READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 02-26-13--regular — reading text
Part 39 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31638-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
shall be responsible for restoring the
surrounding work area to its original condition. This includes all asphalt, sod,
concrete, and timber boardwalk that is damaged during construction. If any
damage to the existing pump -out station is incurred during construction, the
Contractor shall be responsible for repairing and /or replacing the pump -out N
station.
NN
5. 2 SPECIFICATIONS
CuE
5. 2. 1 All work shall be completed by the successful bidder and include all necessary 0
materials, labor, and equipment needed to complete the project. The selected 0
contractor shall complete all the work in conformance with the exemption m
verification and construction drawings. The following is a breakdown of the n
scope:
0
ri
5. 2. 1. 1 Mobilization of all equipment and materials to the site. m
5. 2. 12 Labor and materials for the installation of erosion controls both in c
the water and on land.
E
5. 2. 1. 3 Removal and disposal of the entire existing dock. U
5. 2. 1. 4 Labor and materials for the installation of either 6 -inch or 8 -inch,
2.5 CCA treated pilings as specified on the plans set and directed
by the City.
5. 2. 1. 5 Labor and materials for the installation of 0. 030" Polyethylene
wrapping from sea floor to one ( 1) foot above Mean High Water
MHW).
Page 22 of 28
ITB N13 -Ol3
Replvcement of Bxisfing Buat Dock at Fn Walton Lending
5. 2. 1. 6 Labor and materials for the installation of all ledgers, joists, and
supports.
5. 2. 1. 7 Labor and materials for the installation of either pressure treated or
composite decking.
5. 2. 1. 8 Labor and materials for the installation of handrails on the dock.
5. 2. 1. 9 Replacement of lighting, conduit, and support am.
53 PERFORMANCE SCHEDULE:
5. 3. 1 The Contractor shall commence performance within fourteen ( 14) days of receipt
of notice to proceed.
5. 3. 2 This is a time sensitive project and by responding to this bid, the contractor
understands that all work performed shall be completed no more than sixty
60) days after the notice to proceed is issued. The boat dock must be must be
replaced in entirety and allowed for public use for the project to be considered
substantially complete.
NONN
C
EE
UO
m
M
OM
mH
C
LUEE
Q
Page 23 of 28
ITB 413 -013
RWlacen o t of Existing Boat Dock at Fort Welton Landing
SECTION 6 - PRICING SHEET
INVITATION TO BID #13 -013
You are invited to bid REPLACEMENT OF EXISTING BOAT DOCK AT FORT
on the following: WALTON LANDING for the City of Fort Walton Beach, FL mc
UNIT COST TOTAL
L
N
1 I LS Mobilization
2 1 LS Erosion Control
3 1 LS Removal & Disposal of Entire Existin. Dock LLm
4 1 LS Hot Dipped galvanized hardware, fasteners & 0
Su orts.
Otan
5 1 LS Labor & Materials ( w /o hardware) for the
Installation of 6" 2. 5 CCA Treated pilings N
with white round PVC pile caps. U.1x
1 LS Labor & Materials ( w /o hardware) for the 0
6
Installation of 0. 030" Polyethylene wrapping
7 1 LS
on 6" pilings from sea floor to One ( 1) Foot
above Mean High Water ( MHW).
Labor & Materials ( w /o hardware) for the
installation of pressure treated ledgers, joists
caN6vEu
t oM
8 1 LS
supports.
Labor & Materials ( w /o hardware) for the
0M
m
installation of pressure treated decking.
9 1 LS Labor & Materials for the installation of
handrails. NN
l0 I LS Replacement of 10' High Light, Conduit and
support arm. c
TOTAL BASE BID
EEU
4A I LS Type 304 & 316 Stainless Steel hardware, 0
fasteners & supports.
5A I LS Labor & Materials ( w /o hardware) for the 0Min
installation of 8" 2. 5 CCA -treated pilings M
with white round PVC Pile caps.
6A 1 LS Labor & Materials ( w /o hardware) for the
Oei
m
installation of 0. 030" Polyethylene wrapping
on 8" pilings from sea floor to one ( 1) foot
c
above Mean High Water ( MHW).
E
SA 1 LS Labor & Materials ( w/ o hardware) for the
installation of composite decking.
Um
TOTAL ALTERNATIVE BID ITEMS
NOTE ALI, ITEMS QUOTED MUST BE IN COMPLIANCE WITH THE
1:
SPECIFICATIONS. IF YOU ARE TAKING EXCEPTION, INDICATE THOSE
EXCEPTIONS ON COMPANY LETTERHEAD AND ATTACH TO THIS INVITATION TO
BID.
Page 24 of 28
iTB d13 -013
Replacement of Existing Boat Dock at Fon Welton Landing
I. FOB Point Delivered
2. Terms of Payment: ( e. g. Net 30)
days from the
3. The City shall receive shipment or project completion notice within _
date Vendor receives official Purchase Order or Notice to Proceed.
Recheck your quotations prior to submission.
Bids may not be changed after being opened.
aM
m
C
LUEN
