BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: December 4, 2012
TO: Honorable Chairman and Members of the Board
FROM: John Hofstad
SUBJECT: Veteran's Park - Improvement Schedule and Funding
DEPARTMENT: Public Works
BCC DISTRICT: 2
STATEMENT OF ISSUE: Staff requests Board approval for various park improvements for
the unoccupied portion of Veteran's Park (approximately 17 acres) and a dedicated funding
source utilizing annual lease fees from the two leased parcels: Gulf Coast Marine Life Center
and Wild Willy's Adventure Island.
BACKGROUND: Earlier this year the BCC approved a conceptual plan to subdivide portions
of the 35-acre Okaloosa Island property previously known as the Island Golf Center. The
approved subdivision of property resulted in 4.57 acres for the Gulf Coast Marine Life Center,
3.56 acres for the Emerald Coast Wildlife Refuge, 2.83 acres for Wild Willy's Adventure Island,
and 17+/- acres reserved for passive recreation. Two of the leased parcels, Marine Life Center
and Wild Willy's, were previously approved by the Board and are set up as revenue generating
leases for the County.
The largest tract within the property (17 acres +/-) is to be reserved in its natural state for the use
and enjoyment of the public. This past summer, staff brought before the Board for approval a
conceptual rendering of various improvements to this tract which included: gravel walking trails,
pavilions with picnic tables, fountains in two of the ponds, and reconstruction of the pedestrian
bridge over the large pond. Staff estimates the cost for these improvements to be: $18,000 for
construction of the walking trails, $5,000-$7,000 each for the picnic pavilions, $2,500 each for
the pond fountains, $15,000 for reconstruction of the pedestrian bridge, and $50,000 for a
restroom facility on the east side of the park if desired. Many of the improvements planned for
this tract will be accomplished through volunteer efforts and funding provided by the two lease
operations, Marine Life Center and Wild Willy's. However, the two lessees have not committed
to funding all of the improvements needed to complete the park.
Staff recommends setting aside a portion, or all, of the annual lease fees in a separate account for
use by the Parks Division as a funding source for various improvements at this location.
Currently, the Parks Division does not have a budgeted capital improvement program for
Veteran's Park. The annual lease fees total $140,000, with Wild Willy's contributing $65,000
and the Marine Life Center contributing $75,000. The Parks Division can draw from this
funding source to ensure that the improvements outlined above are completed within our
conceptual timetable of 18 months. In addition, several improvements are needed to the existing
public parking area, a portion of which resides within the lease boundaries of Wild Willy's and
the Marine Life Center. Staff anticipates using this funding source to complete the needed
parking improvements in the area outside of the leased boundary. This project will be
accomplished in cooperation with the two lease operations in order to take advantage of
economies of scale savings.
OPTIONS: Approve/Disapprove staff's recommendations related to Veteran's Park
improvements and the corresponding funding source needed for their completion.
RECOMMENDATIONS: Staff requests Board approval to implement various improvements
within the unoccupied portion of Veteran's Park on Okaloosa Island and subsequent approval for
a corresponding funding source utilizing annual lease fees from the two leased parcels, Gulf
Coast Marine Life Center and Wild Willy's Adventure Island.
RECOMMENDED BY:
APPROVED BY:
James D. Curry, County Administrator