READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 05-08-2007 regular agenda — reading text
Part 30 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13449-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
analysis Qfthe existing stormwater
m~ na~ ernentservices provided by the city. The qurrent~ ncj~ ntiqipated future
servIce Tequirernents were evaluated and the cost for proviqing the services was
develoPed. The projected costs of the City' of KenQsha's stQrmwater program was
estimatedtQ. be as much as $ 3, 500, 000 annucdly.. Users...Qf the stormwater
management system were then identified and categorized based on probable use
of the services provided.
The second phase included an evaluation of funding 4, 500
meqhanismavailable topay for the current~ ndfuture 4, 000
stormwater ..m~ nagement services. Revenue. available frQm 3, 500
various .SQUrces were evaluated and developed into ~ 10- year 3,000
implementation strategy. Financial considerations such as
2, 500
credits to users for services not fully
received Or to off set previously
constructed best management
practices were incorporated into the
funding strategy. This phase also
included five meetings with a s> <
s>'" s>""
",< < s>"'",,,,'"
s>'" #' < s>'" <
citizens' stormwater utility advisory
Parcel Area
group were ideas and strategies
were presented and refined to reflect
the feedback from the group.
After reviewing these alternative
methodolQgies it was recommended
thattheCityofKenosha adopt a rate
structure that was based on a modified E:quivalent HydrQlogic Area ( EHA)
logy. . Appling simplifying assumptions a balance was reached between
method()
technic~laqcuracy in estimating a customer' s runQffiqQntributiQn and simplicity of
administr~tiQn. The average peak runoff rate ( O.i35qfs) of the " Typical" Single
Family customer represented one EHU ( equivalent Hydrologic Unit). Every parcel
Engineering/Consulting Services,
Stormwater Utility Study, RFP 07- 113
in theCityofKenoshawill be charged 1- EHU foreveryO. 35cfs that the property is
dt() rate during the 10- Year . design storm. While the time of
estiJ'l)G' lt!:') gen!:')
concentrGltiqn Jorimpervious area was consistentfor<GlILproperties, an algorithm
was lopedthatextended the time of concentration for pervious areas as the
dev!:')
amountfperviol,. S area increased.
The third phase included development of the ordinance establishing the utility and
a rate resolution that established the actual charge necessary to implement the
new funding strategy, the development of a stormwater customer billing database
that was integrated into the Water and Sewer Authority' s billing system and the
City' s GIS, the development of a user's manual to instruct city staff on policies and
procedures for the new program, and coordination with city staff during
implementation.
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 07- 113
Earth TE;lch has worked on over 40 similar projE;lcts. We have tailored each to
meetthespecificneedsand constraints of ourclients.. As a result they have
rangedinduratiqnJrom as short as six months to Qvertwo years with fees ranging
fromarql!.od$ 20,QOOto over $ 400, 000. We are confident and willing to tailor this
projectto meet the budget and time constraints oftheGityof Fort Walton Beach in
a manner that satisfies the requirements of the scope of work.
Statement of Disclosure
Earth Tech certifies that the company bears no rel(ito'nship, past or present, with
contractor, which maYhinder, ill'1pede or in any way
any pqtEl;ntialpi< iderqr
compromise efforts to perform complete, unbiased, and objective services for the
City of Fort Walton Beach.
Engineering/Consulting Services,
Stormwater Utility Study, RFP 07- 113
Project Understanding
The City of Fort Walton Beach is seeking asitance (jexp rtise to establish a
fair equit3<bl;eand legally defensible stormwaterutility ..to. fund its growing
respom;ibUitiesto properly plan and managestormwater. The two essential
drivers ClPpear to be an aging infrastructure and> a concern OVer stormwater
quality. The City seeks to have the ordinance estabUshingthe utility in place by
September 30, 2007 and the billing system functioningpyNovember 30, 2007.
Working with Technical Assessment Committee
Earth Tech Will develop the Stormwater Utility Program . with staff and the
Technical As.sessment Committee. Earth TeCh proposes a series of workshops
where alternatives and issues may be jiscUs ectand
pres nte(j/,..( ranked. This
process will allow the program, services, and . ratelstn.lctureto follow accepted
protocol for the community in such matters, and in the end reflect in stormwater
program the unique character of the City of Fort Walton Beach.
Project Plan
Proj~ctOr" ani:zation: The project is generally brokenintothree phases. Phase 1
is referred to as the Feasibility Study that and Task 2.
consitprm;ailyofTask1
Phase2is.Task 3, the adoption of all ordinances/ art(jloresytin ablshing
thestormwater utility. Phase 3 is the implementation of the>stormwater utility
custornerbillingsystem, which consists primarily ofTask 4. >Throughout all three
phases>.aredifferent types of public outreach (Task. 5, TasK7and Task 8). It is
importantthat public outreach begins early to begin Jnformingthe residents of Fort
Walton Beach about stormwater and the stormwater utility that is under
consideration.
Meeting Project Deadlines: To meet the September target date, Earth Tech
plans to be<completed with drafting the ordinartc~ nolaterthctnAugust 1, 2007.
This .assymes. that the ordinance can be adopted in the two council meetings
normally scheduled in August. This requires thatacol11plete.ddraftofthe Phase 1
Feasibility Study needs to be completed by July 1, 20Q7.} hisleavesthe month of
October to complete the building of the customer billing information and the month
of November to load and test the new data prior to its release November 30, 2007.
Project Schedule: To meet the established deadlines Earth Tech will work on
Phase 1 Tasks 1 and 2 and Phase 3 Task 4 and Tasks 6, 7, and 8 simultaneously.
This is an aggressive schedule but can easily be accomplished with the project
team that we have assembled. Our GIS/ Database Specialist, Petra Ahnert, with
assistance JromBill Duffy and J2 Engineering, will be responsible for collecting the
various computer files and reports that will be used throughout the project.
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 07- 113
April -
Track 1 - John Ferris and Alex Macbeth, who is very familiar with
Task 1:
ChoctawhatGhee. Bay ( having worked as a volunteer for theChoctawhatchee
Basin. AUianc.e), will compile the list of the City' s problems and issues, with the
ass.istanceofcitystaff within the first few weeksottheproject. Gina Bennett will
facilitatelhe<di.scussions of the technical is uesdl,ringthefrswokhp( Task
8. 1) to condense them down into the Mission Statemenlforthestormwater utility
program. Task 2.4: John Ferris and Alex MaGbeth WHlconductdiscussions with
city staff) abouttheconcept of a RegionalStormwaterUtilityand a strategy to
probe the concept with potential member com l,nit . es.. Johnand Alex, with the
assistance of Gina Bennett, will follow through on the strategy chosen by the City.
Track . Task 2. 1 : Petra Ahnert will conduct a parcel-by-parcel assessment to
extracttheJactors ( land use, parcel area, imperviol.l~ thatwill be used in the
are(:\}
rate methOdQlogyto compute the stormwaterfee. Various statistics will be
generated (:\nd atable compiled to summarize. tion. This information
theinfQrm(:\
willpeusedinVVorkshop2 ( task 8. 1) to evaluate, prioritize and select a preferred
rate methodology. Task 2. 3: John Ferris Will review. the list of the tax exempt
parceJstp eVal .ate the potential cirumstancesundeC\ Nhich they might qualify or
reqll.estex!: the stormwater charge. Task2.2: Atthe sarne time Chuck
1mptionfrom
Boehm anti BillQuffy will interview City staffal1dCitybudgetto establish the
currel1tandfut.ure cost of services for the level. otservicesdesiretl by the City. J2
Engineering ( ollr.. MBE subconsultant) will augment Bill and Chuck to track down
and break down the cost for the various services provided.
Track 3 - Tasks 4. 1 and 4.2: John Ferris will review how theCUy is utilizing the
mQdules pf the City' s HTE/ AS400 billing system and <discuss with the staff the
options of how to set up the stormwater charge. This is expected to require more
thal1 pne meeting. However, all meetings shouldbec;ompletecjby the end of May
at which time there should be a clear list of
assignrnentsandresponsibilities of
what modifications need to be complete in orderfortheHTE/ A$4QO to be ready by
the end of October to start accepting downloads of the stormwater customer billing
system.
June - July
Track 1 - completed
Track 2 - Tasks 2. 2.4 and 2. 2. 5: Working through three Workshops, Chuck
Boehm, with the assistance of Bill Duffy and John Ferris, will establish the cost for
the existing level- of-service and the desired level- of-service that will be provided
by thestormwater utility. This includes the prioritization and scheduling of the
capitalimprovements. Gina Bennett with the assistance from Barry Pritchett and
Alex Macbeth will conduct the community interviews. Feedback that is received
wHlbe.fa.ctored into the discussions of the workshops to tailor the stormwater utility
P rognElrn to reflect the unique characteristics of the City of Fort Walton Beach. J2
Engineering will provide support as needed to conduct the workshops and open
houses presented in the proposal.
Engineering/ Consulting Services,
Stormwater Utility Study, RFP 07- 113
Track 3 - complete
September
Track 1 - completed
Track 2 - completed
Track 3 ~Tasks 2. 4, 2. 5 and 7. 1: Gina Bennett and John Ferris will coordinate the
public hearings and public meetings associgtediwiththe adoption of the
ordinance( s) and resolutions required to establish the stormwater utility.
August -
Track