READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 18, 2014 — Minutes — reading text
Part 2 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 34-Feb 4 2014 Minutes.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
commissioner individually. Mr.
Amunds made motion to authorize staff to work this issue. Mr.
Harris withdrew his motion and seconded Mr. Amunds’ motion.
5 yeas.
TOURIST DEVELOPMENT - FINAL PAYMENT TO DESTIN CHAMBER OF
COMMERCE FOR CONTRACT C08-1577-TDC
Mr. Schroeder requested approval of the final payment to the
Destin Chamber of Commerce for Contract C08-1577-TDC (invoice
February 4, 2014 -6- Minute Book 70, Page 224
Okaloosa County Board of County Commissioners
#45204) in the amount of $5,000. This is for the period of
July 1, 2013 through September 30, 2013.
Mr. Harris made motion to approve payment of the invoice. Mr.
Parisot seconded with a request to amend the motion to pay
contingent upon the Destin Chamber submitting a listing of how
the money was spent. Mr. Harris accepted the amendment.
5 yeas.
PUBLIC SAFETY - APPROVAL OF NATIONWIDE PROGRAMMATIC AGREEMENT
FOR COMMUNICATIONS TOWER IN SHALIMAR WITH VERIZON WIRELESS
Mr. Dino Villani, Public Safety Director, requested this item be
pulled. He advised the requestor (Verizon Wireless) found the
document they needed in their files.
PUBLIC SAFETY - APPROVAL OF AMENDMENT NO. 8 WITH CENTURY LINK
FOR 9-1-1 CIRCUIT BILLING
Mr. Villani requested approval of Amendment No. 8 to Contract
CO8-1671-PS with Century Link for 9-1-1 Circuit Billing. The
monthly cost iS approximately $15,500. Mr. Amunds made motion,
seconded by Mr. Parisot, to approve the contract amendment and
to authorize the Chairman to execute same. 5 yeas.
WATER & SEWER SYSTEM - AUTHORIZATION TO OBTAIN QUOTES FOR PIPE
AND OTHER RELATED MATERIALS FOR NEWCASTLE AREA WATER MAIN AND
FIRE PROTECTION PROJECT
Mr. Jeff Littrell, Water & Sewer System Director, requested
authorization for the Purchasing Department to solicit quotes in
lieu of bids for pipes and related materials for the Newcastle
Area Water Main and Fire Protection Upgrade Project. He noted
the department has a Community Development Block Grant (CDBG)
which will pay for most of the costs. Mr. Parisot made motion,
seconded by Mr. Amunds, to authorize the Purchasing Department
to seek gquotes in lieu of bids for the materials needed for this
project. 5 yeas.
PUBLIC WORKS - REQUEST FROM DESTIN 50 BEACH ULTRA FOR SPECIAL
EVENT PERMIT AND WAIVER OF FEES
Mr. John Hofstad, Public Works Director, stated Destin 50 Beach
Ultra has submitted a request for a special event permit for a
5K and 50-mile run on February 15-16, 2014, using the beach area
at James Lee Park in Destin. The organization has also
February 4, 2014 -7- Minute Book 70, Page 225
Okaloosa County Board of County Commissioners
requested the event permit fees be waived. He noted the Board
has waived the fees in the past three years. Mr. Harris made
motion, seconded by Mr. Boyles, to approve the permit and to
waive the permit event fees. 5 yeas. (NOTE: This event is a
fundraiser to support the Special Operations Warrior
Foundation. )
PUBLIC HEARING - REQUEST FROM MILLIGAN FIRST ASSEMBLY OF GOD
CHURCH TO AMEND FLUM DESIGNATION AND REZONING DISTRICT FOR FIVE
ACRES ON HIGHWAY 4
Mr. Stanford read the advertised legal notice for public hearing
to consider the request of Westerra Development, Inc. as agent
for Milligan First Assembly of God Church, Inc. to amend the
Future Land Use Map (FLUM) designation for five acres located at
5408 Highway 4 from Rural Residential (RR) to Commercial (C) or
a more restrictive designation. Further, if the FLUM amendment
1s approved, the petitioner asks for the zoning designation to
be changed from Residential Rural (RR) to General Commercial (C-
3) district or a more restrictive zoning district.
Because this is a quasi-judicial proceeding, Mr. Dowd asked
anyone interested in speaking at the public hearing to stand and
be sworn in at this time.
Mr. Elliot Kampert, Growth Management Director, stated the
reason for this request is the Church would like to construct a
10,000-square foot Family Life Center. The floor area ratio and
impervious surface coverage in the current RR zoning will not
accommodate the Church’s planned construction.
Mr. Kampert reported there has been no public comment or
opposition, the Planning Commission unanimously recommended
approval of the request at its January 9 public hearing, and
staff has no objection to the proposed changes in the FLUM and
zoning district. Upon inguiry by Mr. Harris, Mr. Kampert stated
the property in question is owned by the Church.
No one came forward to speak in favor of or in opposition to the
request. Mr. Boyles made motion, seconded by Mr. Harris, to
adopt ordinances amending the FLUM designation and rezoning the
subject property as advertised. 5 yeas.
ORDINANCE NO. 14-02 (FLUM amendment)
ORDINANCE NO. 14-03 (rezoning)
February 4, 2014 -8- Minute Book 70, Page 226
Okaloosa County Board of County Commissioners
FACILITIES MAINTENANCE - SHALIMAR ANNEX ASBESTOS SURVEY
Mr. Amunds made motion to approve this agenda request. Mr.
Windes suggested the department head provide a brief summary of
his request. Mr. Don Turner, Facilities Maintenance Director,
requested $8,000 be transferred from Capital Projects Reserves
301-3160 to Facilities Maintenance 0112-546620 in order to
conduct an asbestos survey of the buildings to be demolished at
the Shalimar Annex site. Mr. Boyles seconded Mr. Amunds’s
motion. 5 yeas.
FACILITIES MAINTENANCE - REQUEST FOR FUNDS FOR REMODELING THE
SHERIFF’S SHALIMAR CAMPUS
Mr. Turner stated there are six operating units remaining in the
Shalimar Annex, three of those are Sheriff’s units. It is
necessary to vacate all occupants of the Annex to adhere to a
timeline for demolition of the facility and timely completion of
the construction of the new building. He said the contractor
has set a date of May 1, 2014 for the Shalimar Annex to be
vacated and the demolition of buildings to begin.
Mr. Turner stated the plan is to build a new 10,000-square foot
building for the three Sheriff's units at the Sheriff's Shalimar
Campus. Because the footprint of the new building at the
Sheriff's Campus is smaller than the space currently occupied by
his units in the Annex and the necessity of vacating the
facility, it will be necessary to provide temporary and
permanent working space at the Sheriff's complex. Funding is
needed for materials to remodel the space. Also, in order to
expedite completion of this space, funding is needed for
overtime, temporary labor, and to outsource some of the work, 1f
needed. He requested an amount not to exceed $150,000 to
expedite the remodeling at the Sheriff’s campus. The funds were
requested to be transferred from Capital Projects Reserves 301-
3160 to the Sheriff’s Shalimar Remodel 301-3120 account.
Mr. Parisot asked for an explanation of this statement in the
agenda request, “The cost to extend the necessary leases for the
additional three months would likely be more than $80,000 per
month, or almost $250,000.” Mr. Turner replied the $80,000
figure is relative if the Shalimar property is not vacated and
people must remain there. He said it is based on the $960,000
annual lease payment.
February 4, 2014 -9- Minute Book 70, Page 227
Okaloosa County Board of County Commissioners
Mr. Parisot expressed concern about the in-house work to be
carried out by the Facilities Maintenance staff. He said their
primary duty is to maintain the current facilities. Mr. Amunds
commented that it is his understanding the Sheriff's Office will
be responsible for the remodeling and Don Turner and his staff
will assist with pulling permits. He added the majority of this
will be done with inmate labor. Mr. Turner stated the
electrical, mechanical and plumbing work will be done by
Facilities Maintenance personnel and Facilities Maintenance will
manage the resources. He stressed that he does not intend to
spend $150,000. Upon inguiry by Mr. Parisot, Mr. Turner
estimated $30,000 in staff overtime.
Mr. Parisot pointed out there is another item later on the
agenda regarding additional funding to provide office spaces for
Guardian ad Litem at the old Fort Walton Beach Hospital. He
said that project is also to be done in-house and questioned Mr.
Turner's ability to do this work with limited staff. Upon
inquiry by Mr. Parisot, Mr. Turner answered there will be no
impact because the preparation of office space at the old
hospital for Guardian ad Litem is almost complete, noting all
that is left is installation of carpet. Mr. Parisot responded,
“But you are just now asking for approval.” Mr. Turner replied
it was just labor and he was not trying to get ahead of the
Board.
Mr. Parisot voiced his uneasiness regarding the funding requests
presented by Facilities Maintenance. He said the reguests on
today’s agenda total $218,000 to be taken from Capital Projects
Reserves. He said currently the balance in that fund is
$606,000 and another payment of $400,000 must be made to the
Meigs Trust. Mr. Parisot was troubled about overspending that
fund.
Mr. Turner stated the amounts requested are all estimates and
they are as accurate as can be at this time. He announced at
this time that Larry Phillips, who was hired to provide
technical assistance for the Crestview Courthouse design
project, is present this morning. Mr. Turner stated $32,000 was
requested for technical assistance but only $15,000 has been
spent. He said he does not expect to spend more than $20,000
and will be returning the surplus funds. Continuing, Mr. Turner
stated he expects to have surplus funds in these other requests
as well.
February 4, 2014 -10- Minute Book 70, Page 228
Okaloosa County Board of County Commissioners
Mr. Amunds said perhaps Mr. Parisot would be content to approve
only $100,000. Mr. Parisot stressed the importance of the
cumulative effect and said a workshop to address facilities is
needed. He said there should be a serious discussion about how
much debt service the county will incur. Mr. Parisot commented
that talk about the old Fort Walton Beach Hospital creeps in
every now and then but it is not being discussed today.
Mr. Turner underscored the importance of the Board making a
decision today. He pointed out the Board decided at the last
meeting to extend the lease at Uptown Station for one year for
the Property Appraiser and Tax Collector. Mr. Turner stated the
deadline for completing the new facility in time to move these
two officials in is already a weight on him. He reiterated the
date to begin demolition of the Shalimar Annex is May 1.
Mr. Boyles stated he will echo some of Mr. Turner’s comments.
He said the picture is becoming clearer. Mr. Boyles stated the
big picture is providing a facility for the next thirty years.
He conceded the Guardian ad Litem work is of a temporary nature
but feels we must look at the big picture. Mr. Boyles said he
is supportive of the request and made motion, seconded by Mr.
Amunds, to approve a not-to-exceed budget transfer of $150,000
from Capital Projects Reserves to the Sheriff’s Shalimar Remodel
Project with the understanding all expenditures will follow
Purchasing Policy. 5 yeas.
FACILITIES MAINTENANCE - SELECTION OF PREFERRED DESIGN CONCEPT
FOR CRESTVIEW COURTHOUSE PROJECT
Mr. Turner said he has for presentation the design concepts
prepared by Mr. Phillips for Board consideration. He advised
that he and Mr. Phillips met with all the user groups to develop
the plans. Mr. Turner emphasized these are not plans for
construction but ideas for development. He said they are
basically concepts for small, medium, and large scale renovation
and expansions of the Crestview Courthouse. Once a decision is
reached on the scope, the department will turn it over to the
design contractor.
Mr. Amunds stated previous talk was to add an additional
courtroom to the Courthouse but the concept drawings for
renovation/expansion of the Courthouse and the two. other
projects is becoming “pricey.” He also felt it has gotten out
of control, saying he could support $200,000 or $300,000 but not
$17 Million.
February 4, 2014 -11-
