the new grant was similar to
the current grant, with the exception of the quantity of separator units for the project. Amending the
current contract will result in a cost savings to the City as five separator units will now be bid at one
time instead of four. Furthermore, the current firm already prepared the necessary documents for
the design parameters for four storrawater separators, and a cost savings will be realized by not
having to change design parameters for a new firm.
Staff met with GMC and discussed the Eglin Parkway project and requested a formal quote
attached) to amend and add a fifth stormwater pollutant separator site to their current contract. On
2008, Staff received a quote of $16, 500 and asked the firm to document unit costs for
16th,
May
comparison to the current contract ( email correspondence attached). After reviewing the detailed
explanation from GMC, staff concluded that the added cost of the project was a result of the
additional survey work required for the complex route of the project as follows:
5, 280.00
1. Drainage Basin Structure Survey $
Survey Approximately 120 Structures.
Provide Horizontal Location referenced to
the Florida State Plane Coordinate System.
Provide Vertical Location referenced to
the NGVD 29 Datum.
Identify Drainage Pipe Size and Material.
2. 8, 520.00
Engineering Design $
Topographic Site Survey 10%
40%
Preliminary Design
Final Design 40%
10%
Bidding
2
3.
Construction Engineering/ Inspection 990.00
4.
Permitting (Excluding Agency Fees) 1: 1485. 00
Total= $ 16, 275. 00
Recommendation:
Staff requests Council authorization to amend contract number FWB07 -126 in the amount of
163,275 to Goodwyn, Mills, and Cawood, Inc. of Crestview, Florida for engineering services related
to design installation of Stormwater Pollutant Separator Units. The requested amendment will be for
the engineering, designing and permitting of (1) one stormwater pollutant separator in accordance
with the funding agreement from the Northwest Florida Water Management District signed April
8th, 2008. If approved,
sufficient funding is available in 401 -5403 -537.6300 ( Water Quality
Initiative).
Prepared and Submitted BX:
o
Sam Wilson, Environmental ecialist Date
Date
Reviewed and Concur:
r/61v
Mike Ta casing Director Date
Reviewed and Concur:
r
V•
Brandy Wunker, Finance Director Date
Reviewed and Concur:
a/ vj
Jo c S ahan, City Manager Date
Attachments:
1. GMC Contract FWB07 -126
2.
GMC Proposed Amendment dated May 16, 2008
3. Email string dated May 23, 2008
Pollutant Separator Units Request For Proposal 07 -126
CONTRACT NUMBER FWB07 -126
CONTRACT FOR
ENGINEERING / CONSULTING SERVICES FOR STORMWATER
POLLUTANT SEPARATOR UNITS
FORT WALTON BEACH, FLORIDA
This agreement is made between the City of Fort Walton Beach, a Florida
municipality with its principal place of business at 107 Miracle Strip Pkwy, Fort Walton
Beach, Florida, ( "City ") and Goodwyn, Mills, and Cawood, Inc., ( "Consultant ") of 359
North Main Street, Crestview, FL 32536.
The City desires to have the following services to be performed by Consultant:
All those services outlined and set forth in the Request for Proposal, RFP 07 -126, dated
June 12, 2007, and the Consultant's Proposal dated July 17, 2007, along with any
amendments to those documents and Exhibit " C" Scope of Work dated September 26,
2007. Each document stated and any amendment is incorporated in and specifically made
a part of this Contract by reference. Consultant agrees to perform the services for City
under the terms and conditions set forth in this agreement. Therefore, in consideration of
the ' mutual promises in this contract and any referenced document, it is agreed by and
between City and Consultant. .
Section I. Nature of Employment
Consultant will perform monitoring, -engineering design, construction engineering
and inspections, and permitting services for the stormwater pollutant separator units in
the City as specified in the Request for Proposal, dated June 12, 2007, Consultant's
Proposal dated July 17, 2007 and Exhibit " C" Scope of Work dated September 26, 2007.
Section II. Place of Work
Consultant's on -site services will be rendered largely in the City limits of Fort
Walton Beach, Okaloosa County, Florida, and at other places designated by the City.
Section III. Time Devoted to Work
In the performance of the services, the hours Consultant is to work on any given
day will be entirely within Consultant's control and City will rely upon Consultant to put
in such number of hours as is reasonably necessary to fulfill the intent and purpose, of this
contract.
The work of this Contract shall commence at the earlier of ten ( 10) days from the
date of execution of this Contract or at the date specified in the Request for Proposal,
dated June 125 2007, and the Consultant's Proposal dated July 17, 2007, along with any
amendments to those documents. The work shall be completed within two- hundred-
seventy (270) days of the date of commencement.
Pollutant Separator Units Request For Proposal 07 -126
CONTRACT NUMBER FWB07 -126
Section IV. Payment
Services described under Exhibit " C" Scope of Work will be conducted for a not -
to- exceed fee of $48, 900. 00 as follows:
Payment Schedule:
Task 1. 0 Storm Flow Monitoring 2,500. 00
City of Fort Waltol i provides equipment)
Task 2. 0 Engineering Design 33, 900. 00
Surveying . 10%
Preliminary Design 40%
Final Design 40%
Bidding 10%
Toalr Z n (' intinn L11S111VV111lU
1~ nrrinovrinn/ ilLJ\JVVt1V11
T„ er or++inn $
14JL \. J. V
nnc+.
VVILJti lLVt1V11 , 4 0nn nn
vV. VV
Task 4. 0 Permitting (Excluding Agency Fees) $ 8, 500. 00
3 sites NWFWMD ERP
Y site NWFWMD/ USCOAE Dredge & Fill
1 FDOT Permit
The City shall make progress payments periodically, as the work proceeds, as approved
by the City Manager or designee. Invoices shall be paid within thirty (3 0) days of receipt
by the City. All invoices shall be directed to the Purchasing Director, City of Fort Walton
Beach, PO Box 4009, Fort Walton Beach, Florida, 32549.
NOTE: ALL INVOICES MIDST CLEARLY INDICATE THE CITY
CONTRACT NUMBER AS STATED HEREIN.
Section V. Status of Consultant
This agreement calls for the performance of the services of the Consultant as an
independent contractor and Consultant will not be considered an employee of the City for
any purpose.
Section VI. Time of Essence
The parties understand and agree that time is of the essence in the performance of
this Contract.
2
Pollutant Separator Units Request For Proposal 07 -126
CONTRACT NUMBER FWB07 -126
Section VII. Services for Others
Inasmuch as Consultant will acquire or have access to information which is
confidential,
Consultant will not perform any services for any other person or firm
contrary to or in conflict with the City's best interests without prior notification to- the
City and the City's consent to such work during the time of this contract.
Section VIII. Termination of Contract for Convenience
The City may terminate this contract at its convenience with 30 days advance
written notice to the Consultant. In-the event of such a termination by the City, the City
shall be liable for the payment of all Work properly performed prior to the effective date
of termination and for all services which cannot be cancelled and were completed prior to
the effective date of termination and other reasonable costs associated with the
termination.
Section IX. Indemnification
Consultant agrees, to the fullest extent permitted by law, to indemnify and hold
harmless the City from any amounts ( including reasonable attorney' s fees) for which the
City shall become legally obligated to pay as damages for negligent acts, errors, and /or
omissions of the Consultant arising out of the Consultant' s performance under this
Agreement; however,,the amount Consultant will pay for damages is limited to the limits
set forth in Consultant' s liability insurance.
Section X. Insurance
Consultant shall provide evidence of insurance coverage which is equal to or
exceeds the minimum standards for a project of this nature, and as specified by the Risk
Manager of the City.
Section XI. Additional or Extra Work
The City may order changes in writing to the scope of this contract consisting of
additions, deletions, extra work, or other revisions. Upon order of those changes, the
Contract price and time shall be adjusted accordingly as the parties agree. All