READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 03-22-05 — reading text
Part 7 of 11. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10029-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Rep1acement of roof as follows:
1. Remove existing roof down. to deck.
2. Install 15 lb. felt.
3. Reflash all pipes.
4. Install 25- year 3 tab shingles.
5. Clean and rem.ove roofing debris.
6. Install nail over ridge vents. Replacemeave metal.
7. 1 year workmanship warranty.
O..
Rotten wood will be replaced at cost plus 25% --
approximately $50. 00 per sheet.
We hereby propose to furnish 1abor and materials -
complete 1n accordance with the above specifications, for the sum of:
Five Thousand,One Hundred,Fifte n doJ.l.ars ($ 5,] 15. 00) with payment to be made as follows:
50% due upon acceptance. Remiander due
upon completion.
All mamriaI is guaruteed to be as
spedfied. All wortr to be c; omplet.ed in .. workmanlike manner according to 5tandard practices.
specificatiaos involving ~ costs win be ~ ecuted only upon 1IIIitten orders, &
Any alteration or deviation fn> m above
U1d will become 1m extra ehargl!over and above t; he
strikes. acddents, or delays b~
esti..... All Agreements mntingent upon
our control. This
proposal subject to ac epranc:e within 30 days and is vaId thereafter a
; t the option of the
be ar:c; eptable u.,~ notified in writing of the nature of back charges and underJ.jgned. No bad daarges wll
appmvad by our job ~uperintendent or an officer of this Co. This notice is to be
hmenttD lIlY co_ that is 9feed
" upon by Deslin -
binding and made an
119. Tille II> .. equipment IUd mllllriols is II> ..... 111 ~ ~ ROOFING ,,~ pa,.- poid in full.
ano
AuthorimISignabrre~~ ./
ACCEPTANCe: OF PROPOSAL
The above process, specifications, and conditions are
hereby accepb:d. You are authorized to do the work a,o; spedfied. P~ yment will be made as outlined
above.
ACCEPTED:
Signature
Date
Signature
03/ 07/ 2005 11: 19 8508370325 DESTIN ROOFING INC PAGE 03
PROPOSAL
O~~ G J nc.. p.o. Box 233 . Destln. FL 32540
Page 1 of
Phone (850) 837.2645. Fax (850) 837-0325 .
REPAIRS. REROOFING. NEW ROOFS
PROPOSAL SUBMITTED TO: PHONE; 833. 9525 ] DATE: 3/ 7/ 05
NAME: City Of Fort Walton Beach JOB NAME:
STREET: STREET: Country Club Ave.
CITY: CITY: FWB
STATE: STATE: FI.
We hereby submit specifications and estimates for:
Replacement of roof as foHows:
1. Rem.ove existing roof down to deck.
2. Install 15 lb. felt.
3. Retlash all pipes.
4. Insta.1] 25- year 3 tab shingles.
5. Clean and remove roofmg debris.
6. Instan nail over ridge vents.
Replace T1TeaVC metal.
7. 10- year
workmanship warranty.
Rotten wood will be replaced at cost
plus 25% -- approximately $ 50. 00 per sheet.
We hereby propose to furnish labor and materials -
complete in accordance with the above specifications, for the sum of:
Fourteen Thousan.d, Two Hundred dolJars ($ 14, 200_00.) with
payment to be m.ade as follows:
50% due upon
acceptance. Remiander due upon completion.
An material is
guaranteed to be a5 specified. All work to be completed in a wo,' urumlike m~ ner ac;
spedfications involving extra c:QSb 'lill be executed only upon written orders, and will becGN .. tording to !tandard prattk@$.Any ahmton or deviation from above
extra charge over and above the estimate.
strikM, accidents, or All Agreements contingent upon
delays beyond our contror. This proposal subject to ~ within 30 . ys and is void ~ fter at the option of the
be acceptable unless notified in undersignld. No back c:harg8 wtl
writing of the nature of back dlarge5 andapproved by our job superintendent or an officer of thiJ Co. This notice is to be
moot to that is "9- binding and made an
any - upon by Dostin Roofing. Till. to all equip_ and ~. ~ to .-. 10 ~~ ~~
paid in full.
nts...
Authonzed Signature
M-
LA4K ~~/ 7'/
2
The above process,
ACCEPTANCE OF PROPOSAL
specifications, and conditions are hereby accepted. You are auth~ ed to do the work as
above. specified. Payment wiJl be made as outlined
ACCEPT' 'ED:
Signature
aate Signature
CITY COUNCIL MEETING
March 22, 2005
Consent Agenda
Request Authorization to Award for Signage Repair and
Replacement resulting from Hurricane Ivan to
Guidance Pathway Systems, Inc.
Purchasing Director)
Council Action
1st
2nd
Vote:
Agenda Item Number: CA- 4
CITY OF FORT WALTON BEACH
COMMUNITY DEVELOPMENT SERVICES DEPARTMENT
MEMORANDUM
Date: March 15, 2005
To: Joyce Shanahan, City Manager
Through: Missy McKim,AICP, Director . J\I\~ \ '^-
Community Development Services~V \
From: Peggy Fowler, AICP, Planner II
Community Development Services
SUBJECT: Replace City Wayrmding Signs Damaged by Hurricane Ivan
BACKGROUND
Winds from Hurricane Ivan damaged twelve ( 12) of the City' s wayfinding signs that were designed
and manufactured under a contract with Guidance Pathway Systems, Inc. in 2000 and 2001. Because
in some cases, the signs were not totally destroyed, the repair work must match as closely as possible
the materials, design and colors of the existing signs. In addition, the unique laser- cut wave logo
designed for the City' s wayfinding sign system, must be matched as closely as possible on all signs
that are repaired or replaced.
The damage to the signs was estimated to be in excess of $ 12, 000. Based on the fact that these signs
have to be custom- made to match the existing signs and that, when the original contract was bid for
the wayfinding signs, only one response was received out of35 proposals solicited for the design and
manufacture of wayfinding signs, the City requested quotes from six ( 6) regional sign companies, as
well as Guidance Pathway Systems, Inc., in order to determine if it would be cost- effective to use the
formal bid procedures. Several of the regional sign companies followed up with questions about
repairing/replacing the signs, but none turned in a quote.
SUMMARY
Pursuant to Chapter 2, Section 2- 266, Purchasing Policies and Procedures, Ft.Walton Beach Code of
Ordinances, staff requests authorization to award the contract for
