READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 09-22-2009 special — reading text
Part 8 of 12. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-24083-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
OF FORT WALTON BEACH,
4 FLORIDA, AMENDING DIRECTIONS -THE COMPREHENSIVE PLAN
5 OF THE CITY OF FORT WALTON BEACH: 2008, PURSUANT TO
6 CHAPTER 163 OF THE FLORIDA STATUTES; PROVIDING FOR
7 AUTHORITY; AMENDING THE TRANSPORTATION ELEMENT;
8 PROVIDING FOR CONFLICTS AND SEVERABILITY AND SETTING
9 AN EFFECTIVE DATE.
10
11 NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
12 OF FORT WALTON BEACH, FLORIDA, AS FOLLOWS:
13
14 Section 1. Authority
15 a. The City is authorized to adopt amendments to its Comprehensive Plan
16 pursuant to Home Rule Powers, the Local Government Comprehensive Planning and Land
17 Development Regulation Act, and section 2 of the City Charter.
18
19 b. The intent of this ordinance is to revise the Transportation Element of the
20 City' s Comprehensive Plan, as codified in Volume III of the City' s Code.
21
22 C. On , 2009, the Municipal Planning Board acting as the
23 Local Planning Agency, upon application of the City, considered the request and
24 recommended approval of the adoption of the Transportation Element.
25
26 d. On , 2009, and , 2009, the City Council
27 considered the recommendation of the Land Planning Agency and the coordination and
28 consistency of these amendments with the other elements of the Comprehensive Plan.
29
30 The Council has for full participation in the
e. City provided public
31 comprehensive planning and amendment process and has considered and responded to
32 public comments.
33
34 Section 2. Amendment of the Transportation Element
35 The Transportation Element of the City' s Comprehensive Plan is amended by
36 repealing all current language as indicated in Exhibit 1 which is attached and incorporated
37 in this ordinance and adopting the following provisions:
38
39 1. INTRODUCTION
40
41 The purpose of this Element is to establish a multi -modal transportation plan for the City of
42 Fort Walton Beach. The focus of the plan is to implement components of the TCEA
43 Transportation Concurrency Exception Area) and to identify key, bikeway, pedestrian
FWB 2010 -2020 Comprehensive Plan I The Transportation Element
Atty Rev 9/ 17/ 2009 1 EAR Based Amendment
44 way, mass transit, and road improvements needed within the City of Fort Walton Beach
45 and consider funding mechanisms for implementation. Under the requirements of
46 163 3180, F S the City is considered a Dense Urban Land Area, and as such, the entire
47 City is designated as a TCEA (Transportation Concurrency Exception Area).
48
49 Traditionally, transportation concurrency meant that a development would provide for
50 increased LOS for motorized traffic. It is impossible, however, to manage future growth
51 and traffic problems by this method alone. Transportation within the City of Fort Walton
52 Beach takes many forms including walking biking, mass transit, and multiple occupancy
53 motorized travel. Within the boundaries of a TCEA, development or redevelopment ( all
54 phases) will be required to meet development standards based on the development' s trip
55 generation and proportional impact on roadway facilities instead of LOS Standards.
56 Developments will mitigate the effects of increased average daily trips by meeting certain
57 mitigation performance criteria.
58
59 Because the City is within a designated Metropolitan Planning Organization ( MPO) area,
60 the Transportation Element is coordinated with the Long Range Transportation Plan
61 LRTP of the Fort Walton Beach MPO.
62
63 It is intended that the goals, objectives, and policies, the Future Transportation Map, and
64 the EcoWay Map series included within this Element will guide the development of future
65 City of Fort Walton Beach transportation systems and facilities.
66
67 2. GOALS, OBJECTIVES AND POLICIES
68
69 The Transportation Element goals, objectives and policies of the City of Fort Walton Beach
70 are as follows.
71
72 Multi -Modal Traffic Circulation
73 The purpose of the traffic circulation portion of this element is to establish the desired and
74 projected roadway, bikeway and pedestrian way system for the City of Fort Walton Beach.
75
76 GOAL A - PROVIDE FOR A SAFE, ENERGY EFFICIENT AND UNCONGESTED
77 MULTIMODAL TRANSPORTATION SYSTEM IN THE CITY, AS WELL AS TO AND
78 FROM THE SURROUNDING REGIONAL AREAS, IN A MANNER THAT NOT
79 ONLY ACCOMMODATES TODAY' S DEMAND BUT ALSO REASONABLY
80 ANTICIPATES GROWTH.
81
82 OBJECTIVE 1 — CONTINUE TO PROMOTE ENERGY -EFFICIENCY AND A
83 MULTIMODAL, PEDESTRIAN -FRIENDLY URBAN ENVIRONMENT BY
84 IMPLEMENTING COMPONENTS OF THE TRANSPORTATION
85 CONCURRENCY EXCEPTION AREA ( TCEA) COTERMINOUS WITH THE
86 FORT WALTON BEACH CITY LIMITS.
87
FWB 2010 -2020 Comprehensive Plan N The Transportation Element
Atty Rev 9/ 17/ 2009 1 EAR Based Amendment
2-
88 Policy 1: A Transportation Concurrency Exception Area ( TCEA) will continue to
89 promote urban redevelopment, infill development, a variety of transportation
90 choices and opportunities, the City's economic viability, desirable urban design and
91 form, a mix or residential and non -residential uses, and streetscaping /landscaping
92 for roadways within the City.
93
94 Policy 2• All land uses and development located within the TCEA, except for
95 Developments of Regional Impact ( DRI), will be required to meet development
96 standards based on the development' s trip generation and proportional impact on
97 roadway facilities instead of LOS standards.
98
99 Policy 3: Developments shall mitigate the effects of increased average daily trips by
100 meeting certain mitigation performance criteria outlined in Table 1 below.
101
Table 1. TCEA Trip Generation Performance Criteria
Net Av. Daily Trip Generation No. of Points which Must be Obtained
Less than 25 25
26 to 50 50
51 to 100 75
101 to 250 150
251 to 500 300
500 to 1000 350
1001 to 5000 400
Greater than 5, 000 trips 500
102
103
104 Policy 4: The City hereby adopts a point system which includes acceptable
105 strategies for fulfilling the development requirements for multi -
modal
106 transportation within the TCEA. Acceptable strategies for multi -
modal
107 transportation will include providing physical infrastructure improvements and
108 implementing transportation demand management ( TDM) programs. The LDC will
109 be amended within one year of adoption of this plan to establish specific mitigation
110 strategies acceptable under this policy.
111
FWB 2010 -2020 Comprehensive Plan I The Transportation Element
Atty Rev 9/ 17/ 2009 1 EAR Based Amendment
3-
112 Policy 5: In lieu of meeting the requirements set forth in the policy above,
113 developments may choose to contribute to the mitigation fund in which other
114 funding may be combined to complete larger multi -modal projects. The payment
115 amount will be set forth in the LDC which will be revised accordingly within one
116 year of adoption of this plan, but will be no less than the value of required projects
117 for mitigation. If a development is in a special planning area, the mitigation fund
118 payment should be used for a project in the same area so that improvements benefit
119 the new development.
120
121 Policy 6: Developments will implement approved mitigation strategies within their
122 respective planning area designation when possible as shown on the FLUM.
123
124 Policy 7: Developments will be required to submit trip generation information for
125 developments within the TCEA utilizing the most recent edition of " Trip
126 Generation" by
published the Institute of Transportation For
Engineers.
127 redevelopment sites, the City will also collect information about trip credits for the
128 previous use of the property.
129
130 Policy 8: The City Engineer will have final approval. through development review
131 process, of the combination of activities or payment chosen to satisfy the point
132 requirement for each development
133
134 Policy 9: In order to promote redevelopment and infill within each planning area
135 designation, the City, Community Redevelopment Agency, and federal or state
136 governments, shall contribute funding, when feasible, to provide for multi -
modal
137 transportation improvements. Projects identified in the EcoWay map series will be
138 given funding priority. Transportation modifications that are required due to traffic
139 safety and /or operating conditions and are unrelated to transportation concurrency
140 will be provided by the developer.
141
142 Policy 10: To promote highly desirable development within the TCEA, the City or
143 Community Redevelopment Agency may enter into agreements with developers to
144 provide all or part of the transportation needs that are required by policies within
145 this objective.
146
147 Policy 11: Within the TCEA, development or redevelopment will provide
148 improvements such as the following as part of trip generation mitigation:
149 a. Sidewalk connections from the development to the public sidewalk;
150 b. Cross -access connections /easements or joint driveways;
151 c. Deeding of land along the property frontage to the City, as needed, for
152 the construction of public sidewalks, bus turnout facilities and /or bus
153 shelters to serve the development.
FWB 2010 -2020 Comprehensive Plan I The Transportation Element
Atty Rev 9/ 17/ 2009 1 EAR Based Amendment
4-
154 d. Closure of overly -wide or excessive curb cuts at the
existing
155 development site, as defined in the Access Management portion of the Land
156 Development Code;
