READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2010-11 -Comp Mgt Plan Adoption — reading text
Part 4 of 49. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-22779-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
eD;1ergency
organization.
3. Incident COJmmand System. This plan formalizes the Incident Command
organization and structure.
4. City Emergency Planning Team. A City Emergency Planning Team is
hereby established through promulgation of this plan. The team shall be
compo.sed of representatives or alternates. from selected city departments,
plus other agencies as may be necessary. The team shall formulate
emergency management policy recommendations to the Mayor. This
includes development and maintenance of this plan, exercise planning and
evaluation, and related initiatives. Each agency appointed to this te~ Will:
primary representative and alternates; document these
designate a
appointments to include telephone numbers; and provide a copy to the
Deputy Director of Emergency Management. The Deputy Director of
Emergency Management will chair the team and will schedule periodic
meetings as needed.
D. CONTINUITY OF GOVERNMENT.
1. Mayoral Succession. The line of succession to the Mayor is prescribed by
Fort Walton Beach Charter.
2. Preservation. of Records. All city departments will develop policies,
guidelines, and instructions ( PGI) to guarantee the preservation of vital
public records, to include their reconstitution if necessary, during and after
emergencies. In general, vital public records include those: considered
absolutely essential to the continued operation of city. government;
considered absolutely essential to the city' s ability to fulfill its
responsibilities to the public; required to protect the lights of individuals
and the city; and, essential to restoration of life support services.
65-
Documentation of actions taken during an elnergency or disaster is a legal
requiren1ent.
E., LEVELS OF DISASTER.
1. Localized Disaster. The principal of graduated response. will be used in
The ( initial response. will . be from
responding to localized disasters.
emergency. personnel..dispatched-by fiormal' procedures.. Their..assessment
of the situation will determine if additional resources are needed~ . City
1\tlutual
departments. may be called upon to provide additional resources.
aid and the Okaloosa County EOC may provide additional supports if
resource needs are beyond existing. Fort Walton Beach capability.
Activation of the EOC may not be necessary during a "localized" disaster.
2. Widespread Disaster. Hurricanes are considered the most probable
widespread disaster whi€h could impact the entire city and adjacent areas.
It is anticipated that a full activation of the EOC will be required to
coordinate the city' s. response.
3; Graduated Response. Most disasters will require a graduated response
involving only those persons necessary to handle the situation. For this
purpose, three levels of response will be used:
a. Level One Emergency. A "level oneil emergency is a common emergency
situation that occurs on a frequent basis. The responsibility for control
of the incident rests with the responding depwment.
b. Level. Two Emergency. Should an incident remain unresolved, the
status will rise to a " level two" emergency. Level two
emergency
incidents involve routine assistance from internal andlor. external
agencies including mutual aid. Command. and control is still the
responsibility of the prtmary response department. A partial activation
of the City EOC may occur, or the Director of Emergency Management
may go to the Incident Command Post to facilitate response
coordination. The Okaloosa County EOC is usually notified.
c. Level Three Emergency. Should the incident begin or escalate to a
situation where. non- routine assistance is required, or anticipated; a
level three" emergency will be dec1pred. The City EOC will activate at
this level. This level of emergency" will be used for all hurricanes, for
some tropical storms, and for any major technological disasters. The
Okaloosa County EOC. is notified, communication and coordination is
maintained.
F. EMERGENCY SUPPORr
" FUNC'TIONS' ( ESF' s).
1. ESF' s represent groupings of types, of assistance activities that citizens are
likely to need in times of emergency orrlisaster. County and" State
Comprehensive Emergency Management Plans, and the Federal Resp011se
66-
Plan, are. ted. ell-
organizeqby
rel?- l,Grgency ftjilctions, cOI .I.;rnonlY, lmo-
wp as
Emergency Suppo.rt Functions." During emergencies, municipal, county
and state EOC' s determine which ESF' s are activated to meet the disaster
response needs. See Annex III, Response Functions, for further details.
2. y, state, and federal
The count. governments will respond to Fort. Walton
Beach requests for assistance through the ESF structure. . Within the
count.y ap.d state EOC' s, requests for assistance will be tasked to the
particular ESF' s for cQmpletion. A lead agency for each ESF is indicated,
and will be. responsible for coordinating the delivery of that ESF to the
emergency area. The lead agency will be responsible for identifying the
resources vlithin the ESF that will accomplish the mission, and will
coordinate the resource delivery.
G. DIRECTION AND CONTROL.
1. General.
a. The emergency management organization of Fort. Walton Beach is the
responsibility of the City Manager, Director of Emergency Management.
All Fort Walton Beach departments, and applicable volunteer and
private resources, are part of the city emergency management
organization outlined in this plan. This Plan will be utilized to guide
as
response to emergencies / disasters or the imminent threat thereof,
and to guide Crisis Action Team (CAT) support to field operations.
b. The Mayor may declare a " State of Local Emergency". under Florida
Statutes Chapter 252. 38 ( 3) or a " State of Emergency" under Florida
Statutes Chapter 870. 043 to expedite access to local resources needed
to cope with the incident. If the needed response exceeds these local
capabilities, a disaster has occurred.
c. The Mayor may, by emergency proclamation, use city resources and
and alter functions of departments and
employees as necessary,
personnel, as necessmy.
d. If the situation is beyond local capability, a request for county, state,
and/ or federal assistance may be in the original proclamation or
included:in a second proclamation presented to the Governor through
the Florida Division of Emergency Management.
e. The Okaloosa County EOC serves as the liaison and coordinating
agency between the city and state government.
f. If county, state and/ or federal resources are made available to Fort
Walton Beach, they will be under the operational control of the Mayor
or desiignee. -
2. Crisis Mon:itoring, Crisis Action Team ( CA'l1.
67-
a. The Office' of Emergency Management ( Deputy Director. of Emergency
Martagement). is the Fort Walton Beach 24 hour " crisis monitor." The
Deputy Director of Emergency Management provides an on- going
independent analysis of. incoming information. As emergency
situations threaten or occur, the Deputy Director of , Emergency
to facilitate the
CAT)"
Management may convene a " Crisis Action Team (
process of. evaluation and incident planning, ahd possible activation
and. implementation of emergency fUhctions ab.d..resources. The CAT
will also be used to support "Incident Commanders" infield situations.
b. The Crisis Action Team ( CAT) is a' flexible, supporting / coolYdinating
service that could be: One person at home facilitating the coordination
of personnel artd resources to. an incident scene;'... Several people
convening in the .Emergency Operations Center ( EOC) or on- scene to
assist the "Incident Commander" as needed.
c. Core members of the Crisis Action Team ( CAT) include: City Manager,
Deputy Director of Emergency Management, Police Department,
UtilitiesDepartment, Engineering. ..Department, Financial Services
Department, and the Administrative Services Department. However,
to provide a
any Fort Walton Beach department could be called upon
who is called
representative to the Crisis. Action Team ( CAT). Exactly
and ultimately how many people will serve on the Crisis Action Team
CAT) is dependent upon the situation and the functions that will be
activated.
d. Instantaneous~..events may trigger immediate full EOC activation
through first. responder departments, such as the. fire or police
departments.
3. "- On- Scene" Management Incident Command System (rCS).
a. On- scene response to emergencies follows the concept of the Incident
Command System (ICS).
b. Theperson in charge at' the incident is the on- scene Incident
Commander who is responsible for ensuring each agency on scene can
carry out its responsibilities.
c. Upon arriving at an"incident scene, the Incident Commander should:
Assess the situation and identify hazards.
Develop objectives ( tasks to be done).
Ensure appropriate safety and.personnel protective measures.
Develop: an:actlon plan and priorities.
Incoordination with the EOC; contact appropriate agencies or
personnel with expertise and capability to carry- out the incident
