 1 stablishing Existing