Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
such
changes in the work shall be authorized by a written addendum to this Contract, and shall
be executed by the City Manager. No claim for additional or extra work will be
considered valid by the City unless first submitted in writing and authorized by a written
addendum to this contract.
Section XII. Occupational License
If Consultant is located outside the City limits of Fort Walton Beach, there is a
contractor registration fee of $35. 00 and a current license or registration from another
business location must be shown.
Pollutant Separator Units Request For Proposal 07 -126
CONTRACT NUMBER FWB07 -126
Section XIII. Florida Law Applies & Venue
The parties acknowledge and agree that this contract shall be construed pursuant
to the laws of the State of Florida and that the venue for any action related to this contract_
lies within Okaloosa County, Florida.
Executed on the I/ YJ day of , 2007.
CITY OF FORT WALTON BEACH, FLORIDA
By:
ce Vhanahan, City Manager
Date: 10• l0'
Attest: IZ4, ' i-
Helen Spencer, Cfty Clerk
4
3r
Pollutant Separator Units Request For Proposal 07 -126
CONTRACT NUMBER FWB07 -126
CONSULTANT
GOODWYN, MILLS, AND CAWOOD, INC.
BY:
Its: Q14A t itES1DC1 1.T
Goodwyn, Mills, and Cawood, Inc.
359 North Main Street
Crestview, FL 32536
Phone ( 850) 683 -0711
Fax ( 850) 683 -8711
State of F 1 o c ,, e&
*,,
County of 04--'e..\ oos0.
Sworn and affirmed before me, the undersigned authority, on ore,, g%eEt \ v— ,
2007, by F-c "\ V e-, e r , as the \ 4; c res of
Goodwyn, Mills, and Cawood, Inc., and who is 6Enall known to me or who has
produced identification of-
VERA MICHELLE MANNING
1P I
MY COMMISSION * DD585118
EXPIRES: Aug. 15, 2010 r a `' Lex, & L L
Florida Notary Senrice.com
sod 398 0153
-
Notary Public
5
May 16, 2008
Mr. Mike Tatum, Purchasing Director
City of Fort Walton Beach
PO Box 4009
Fort Walton Beach, FL 32549
RE: Fee Proposal for Engineering/ Consulting Services for Stormwater Pollutant
Separator Units for the City of Fort Walton Beach
Contract Number FWB 07 -126
Amendment 1— Addition of Eglin Parkway Separator and Drainage Basin Survey
Dear Mr. Tatum:
Goodwyn, Mills and Cawood, Inc ( GMC) is very pleased to be working with the City on the
referenced project. Outlined below is our proposed scope of work and associated fees for adding the
additional separator at Eglin Parkway and performing a survey of the drainage structures in the
drainage basin contributing to the storm water flow at this location:
1. Drainage Basin Structure Survey 5, 500. 00
Survey Approximately 120 Structures.
Provide Horizontal Location referenced to
the Florida State Plane Coordinate System.
Provide Vertical Location referenced to
the NGVD 29 Datum.
Identify Drainage Pipe Size and Material.
2. Engineering Design 8, 500.00
Topographic Site Survey 10%
Preliminary Design 40%
Final Design 40%
Bidding 10%
3. Construction Engineering/ Inspection 1, 000.00
4. Permitting (Excluding Agency Fees) 1, 500.00
The proposed budget includes all direct costs. The detailed scope of services that is a part of the
referenced contract will remain in affect for the original project as well as for the work tasks added
by this letter.
If you have any questions, or require any additional information please call me at your convenience.
Sincerely,
GOODWYN, MILLS AND CAWOOD, INC
Chuck Faulkner, PE
Archive Mail Information Page 1 of 4
From: Chuck Faulkner Sent: Fri 05/ 23/ 2008 05: 18 PM
chuck.faulkner@g mcnetwork.com>
To: Sam Wilson < swilson@fwb. org>
CC: Chuck Faulkner
chuck.faulkner@gmcnetwork.com>
Subject: RE: Eglin Pkwy Stormwater Separator
Attachments:
Sam, I propose the following alternate explanations:
First, it is important to understand that the scope of work in the original rfp, proposal and contracts did not call for or include
a survey of all of the structures in the drainage basin. All that was requested and provided was a survey of the installation
site. If the $ 5, 500 basin survey is excluded from the total amount of the proposed addendum, which it should be, the
comparison is not even close.
The original amount resulted in monitoring, design, topographic survey of the installation
site, and permitting fees of $12, 225 per site or a total of 16% of estimated construction costs ($ 306, 000). The proposed
addendum to the contract considering the same cost items results in $ 11, 000 per unit or 7. 3% of the estimated construction
cost ($ 150, 000).
We were able to lowerthe actual design fee because we are. still in the process of designing the other
four. This fact allows for some economies of scale and scope. The addition of the drainage basin survey is an important
feature which will be helpful in final design as well as having a long term use to the city. This price was calculated in the
following manner:
PSM: 4 Hours @ $ 120 /hr = $ 480
Survey Crew: 40 Hours @ $ 100 /hr = $ 4, 000
Designer: 10 Hours @ $ 80 /hr = $ 800
Then we rounded down to $ 5200. There is nothing to compare this to in the original proposal.
Second, if we ignore the fact that the scopes of work are different, we can look at fee based on a % of construction cost.
For the original contract, the design, flow monitor data analaysis, construction inspection and permitting all add up to 16%
of the estimated construction costs. For the proposed addendum, the design, flow monitor data analysis, construction
inspection, permitting AND basin survey add up to 11% of the estimated construction cost.
A third way to look at it would be as follows:
Original Proposal Proposed Addendum
Per
Total Unit
Storm Flow
Data El 20 Hours @ $ 90 / hr 1, 800 N/ A
PE 5 Hours @ $ 135 / hr 675
2,475 619
Design El 240 Hours @ $ 90 / hr 21, 600 El 60 Hours @ $90 / hr 5,400
PE 64 Hours @ $ 135 /
hr 8, 640 PE 16 Hours @ $ 135 / hr 2, 160
Survey 32 Hours @
120 /hr 3, 840 Survey 8 Hours @ 1201hr 960
34,080 8, 520 8,520
CE& I El 32 Hours @ $ 90 / hr 2, 880 El 32 Hours @ $90 / hr 720
PE 8 Hours @ $ 135 / hr 1, 080 PE 8 Hours @ $ 135 / hr 270
3, 960 990 990
Permitting El 60 Hours @ $ 90 / hr 5, 400 El 60 Hours @ $90 / hr 1, 080
PE 23 Hours @ $ 135 /
hr 3, 105 PE 23 Hours @ $ 135 / hr 405
8,505 2, 126 1, 485
Basin Survey N/ A PSM 4 Hours @ $ 120 /hr 480
Survey Crew 40 Hours @
100/ hr 4, 000
http://http:// archivearchive
. . fwb.fwb. org:org: 8080lumblshowmail8080lumblshowmail jspjsp
? ? serverid=serverid= ll && useiid=useiid= 935189935189
& & muid=muid= la9625c...
la9625c... 6/6/ 5/5/ 20082008
Archive Mail Information Page 2 of 4
Designer 10 Hours @ $ 80 /hr 800