August 1, 2016

Okaloosa County BOCC — August 1, 2016 — Water and Sewer Presentation

Water and Sewer Presentation in the August 1, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the August 1, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1345). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used ; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Water and Sewer Presentation
Date
August 1, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
6
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Water and Sewer Presentation — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 2.8 KB · 6

Download ↓

Water and Sewer Presentation — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 991.9 KB · 6

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Water and Sewer Presentation — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

-37,000+ water service connections -34,000+ sewer service connections -33,000+ water meters read each month -31,000+ customer accounts/bills sent each month -< 1.0% bad debt written off -2,500,000,000+ gallons of potable water produced per year from 21 wells and 19 tanks -746+ miles of water mains, valves, and 3,980 hydrants -2,600,000,000+ gallons wastewater treated per year at 3 water reclamation facilities -150 sewer pump stations -534+ miles of sewer mains, valves, and 7,696 manholes  Shoal River Area Land Acquisition – purchased 641 acres of land to be utilized for future off-line reservoir and surface water treatment plant.  Camp Rudder Force Main & Lift Station – provided sewer service to Camp Rudder via 1 master lift station and approximately 8.6 miles of piping.  Garniers Area Sanitary Sewer Rehab – installed cured-in-place liners on vitrified clay sewer mains and brick manholes to reduce the inflow and infiltration.  Newcastle Area Water System Improvements – installed new mains, meters, and hydrants serving 271 homes  Poquito Bayou Water Main & Force Main Bores – replaced the aging, deteriorated mains under Poquito Bayou with new directional bores.  Implemented inventory custody and controls as well as segregation of duties, based on independent auditors recommendations.  Replaced approximately 150 aging water meters in hard-to-read locations in the Shalimar area with new, modern meters with transmitters. Replaced 29 large/commercial meters. 145 140 135 130 125 120 115 110 105 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 budget includes 2 additional full time positions and 1 shared position: -Utilities Technician I -WWTP Operator or Apprentice -Contracts & Lease Coordinator (expense shared 45/45/10 with Airport and Purchasing) Construction underway in FY2016. Substantial completion should occur in FY2017.  Increases storage, reliability, and redundancy to service area that contains Bob Sikes Industrial Park.  Land acquisition is complete.  Design, permitting, and bid process completed in FY2016.  Construction scheduled to begin this year (FY2017).  Divert East County Flow to Arbennie Pritchett WRF - $3.5M  Brooks Bridge Water Main Bore - $1.2M ($600K from FDEP grant)  Residential Water Meter Replacement - $4.3M  Second year of $13.9M project through FY2019  Septage/Fats, Oils, Grease (FOG) receiving station at Arbennie Pritchett WRF - $1.1 M  Newport/Essex Area Water System Improvements - $300K  Highway 90 West Water Main Replacement - $600K  PJ Adams/Antioch Water Main Relocation - $270K  Begin design on:  Operations Building (FWB) - $1.5M  Reclaimed Water to Niceville & Eglin AFB - $3M FDEP grant

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — August 1, 2016 — Water and Sewer Presentation.” August 1, 2016. Water and Sewer Presentation. Crypt of Echoes evidence ID LED-2026-32746e9276c346bf918925e37333819c. http://127.0.0.1:58097/evidence/LED-2026-32746e9276c346bf918925e37333819c. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Water and Sewer Presentation, meeting materials for August 1, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=12033&MeetingID=1345

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓