Minute Book 70, Page 229
Okaloosa County Board of County Commissioners
Mr. Harris said he appreciates Mr. Amunds comments but he takes
an opposite opinion. He stated the Crestview Courthouse is
woefully out of date. Continuing, he said money is continually
thrown at Shalimar but this facility gets left out. Mr. Harris
advised that he is not supportive of putting a band-aid on a
hemorrhaging wound but wants to build a facility for the next
thirty to fifty years. He said he cannot throw a couple of
dollars at North County and build a new facility in South
County. Mr. Harris stated he supports Option #3.
Mr. Windes requested Mr. Turner continue with his presentation.
Mr. Turner stated the Crestview Courthouse was built in 1953 and
the end towers were added in 1962-63, Upon inquiry by Mr.
Boyles, Mr. Turner stated the Shalimar Annex was constructed in
1974. Mr. Boyles interjected the Crestview Courthouse was built
during segregation and before air conditioning. Mr. Harris
added the population at the time of construction was under
50,000 with most of the citizens living in North County; thus,
the reason for it being the County Seat.
Mr. Turner stated the Courthouse was built before the Americans
with Disabilities Act (ADA) and the elevator in the facility is
not ADA compliant. Another issue is improper inmate holding
facilities. Mr. Harris pointed out that during court some of
the people on trial are sitting with witnesses.
At this point, Mr. Parisot asked to see the design concept
drawings. Several topics of discussion continued throughout Mr.
Turner’s presentation of the drawings. These included
additional parking, security, and fitting a function to a space
rather than moving walls.
Option #1 would provide additional space as follows: ground
floor (basement) - 610 square feet; first floor - 5770 square
feet; second floor - 6270 square feet for a total area of
12,650. 50% of the existing facility would be renovated with
the most dramatic changes occurring on the court floor (second
floor). The only work in the basement would be providing an ADA
connection/elevator. The entrance would be on Main Street.
Upon inguiry by Mr. Parisot, Mr. Turner estimated this option at
S5 Million to $8 Million. He said the remainder of the asbestos
in the building must be remediated and a fire sprinkler system
may be required. Mr. Turner stated they plan to make the spaces
in the building operationally functional. He said the building
February 4, 2014 -12- Minute Book 70, Page 230
Okaloosa County Board of County Commissioners
should be arranged for operations that serve the public. Mr.
Turner noted the ideal solution is to tear down the building and
start again but the cost for that option would be $30 Million to
S40 Million.
Mr. Harris stated demolishing the Courthouse is not an option.
He said when the subject was first discussed, the plan was to
spend $10 Million on the Courthouse and $10 Million on the
Shalimar Annex but now the plan is to tear down the Shalimar
Annex and build a new facility. Mr. Harris also pointed out a
new annex extension was built in Fort Walton Beach on Lewis
Turner Boulevard at a cost of $30 Million.
Mr. Amunds stated the purpose of tearing down the Shalimar Annex
is to save on rents. The money going to lease rentals would be
used to fund the new building. He said it seems to him the cart
is being put ahead of the horse. Mr. Amunds used an analogy of
needing a new car, saying the money you have will determine if
you can buy a Chevrolet (or Ford) or a Cadillac. He stated the
Gollar amount should first be determined then work the space
into it.
Mr. Harris agreed the original plan for the Shalimar Annex was
to mitigate rents but then we wound up with a $30 Million
building in Fort Walton Beach. He stressed the county must
build for tomorrow.
Mr. Parisot agreed with Mr. Amunds’ response on using lease
payments as the funding source for the Shalimar project. He
continued by addressing the topic of the OCWS becoming a
commercial renter when county offices are moved out of the Water
& Sewer Administration Building, extended financing for the
Courthouse renovation, and his opinion the county could not
handle $25 Million in indebtedness for these projects. Mr.
Parisot said the ideas have mushroomed and a cap should be set.
He felt the county should get rid of the fancy stuff and stick
to form, fit and function.
Mr. Boyles stated there are two approaches: find out how much
you can afford and then build or build what you need regardless
of the cost. He said no substantial amount of money is being
spent right now and we are working forward. Mr. Boyles stated
that by selecting a preferred design option, we can begin to
develop the cost estimates. He did not see that it would be
possible to get there in one vote or in one meeting, saying we
will make little decisions to shape it. Continuing, Mr. Boyles
February 4, 2014 -13- Minute Book 70, Page 231
Okaloosa County Board of County Commissioners
stated that he believes we are where we need to be and the Board
has done the same thing in Shalimar. He urged the commissioners
to let this process go forward.
Mr. Windes agreed with Mr. Boyles and said we cannot wait three
or four months before making a decision. He said the cost of
Option #1 is $5 Million to $8 Million and he is not sure that
option meets the goal.
Mr. Turner pointed out that Option #1 will not separate inmates
from the public, explaining the inmates will have to walk
through public space to get to Courtroom A. He added Option #1
adds only one courtroom and provides for today’s needs.
Mr. Harris stated Option #1 hinders ADA and could put the county
back into the same situation as the lawsuit which was filed
because the Shalimar Annex was not ADA compliant. Mr. Turner
also pointed out a lawsuit was filed regarding safety issues at
the Shalimar Annex.
Mr. Boyles pointed out he has been the Board’s liaison to the
Crestview Courthouse Task Force and he gathered from. the
stakeholders that if Option #1 is the only one considered, they
prefer to do nothing. They did not consider Option #1 to be a
wise expenditure of funds and voted this option as being
unsuitable. Mr. Boyles stated the Task Force voted for Option
#3. Mr. Boyles made motion, seconded by Mr. Harris, to take
Option #1 off the table. Mr. Amunds stated he is not saying
Option #1 will or will not work but his thing is the dollar
amount. He stressed he does not support spending $12 Million to
$20 Million. Mr. Parisot stated a RFQ was expedited and only
two bids were received. He asked what is taking so long. Mr.
Boyles replied that he is a member of the selection committee
and feels it is working very well. He pointed out hiring Mr.
Phillips to provide architectural technical assistance has been
cost effective. Mr. Parisot suggested cancelling the RFQ. Mr.
Boyles replied the RFQ is for a construction contractor. Mr.
Boyles again asked for the process to be allowed to move
forward. 5 yeas.
Mr. Turner stated Option #2 is the “middle size” option, adding
15,825 square feet of new space. He said inmate holding
facilities would be more centralized in the building and there
would be a new public elevator from first floor to basement.
Upon inquiry by Mr. Amunds, Mr. Turner stated the cost of this
option is in the range of $7 Million to $10 Million. He said
February 4, 2014 -14- Minute Book 70, Page 232
Okaloosa County Board of County Commissioners
there would be extensive renovation on the court floor but there
would not be any elbow room. It would provide a third courtroom
but that only meets today’s needs. Mr. Turner reported the
workload in Okaloosa County is higher than any other in the
First Judicial Circuit. He said the district has been approved
for two new judges but the funding for them has not yet been
allocated.
Upon inquiry by Mr. Parisot, Mr. Phillips stated there are six
courtrooms in Fort Walton Beach. Mr. Parisot said he believes
it is a scheduling issue. Mr. Boyles responded that scheduling
meetings for the Board is quite different than scheduling for
court cases. He explained many times an issue is not settled
until it is set for trial. Mr. Boyles stated you don’t want to
double book court cases like the airlines double book flights.
He emphasized that we are not experts on judicial matters and it
is not our job to tell the judges how to schedule trials. Mr.
Boyles felt Option #3 is much closer to what we will need for
the next few decades.
Mr. Turner stated Option #3 will add approximately 24,200 square
feet of new space. It has jury deliberation rooms and judges’
chambers on the second floor. This plan completely and entirely
separates the inmates from the public. It also provides for a
new third floor which would contain two additional courtrooms.
Mr. Harris spoke about growth in North County. He stated there
is 67,000 square feet of space at the Annex and asked Mr. Turner
how much space is at the new facility on Lewis Turner Boulevard,
to which Mr. Turner replied 84,000 square feet. Upon further
inguiry by Mr. Harris, Mr. Phillips answered there are 44,000
square feet of space in the Crestview Courthouse. Mr. Harris
said there iS no parity. He stated with the additional
courtrooms in Crestview, there could be significant savings
realized by not transporting inmates from the County Jail in
Crestview to court in Fort Walton Beach. Mr. Turner advised the
projected costs for Option #3 is $8 Million to $12 Million.
Mr. Windes asked if there are architects who specialize in
designing courthouses that we could call on to help answer
questions. Mr. Turner replied in the affirmative and noted the
design team for the new judicial facility brought one in and he
still has those working papers. He stated they could provide
some value engineering. Mr. Turner also said they learned some
valuable lessons during the construction of the new judicial
facility on Lewis Turner Boulevard. Upon inguiry by Mr. Windes,
February 4, 2014 -15- Minute Book 70, Page 233
Okaloosa County Board of County Commissioners
Mr. Turner said a portion of the additional floor in Option #3
could be shelled out and the fourth courtroom could be developed
when we get another judge.
Mr. Amunds stated it would be helpful for him to know the
tweeked costs for Option #2 and Option #3. He said if, for
example, Option #2 was $6 Million and Option #3 turned out to be
$7 Million, it would be easier to make a decision. Mr. Amunds
asked if those numbers could be provided before a vote.
Mr. Harris stated if there is any delay it is because of the
Board. He said we beat this thing to death each time it comes
up. Mr. Harris made motion, seconded by Mr. Boyles, to accept
Option #3 in theory. Mr. Windes concurred this is conceptual.
3 yeas 2 nays (Mr. Amunds and Mr. Parisot voted no).
FACILITIES MAINTENANCE - SHALIMAR ANNEX PROJECT, DIRECTION
REQUESTED ON ELEVATION AND DESIGN CONCEPT
Mr. Turner stated two possible layout options are being
presented. One is a single-floor with three-story attached
tower and identified as Scheme A-1+3. The second is a two-story
facility and identified as Scheme B-2+2. Mr. Turner pointed out
Scheme A is cheaper to build. Upon inguiry by Mr. Parisot, Mr.
Turner said he does not know the price tag for Scheme A. Mr.
Parisot stated this new facility is basically an office
building.
Mr. Pat Balish, DAG Architects, provided the elevation drawings
and details of both options. The explanation included the
projected locations of the various entities. The exterior of
the building would be brick veneer. Scheme A would provide
63,042 square feet of space. Scheme B would provide 65,389
square feet of space. Mr. Steve Christopher of Lord & Son
Construction joined in the discussion on the two options. Upon
inquiry by Mr. Parisot, Mr. Christopher estimated the cost of
Scheme A at $12 Million.
Mr. Harris made motion, seconded by Mr. Boyles, to provide
conceptual approval to Scheme A-1+3. 4 yeas, 1 nay