READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 02-26-13--regular — reading text
Part 69 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31638-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
a
February 8, 2013
i
Project: Dan Russell Pier
Location:
Panama City,
Owners Representative:
Mn Davc IIcmphill
B,%SI4:RVIII.- DONOV.\ N, INC.
119 West Main Strect,
Pensacola, Florida 32591
850) 438 -9661 ex- 4360
dkh(a`bdi -ae N>m
Gross square feet of construction:
65,000 +
Construction cost:
7, 703, 237. 00
Project Status:
Dan Russell Pier- Completed 1/ 2010
SFI Project Manager:
Clulod Vorela
SFI Project Superintendann
Fred Maxwell
Relevance/ Scope of Work: As designed
by, Baskervilh- Donovan, Inc„ chic project
tcquircd SFl to install 107' long 30-
diamen r occtgonal concrete pile as the
fomtdation for one of the longest piers on
Florida's Gulf Coast. I7ve new 1, 500 font
long piers which extend into the Gulf of
Nle,, ico were constructed from the top
down to avoid impact to the seosidve
marine habitats in the surrounding waters.
llte installation of removable deck panels
fastened to concrete beams allows wave
energy to dissipate during periods of
nvere weather which are common ut this
location.
Ilia Dan Russell Pier was completed
ahead of schedule
2781 S.W. 56 Avenue . Pembroke Park, Florida 33023
en,-- ronn\ noa oAPo C— / oSa\ eGG_nn R7 un.,.., chn. ollnninun. lafinn rnm
In Iona (nugslx3 to Iuawaoeidaa El.O-£ l 811 : ZOZZ) ' oul uo[lepunoj aullaaoyg - CIIS £ bO-£ l :IUawyoelIv
Zn N
a sFT February 8, 2013
a
Y
an
Project: MB Miller Piers
Location:
Bay County, Florida
Owners Representative;
Ivfr. Rick VlcAlmond
BAY COUN' T' Y' PUBLIC IS -ORI4S Depart
225 McKenzie 3renue,
Panama City, FL 32401
Sif)) 78+ 1060
Fos: ( 8A)) ?4 & 8343
W' W' \ e. CU. ba . I u5
CO[ rSCNCtIan COST
S7, C. F6, 763. 011
Project Status:
b1R htillet Pier- Complete 8/ 2010
SFI Project Manager:
Carlos Vaeela
SFI Project Superintendanc
Fa d- nlaswen
Relevance/ Scope of Work: As designed
br Baskerville- IJonovaq Inc-, this Project
reyuired SI7 N install Llp' long 3i P'
diamemr octagonal concrete p0e as d[ e
kounciarian for one of the longest piers on
Florida' s Gulf Coast. 1' hc new 1, 500 foot
long piers which earend into the Gulf of
tilesica weer consnvcted from the tap
down to avoid impact to the sensitive
motive habitats in the surrounding waters.
tMe insrallatioo oC removable deck panels
fastened m concrete beams allows wav-r
rn n m dissipate dtuiog periods of severe
weather which are eonvnnn in this location.
NGller Pier was completed ahead of
schedule.
2781 S. W. 56 Avenue . Pembroke Park, Florida 33023
vw....... rocM nnc neon cam... roam onc_nn RO ..,.. n., e6nrdimfnun Ao} Inn nm
Ins oo0 6upslx3 to luauueoeldaa £ t0- r ell ZOZZ) oul uopepunoq oullwogS-( 118£ LO- Et luawgoelly j"
O1
N—
a
o
SF' a
v
February 8, 2013
a
Project: Blue Points Marina
Location:
700 Scallop Drice
Cape Canaveral, Fl,
Owners Representative:
Charles Nhorap, Project Manager
X & J CONSTRUCTION CORP.
100 Eyster Blvd., Rockledge, Fl, 32955
321) 632 -7660
I' i riDw' cn i. ivn it rncnnn
Completion Date:
2/ 17/ 09
Gross square feet of construction
23, 960
Construction cost:
2, 726, 467
Project Status:
Complercd
SFI Project Manager:
Matt Sturm
SFI Project Superintendant.
Fred Haswell
Relevance / Scope of Work As designed by
Coastal Systems International, Inc. For
i9uepohus International Fisheries, Inc this
project included construction of 3, 529 square
feet filed docks including a new fueling
platform, installation of 4,980 square feet of
Tcchnomanner` I floating
docks rich round ICP concrete quide pile,
aluminum gangways and associated accessories.
SFI also installed (230) 18" diameter auger pile
105' detp directly adjacent to the costing
seawall as the foundation for a new cast -in-
place concrete forklift slab.
The multiple types of Construction required to meet the ownees schedule were carried out simultaneously. Thanks to
careful coordination by our management and field stafFwith \ X'& J and the owner, SFI delivered thus project on -time
and widnow incident.
2789 S.W. 56 Avenue • Pembroke Park, Florida 33023
en,__ / ncA\ nOC MCn e. In[ A\ o.. Mn0 un. nu nFnrolinufnundniinn rnm
le Hood 6ulls! x3 to luawaoelday £ LO-£ L 911 : ZOZZ) oul uollepunoj aullaaoyS - ale £lo-£ L : luawyoelly
m I , N_
SFT
mmmm
a
a
February 8, 2013 mCL
Project: Haulover Park Marina Phase II
Location:
North bfiami Beach, Florida
Owners Representative:
FAgar Lugo
L, TlANIl- DADEPARKS & RF REA' I' LON
275 NA(%2 "d Ace., Nintni, I- L 33129
305) 755 -7850
r uol le
Completion Date:
Hav 2007 — lanu: 2009
Gross square feet of construction
00( 00+
Construction cost:
9, 957. 841. 00
Project Status:
Substantially Complete
SFI Project Manager:
Carlos Varcla
SFI Project Superintendant:
14ed Haswell
Relevance / Scope of Work: As designed by Coastal
Engineering & Science, Inc. this project included
construction of 625 linear feet of new pre -cast
concrete bulkhead, 4 new main piers designed to
accommodate 85 additional vessels. Wong with
excavating 47, 000 cubic cards of esisang material to
create a new basin, upgrades to existing utilities
including are suppression, potable water, lighting
and landscaping, two 90' deep injection wells were
also constructed. This project was constructed in
vo phases so the existing commercial fishing Ile"
could remain operational during construction. This
project required constant and precise coordination
and .scheduling with the owner and the cngineer to
inimize the impact to the public. This project was
completed on time with no injuries to the public or
our workforce.
Shoreline Foundation, Inc. is proud to have
constructed this legacy project for the Sliamr -Dade
Parks & Recreation Deparunem.
2761 S. W. 56 Avenue . Pembroke Park, Florida 33023
en,- -- / nCal osa_nnnn Ce In9n\ oa S_ nn R9 unana, aFnrnitnnfnnnrioiinn ram
le >l000 6ugslx3 fo luawaoeldaa Eto-£ t 911 ZOZZ)' oul uopepunoj aullaaoyS- 019 E LO- E L: luawyoelltl F
N"
SF - a
February 8, 2013
Q.
Project: Buttonwood Bay Marina
Location:
96000 Overseas Highway
KcV largo, @T. 33037
Owners Representative:
Lissene Lopez and Don Horton
Buttonwood Bay Condonvnium Association,
Inc.
95000 Overseas 1- 6g6way, Key Largo, FL 33037
305) 852 -9607
Completion Date:
august 2S, 3009
Construction cost
1, 978, 135. 00
Project Status:
Cmnplcred
SFI Project Manager:
M1latt 5wnn
SFI Project Superintendanr.
Fred M11,cvwell
Relevance / Scope of Work Removing,
Replacing and or installation of over 500 wood
piles, 140 finger piers, fender piles, bumper
piles, plastic pile caps, concrete dock cap and
face, and any associated accessories.
llso includes Flectrical and Plumbing, remove
and replacement of ail piping and wining and
teplacement according to local and state codes
in effect at the time of installation.
2761 S. W. 56 Avenue. Pembroke Park, Florida 33023
ph......, , nu\ ml. oA .-- 1.. A1 OQR -nARO arum, ehnmlincinunrioiinn nnm
le Hoop 6uilsprg to IuawaceldeN £ LO- EL ell : ZOZZ) oul uollepuno i sullarogS - 019 £ LO- EL : Iuawgoelltl F2
a SF T" jig
lA N,
a
8, 2013 N0
Project: Founders Park Marina
Location:
Islamorada, Florida
Owners Representative:
Alvlea F_ Milander, Director of public Works
1 LLAGE OF iSLAMORADA
81990 Orcrseas Highway, Islamotada, F1. 33036
305) 66463011
mvI . 11-
Completion Date:
8/ 31/ 2008
Gross square feet of construction
14, 954
Construction coat:
53, 91111820
Project Status:
Completed
SFI Project Manager:
Matt Smrm
SFI Project Superintendanu
Fred ntasw•eu
Relevance / Scope of Work: As designed by
Coastal Planning & Fogincering, this project
consisted of 2, 100 fine. feet of used dock and
finger pier replacement, bulkhead repairs, and
upgrades to electrical, plumbing, fire suppression
and fuel si teins. As required by the owner, this
project was constructed in three phases, keeping
the facility operational throughout the
construction process.
SFI project management and field ataff