READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2010-11 -Comp Mgt Plan Adoption — reading text
Part 14 of 49. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-22779-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Ability to effectively manage the system during the response and
recovery phases. .
Philosophically, there are three things we can do to mitigate. We carl:
1. Act on, the hazard (the cause of the emergency).
2. Act on the people (the population effected by the emergency).
3. Act on the interaction between the hazard and the people.
Mitigation activities may be undertaken before a hazard event or
afterwards. Pre- event mitigation activities are highly desirable, since the
p~riod immediately following a hazard event is often a difficult one in which
to make mitigation decisions.' When put in place soon enough, these
activities can sometimes reduce the damage caused by the next event. Also
worth noting is mitigation can break the cycle of repeated destruction
resulting from hazard events. Mitigation typically is a difficult, long- term
task, but
. is well worth the effort.
B. POLICY.
1. It is the policy of Fort Walton Beach to support mitigation activities to
eliminate or reduce disaster damages and to coordinate recovery efforts
with long term development and hazard mitigation plans of the. City. This
is done a number of ways, including, but not limited to. the land use
planning process and the enforcement of existing codes, enhanc~ment of
codes, and :ffiitigation requirements in the. pennit process. ; Since' rb.itigation
efforts will n.ot eliminate all. disasters, the CitY shall endeavor to be as
prepared as possible for a disaster.'
2. Fort Walton Beach Departments / Agencies are encouraged to support
mitigation efforts that fall within their respective inissions. The City has a
103-
system of Boards and Committees that have the ability to effectively
address tnany mitigation issues.
3. It is the policy of Fort Walton Beach that city agencies will enforce all public
safety mandates of the Fort Walton Beach City Code to include land use
management and building codes, and recommend to the Mayor legislation
required to improve the elnergency readiness of the community.
c. FORT WALTON BEACH MmOATION PROGRAMS, RESPONSIBILITIES.
1. Under normal conditions, when an emergency or disaster is not occurring
and there is no threat to life and property, every reasonable effort is made
to ensure that when a disaster does strike, adverse impacts will be
rnininlized. To do so, numerous ongoing activities are carried out by local,
state and federal
governments. Such activities include land use
education;
management; planning; emergency preparedness; training and
and flood, hurricane, or other hazard damage reduction. .
monies.
Mitigation is largely unfunded; it is subject to appropriated
2. The City of Fort Walton Beach supports mitigation activities to eliminate or
reduce damages resulting from disaster. This is done primarily through
land use planning and the enforcement of existing codes.
to
Mitigation plans include community goals and objectives with regard
life- style, amenities, aesthetics, physical environment, and economics.
4. Other general Fort Walton Beach mitigation activities include:
The Public Utilities Group ( Utilities and Engineering Services) is
the lead agency for the design and maintenance of mitigation
structures for surface water drainage, code enforcement, and structural
evaluations.
The Fire Department coordinates fire prevention programs and related
mitigation activities, enforces Fort Walton Beach codes which relate
to
life and hazardous materials, and mitigates fire hazards through
safety
fire prevention programs.
5. Building Codes, Land Use Planning.
The Fort Walton Beach Development Services Division coordinates
hazard mitigation activities as they relate to land use and planning,
and natural resource management, and coordinates mitigation
activities with long range economic development plans.
Fort Walton Beach has adopted a building code as required by Flortda
Statutes. Details are found with the " 2007 Standard Building Code
1 04-
and the :P' ort Walton Beach Amendlnents." A copy is on line on the City
of Fort A\Talton Beach website.
6. Coastal Management Hazard Mitigation Plan
Fort Walton Beach follows state. guidelines in its coastal
primarily
uation plan
managelnen~ effQrts, and has. adopted the. hurricalle~ V;;t(:
prepared by theOkaloosa County Emergency Management Division.
F6rtWaltohBeach will continue to work with Okaloosa County to
assure that the county wide hazard mitigation plan remaj.ns current.
In accordance with Chapter 9J -5. 012, Florida, Administrative Code,
Fort Walton Beach coastal area has defined and estaplished boundaries
for three areas of concem: the general case coastal arefl boundary; the
special purpose hurricane evacuation and hazard mitigation area
boundary; and the estuarine water quality boundary. Fort Walton
Beach has established certain mitigation goals, objectiv~s, and policies
to reduce the threat or minimize disaster impacts in these areas.
Fort Walton Beach has which must be evacuated during all
areas
categories of storms; category 1 through 5 storms does require certain
areas tOl be evacuated. The City abides by the Okaloosa County CEMP
and its :Hurricane Evacuation Plan component.
Fort \\ Talton Beach mechanisms regarding
coordination coastal
informal and at the staff level. These
management primarily
are
coordination mechanisms appear to be generally effective.
7. National Flood Insurance Program ( NFIP).
As an participant in the NFIP, Fort Walton .Beach will hold a
active
Class 7" qualificati,on in the Community Rating System ( CRS).
Flood insurance rate maps which show areas that flood and data
obtained in the Community Rating System process. are used for
response, and recovery activities.
mitigatton, preparedness,
As per Fort Walton Beach Code, Chapter 17. 600, Flood Damage Protection, it
shall be the to
purpOSI~:" the public health, safety and general welfare and to
promote
minimize public and private losses due to flood conditions in specific areas by provisions
designed to:
1. RestriCt or prohibit uses which are dangerous to health, safety and property due to
water or erosion hazards, or which result in damaging increases in erosion or in flood
heights or velocities;
2. Require that uses vulnerable to floods, including facilities which serve such uses, be
protected against flooddamage at the time of initial construction;
3. COlltrol the altl~ration of natural floodplains, streain channels and natural protective
batrierswhich arl~ involvediri the accommodatIon of floodwaters;
105-
4. Control filling, grading, dredging and other development which n1ay increase erosion
or flood damage; and..
5: Preventoriegul"ate-the construction offload baniers which-will-unnaturally divert
floodwaters or which may increase flood hazards to other lands."
Using the NFIP standard, Fort Walton Beach Building Code ensures
quality building construction able to withstand winds as high as 100
miles per hour within the highly developed coastal areas.
8. disaster Mitigation Strategies~ ..
Pre.,.
Fort Walton Beach will work with Okaloosa County and DCAjDEM to
identify potential mitigation projects that will reduce future damage
and expenditure of disaster recovery funds.
Fort Walton Beach will establish project funding priorities and will
make application to state and federal funding sources. Should an
award be received, Fort Walton Beach will establish procedures and
adhere to state, federal guidelines in the use of the funds.
D. STATEANDjORFEDERAL.
State and federal govemment mitigation programs are numerous, varied,
and are often hazard specific. Funding to local government varies. A
Presidential Declaration will require mitigation planning as a requirement
of receiving federal assistance.
E. POST DISASTER.
1. Hazard Mitigation Reports
When the President makes. a Disaster Declaration, the Disaster Relief
Act of 1974, Section 408, as amended, sets forth certain conditions for
receiving any federal disaster loans or grants, specifically that
mitigation measures will be taken to prevent such damages from
reoccurring. The ability of Fort Walton Beach to comply with these
requirements will depend on manpower requirements and funding
availability .
Fort Walton Beach will use the Disaster Declaration to highlight
and infrastructure, human services,
geographic subject areas (
mitigation) that need further addressing.
2. Interagency Hazard Mitigation Team.
An Interagency Hazard Mitigation Team is established consisting of
representatives from federal. state, and local government. The
Development Services Division will assist Fort Walton. Beach
Emergency Management Director in coordinating efforts and selecting
106-
Fort Walton Beach Initigation tearn members during a Presidential
declared disaster.
Q
The role of. Fort Walton Beach is to provide local coordination and to
identify geographic areas for survey tours.
It
The Interagency Hazard Mitigation Team prepares three
reports at
different time intervals after the disaster to document mitigation needs, .
recommendations for actiohs; and progress on mitigation actiVities to
reduce future impacts in the disaster area. The Federal Emergency
ManageJnent Agency ( FEMA) provides guidance for these reports
through the Florida Division of Emergency Management after a
Presidential Declaration of Disaster.
3. Mutual Aid.
Fort Walton Beach issignatory to the State of Florida,
