proposed neighborhood traffic study is...
Sidewalk Improvements $50,000
The project constructs new and infill sidewalks for the purpose of providing a pedestrian transportation network
throughout the entire city that will link the residential neighborhoods to each other and to public, recreational and
commercial land...
Street Resurfacing $500,000
The city resurfaces a portion of roadways each year. Resurfacing is accomplished by conventional overlay or milling and
resurfacing. Overlaying a road surface required the use of compacted SP 9.5 asphalt to a depth of 1" to 1 1/2" over...
Total: $1,315,000
City of Fort Walton Beach | Budget Book 2025 Page 306
Public Works & Utility Services Requests
Itemized Requests for 2025
Lift Station No. 11 Replacement $600,000
Lift-Station #11 is in the sidewalk and partially under McGriff Street NE. The structure is made of brick and has less than a
24" opening for service personnel to access the station for pump replacement and repairs. This station is...
Water Line Replacement $85,000
Replace substandard (both in size and material) water lines with new PVC or ductile iron mains for increased water flow
and improved fire protection. The substandard water mains consist of galvanized iron or cast iron and transite and over...
Total: $685,000
Sewer Collection System Requests
Itemized Requests for 2025
Sewer System Lining and Grouting $100,000
The city has 110 miles of sewer lines, with a majority of the lines consisting of clay pipe. Clay and unlined cast iron pipes are
susceptible to root intrusion, offset joints and cracking due to the brittleness of the material. These...
Total: $100,000
Police Requests
Itemized Requests for 2025
Police Facility Improvements $59,372
This remodel will include the upgrading of electronic hardware, such as computer monitors and server racks. It will also
include the implementation of hardware to move the communications center into a position to become a real-time crime
center....
Total: $59,372
City of Fort Walton Beach | Budget Book 2025 Page 307
Community Redevelopment Agency Requests
Itemized Requests for 2025
CPTED Projects - Chester Pruitt Lights & Bathroom $165,000
Improvements to the built environment based on recommendations from a Crime Prevention Through Environmental
Design (CPTED) analysis.
CRA Wayfinding Signage System $75,000
The Community Redevelopment Area (CRA) Plan identifies locations for updated wayfinding signage through the CRA to
establish a unique identity for the CRA and enhance the CRA's vision to improve economic development, quality of life, and
sense of...
Total: $240,000
1/2 Cent Sales Tax Requests
Itemized Requests for 2025
Park Lighting and Fencing (Oakland, Kenwood, Vesta Heights) $253,000
Oakland Park Lighting $163,000Oakland Park Fencing $45,000Kenwood Park Fencing $45,000
Total: $253,000
City of Fort Walton Beach | Budget Book 2025 Page 308
Capital Improvements: Multi-year Plan
Total Capital Requested
8,537,372
14 Capital Improvement Projects
Total Funding Requested by Department
2025 $2,802,372.00
2026 $1,170,000.00
2027 $1,095,000.00
2028 $1,335,000.00
2029 $2,135,000.00
$0 $800K $1.6M $2.4M
1/2 Cent Sales Tax Community Redevelopment Agency
Culture & Recreation Police
Public Works & Utility Services Sewer Collection System
Total Funding Requested by Source
2025 $2,773,000.00
2026 $1,195,000.00
2027 $1,120,000.00
2028 $1,360,000.00
2029 $2,160,000.00
$0 $800K $1.6M $2.4M
Funding Source 1
City of Fort Walton Beach | Budget Book 2025 Page 309
Capital Costs Breakdown
2025 $2,952,372.00
2026 $1,170,000.00
2027 $1,095,000.00
2028 $1,335,000.00
2029 $2,135,000.00
$0 $800K $1.6M $2.4M
Capital Costs Operational Costs
Cost Savings & Revenues
There's no data for building chart
Culture & Recreation Requests
Itemized Requests for 2025-2030
Median Upgrades $150,000
Upgrades to 15 medians on Miracle Strip Parkway from Wright to City Hall. Upgrades to include: sod, irrigation, shrubs
Total: $150,000
City of Fort Walton Beach | Budget Book 2025 Page 310
1/2 Cent Sales Tax Requests
Itemized Requests for 2025-2030
Brooks Street Public Parking Lot $500,000
The Brooks Street parking lot project would include the construction of a public parking lot in coordination with a private
property owner through a public private partnership to provide additional public parking in Downtown Fort Walton Beach.
Hollywood Boulevard Reconstruction $150,000
Funding would be for the design and engineering of improvements to Hollywood Boulevard. Hollywood Boulevard would
be reduced to one vehicular lane in each direction, and the remaining width would be repurposed to provide multi-
modal...
Neighborhood Traffic Improvements $50,000
Neighborhood Traffic Improvements previously identified in studies. Including but not limited to speed feedback signs,
raised crosswalks, signage.
Neighborhood Traffic Study - Elliot Point & Northwest $245,000
Perform a neighborhood traffic analysis in order to evaluate speeding, volume, and pedestrian safety. Study areas to
include an entire neighborhood at a time. Areas subject to fund availability. The proposed neighborhood traffic study is...
Sidewalk Improvements $250,000
The project constructs new and infill sidewalks for the purpose of providing a pedestrian transportation network
throughout the entire city that will link the residential neighborhoods to each other and to public, recreational and
commercial land...
Street Resurfacing $2,100,000
The city resurfaces a portion of roadways each year. Resurfacing is accomplished by conventional overlay or milling and
resurfacing. Overlaying a road surface required the use of compacted SP 9.5 asphalt to a depth of 1" to 1 1/2" over...
Total: $3,295,000
Public Works & Utility Services Requests
Itemized Requests for 2025-2030
Lift Station No. 11 Replacement $3,300,000
Lift-Station #11 is in the sidewalk and partially under McGriff Street NE. The structure is made of brick and has less than a
24" opening for service personnel to access the station for pump replacement and repairs. This station is...
Water Line Replacement $425,000
Replace substandard (both in size and material) water lines with new PVC or ductile iron mains for increased water flow
and improved fire protection. The substandard water mains consist of galvanized iron or cast iron and transite and over...
Total: $3,725,000
City of Fort Walton Beach | Budget Book 2025 Page 311
Sewer Collection System Requests
Itemized Requests for 2025-2030
Sewer System Lining and Grouting $500,000
The city has 110 miles of sewer lines, with a majority of the lines consisting of clay pipe. Clay and unlined cast iron