READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 02-26-13--regular — reading text
Part 21 of 72. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31638-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
4eulpaW - Mid luewaaeueyr ialemwrolS 71Jaw4oelly O
m `
Medinah Subdivision am
Sturm Water Management Plan
Yawum
1. 1 GENERAL
The following is a storm water evaluation of the proposed development of a proposed six lot single
family subdivision at the subject property in Fort Walton Beach, Florida. The parcel consists of
approximately 1. 83 acres and is currently wooded and vacant, The property is located north of
Beal Parkway between Linstew Drive and Briarwood Circle. See attached location map for further
information.
This storm water evaluation will be performed using the SCS Method. In accordance with City of
Fort Walton Beach requirements the 1 - inch volume associated with the runoff from the developed
areas will be retained on site and the retention system must be designed to recover within
72 hours. The post -developed runoff associated with a 25 -year 1 hour, 2 hour, 4 hour, 8 hour and
24 hour storm event will also be retained on site in accordance with jurisdictional requirements.
1. 2 PRE -DEVELOPED CONDITIONS
For the purpose of the pre -development storm water evaluation, the parcel will be analyzed as one
distinct drainage basin, which is approximately 1. 83 acres. No off -site run -off appears to impact
the proposed site. Run -off from adjacent areas will route around the site or bypass through the
site.
The site is generally sloped from south to north, with elevations ranging from 25 to 19 feet. The
storm water runoff generally flows to the northern portion of the site.
Table 1. 2. 1 summarizes the area information of the pre -developed conditions for the design storm
events.
Table 1. 2. 1: PRE -DEVELOPMENT CONDITIONS- FORT WALTON BEACH, FL
25Yr - 2 Hr _ 25Yr - 4 Hr 25Yr - 8 Hr 25Yr - 24 Hr
Storm Duration 25 Yr - 1 Hr
1. 83 Acres 1. 83 Acres 1. 83 Acres 1. 83 Acres_
Basin Area 1. 83 Acres
10 minutes 10 minutes 10 Minutes 10 Minutes_
Time of Conic. 10 minutes
60 60 60 60 60
Curve Number
field uolslAlpgnS geulpaW : L61,Z) uolslAlpgnS geulpatq - ueld luawa6eueyy JaleMwuols auawgoellV e
Medinah Subdivision am
Storm Water Management Plan
Y
a
2.36 cis 3. 09 cis 1. 24 cis
Flow Rate, Q 223 cis 2.36 cis
1. 3 POST- DEVELOPED CONDITIONS
As with the pre -developed conditions shown above, the 1. 83 acre area will be analyzed as one
distinct drainage basin. Table 1. 3. 1 summarizes the area information of the post -developed
conditions.
Table 1. 3. 1: CONDITIONS - FORT WALTON BEACH, FL
25Yr - 24Hr
Storm Duration 25Yr - 1 Hr 25Yr - 2 Hr 25Yr 4 Fir 25Yr - 8 Hr.
1. 83. Acres
Basin Area 1, 83 Acres 1. 83 Acres 1. 83 Acres 1.83 Acres
10 minutes 10 minutes 10 minutes 10 Minutes 10 Minutes
Time-of-Conc.
73 73 73 73 73
Curve Number
4. 45 cis 4,55 cis 3. 43 cis 4.33 cis 1. 61 cis
Flow Rate, Q
1. 4 STORM RETENTION CALCULATIONS
The post -developed runoff for the site will be retained in an above ground retention system within
the site boundaries. Seasonal high groundwater levels were obtained from the Geotechnical
Report provided by Southern Earth Sciences, Inc. ( see attached). The estimated depth to the
water table is estimated to be greater than 10.0 feet since no indication of seasonal high ground
water was noted in the 10 foot deep boring, the maximum level of groundwater is estimated to be
below an elevation of 8. 0. The lowest proposed pond bottom is located at a proposed elevation of
15. 0; therefore there is a minimum of two feet of separation between the proposed pond bottoms
and the ground water level .
A permeability rate of 7. 6 inches /hour was determined by permeability testing of the site material.
A factor of safety of 2. 0 was applied to this rate and a design permeability of 15. 2 inches /hour was
utilized in the evaluation of the retention system.
leld uolslAlpgns geu! POW : L61,Z) uolslAlpgns yeulpaW - ueld luawa6euew lalemwuols auewgoelly
D
d'
Madinah Subdivision a
a
Storm Water Management Plan Y
a
The dimensions of the dry retention area are as follows.
RETENTION POND
onc ni n
The attached ICPR model shows the peak flow rates and the routing of the 25 -year 1 hour, 2 hour,
4 hour, 8 hour and 24 hour storm events through the proposed retention area. The following peak
stages and outflows were found for each event .
a
17.08 0. 00 2. 23
25 YR - 1 HR
25 YR - 2 HR 17. 55 0. 97 2. 36
25 YR - 4 HR 17, 60 2.04 2. 36
17. 66 2. 53 3. 09
25 YR - 8 HR
17. 44 0. 95 1. 24
25 YR - 24 HR
A maximum elevation of 17. 66 was calculated for the 25 year - critical storm event. An overflow
weir ( elevation 17. 2) is located at the northern boundary of the retention area and is calculated to
discharge 2. 53 cfs at the maximum stage of 17. 66. This rate is less than the pre -development
discharge rate of 3.09 cfs therefore attenuation requirements are met.
1. 5 1" RETENTION REQUIREMENT
In addition to meeting the attenuation requirements above, the retention area must also be sized to
retain the first 1 inch of runoff from the developed area. The first 1" of runoff associated with the
developed site is 6,643 cubic feet. The retention area is designed to retain 11, 766 cubic feet. The
1" retention requirement is met at an elevation of approximately 17. 2; therefore the retention area is
adequately sized to retain the first 1" of runoff.
1. 6 72 HOUR RECOVERY REQUIREMENT
7eld uolslnlpgnS geulpapy : LW) uolslnlpgnS geulpayy - ueld luawa6euM Jatemu' JOIS : luawgoetty
aa Medinah Subdmsron
Storm Water Management Plan
a
a
aUm
Recovery is achieved through exfiltration /percolation. The proposed retention pond will recover in
approximately 5. 9 hours for the 25 year —critical storm event. This timeframe exceeds City of Fort
Walton Beach requirements.
Gai- : r i
Lj
tq
666: t i• `arc , ; - , , ` e -. ?.
I -!'
s
r
e _
CE
Li
y ' ifs i"
NI
e T
i
leld uolslAlp4nS 4euipaiN : L61Z) uas1A! pQnS 4euipayN - ueld 1uaw36euepy lalemooJOIS : luaw43e11V a
m
L
a
Y
A stage /Area
NOdes
V Stage / Volume
aVN
T Mime / Stage
M anhole
T Basin 1 Pie A B sin 1- Poat
O8ae¢
Wetland
ns Flow
p Bes Vn¢ t CN U: Ba sin 1- Pie V: Basin . 1 - Post
S S c. CN
Y SCS 1m1
Z sBllH GA
E: P¢ tc 1
W W¢Pip¢
ii W :' Je ii
G Chann¢ I
O Btop st nctoie
Bx rag¢
R Rating Ccrve
H Breach
Pexclatlon T: BOOndaiy 1 '..
F Filter
X Extil Trench
Interconnected Channel and Pond Routing Model (ICPR) 02002 Streanline Technologies, Inc.
7eld uolalA! P9nS 4eulPaW c L6LZ) UOISIAIpgnS 4eu' PaW - Ueld ivawa6euuW lalefAtuloIS Iuaw9aegy cr
r rn
