READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 02-26-13--regular — reading text

Part 24 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-31638-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BASE BABE 2. 51 3. 43 3. 098 20510 7976 2. 36 1. 921 12760 BA$£ 2. 53 25YR 0m9} IR Basin 1 Pre 29133 BASE 9. 00 4. 33 9. 376 25YR09HR Basin 1 P BASE 9. 02 3. 09 3. 977 25YROBHR Basin 1 P[ s 12. 00 1. 61 353 44 44 BASE 25YR24R Basin 1 Poae 36899 BASE 12. 00 1. 29 1. 1E3 25YA24HR Basin 1 Pre Page 1 of l Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. IuawUou;' V leld uolSlAlpgnS LleulpaW L6LZ) umSiAip9nS 4eulpaW - Held uaw96eueW aalemw' IS : wr am Max Ma ing Max Delta Max Surf Max Dime Max ax T d Max Simula[ iov Ma Stage Sim, Sage Stage Stage A ea Inflow Inflow MOutf y' Name Group ft . tG hrs cfs hrs f[ ft 4495 O. it 4. 40 aal n 1- Pos . ASE BASE 25YftO1HR as. 2HR 39 f, 1. 68 11. fIA449 15. 00 ' 1B. 00 O. 0O5r O. 00SD 5993 D. 83 4. 45 42 ] 1 Bag in 1- Post 18. 00 OAB50 6f45 2. 50 ]. 25YR04HR ]. O1 il. 60 Haain 1- Poet BASE 4 - 00 9. 23 9 18. 00 - 0. 058 6899 25YROHNR 4. 22 1]. 66 Easin 1- Pos[ HASB 1. 99 1. 61 12 18. 00 - 0. 005D 5919 . 25YR24HR 12. 18 1]. 4l Basin 1- Soft BASE Page I of I Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. m leld uoisinipQnS 4euipaW MIZ) uolsln!p9nS 9eulPBW - ueld luawa6eueW JalemwiolS :luaw4Delly e a MN[ Max Time Max Max Tim¢ Ma:[ Max Mi[ Time Name Group Simulation Flow hot Flow Delta cf9 _- ___.__ _ GS Stage VS Stage SS Stage CS Sragc U N 0 00 15. 00 0. 000 1. 34 1]. OB BASE 25YRO1HR 0. 00 0 OC 1]. 94 O. OD 15. 00 0. 9] - 0. 029 1. fid Neia BASE 25YR02HR 1. 68 15. 00 3. 01 1]. 60 D. CO 3. 01 2. 09 - 0. 039 HASH 25YR09HR 15. 00 9. 22 11. 66 O. DD 25YROSHR 9. 22 2. 53 - 0. 031 N eii BASE 15. 00 12. 18 1]. 44 0. 00 25YR24HR 12. 15 0. 95 0. 013 Ae it BASE Page 1 of 1 Interconnected Channel and Pond Routing Model (ICPR) 02002 Streamline Technologies, Inc. ME! uO)siAipgns geuipayy : L6tZ) uo(siA( pgnS geu) papy - ue)d luawa6euepl ralemw: ols :luawgOelltl at rim am aaIEOa Avenue SOUTHERN EARTH SCIENCES, INC. Y mumv Panama Lily, FL32QI GeoWAniNEnvMenmenblBCana4velbn McUMIe T, atinp n. 3 Tel: ((85) 872 -99 Fax: ( 6W) 6] 2 -996] wmv.sceaM. mn Garver, LLC January 22, 2013 1234 Airport Road File No.: P13 -0014 Destin, Florida 32541 Attention: Mr. Scott Jenkins: Subject: Geotechnical Services for Stormwater Design at the Proposed Medinab Subdivision in Fort Walton Beach, Florida Dear Mr. Jenkins: As requested, Southern Earth Sciences, Inc., has completed the geotechnical services for stormwater design at the proposed Medinah Subdivision in Fort Walton Beach, Florida. This report presents the results of our field and laboratory testing and includes estimated permeability rates at the bottom of the proposed pond. On January 11, 2013, personnel with our firm traveled to the project site and completed the field testing for the above referenced project. As requested, one ( 1) hand auger boring was performed to a depth of approximately 10 feet below the existing ground surface. The test location was established in the field by using a 300 -foot tape and estimating right angles with reference to existing landmarks; therefore, our test location should be considered approximate. See the attached Figure for our approximate test location. Laboratory investigative work consisted of physical examination of samples obtained during the hand auger operation. Soil samples were visually classified in the laboratory in accordance with the Unified Soil Classification System. The log of our hand auger boring is attached. The elevation of our test location was interpolated from the topographic information that we were provided; therefore, the elevation of our test location should be considered approximate. The soils encountered throughout the depth of our hand auger boring was sands. The sands varied in color and texture, which ranged from clean to slightly silty sands. On the date of our field testing, the groundwater level was not encountered within the depth of our hand auger boring. However, fluctuations in the water table depths will occur due to seasonal precipitation/ evapotranspiration differences and tidal influences. LABORATORY TESTING FOR STORMWATER DESIGN: While the hand auger boring performed for this project are representative of subsurface soil conditions at their respective locations/depths and for their respective vertical reaches, local variations of the subsurface materials, and permeability rates are anticipated. Soil descriptions MOBILE • MOWGOMERY ISUMMERDAIE DEBMN PAIIA. C11, TALLAN., 99EE , BATON ROUGE • MPNDEYILLE • NEW nNLEANS

Download this text file with its original spacing ↓