- $ 13. 65 per linear foot
b. February 8, 2006 - $ 18. 65 per linear foot
c. March 30, 2006 - $ 27.40 per linear foot
d. April 25, 2006 - $ 32.00 per linear foot
e. Unit price bid for the 8- inch ductile tron p1pe was $ 136.00 per linear foot ( includes
installation costs)
2. Between the time of initial design and bidding of the project, a substantial increase also occurced in
the material cost of the stainless steel pipe hangers and rollers due to the significant increase in
petroleum prices:
a.
August 2005 - $ 110.00 each without the threaded rods and hardware
b. April 25, 2006 - $ 170.00 each without the threaded rods and hardware
c. Unit price bid for the stainless steel pipe hangers and rollers was $ 400.00 each
3. To construct this project,contractors were required to obtain a special marine construction insurance
policy, resulting in a cost increase of $10,000 to $ 15,000.
The bid price for the proposed 8-
inch sanitary sew~r force main exceeds the construction estimate for the
reasons oudined above. Unfortunately, we do not have an alternative route for this force main and not
constructing the main could result in enforcement actions from FDEP if the existing force main experiences
2
another failure. Staff discussed the possibility of re- bidding the project; however, the low bidder has
stated
c that they will not re- bid the project resulting
current low bid of $
in the possibility
254,148. There is also nothing substantial
of
that
receiving
could be
less bids
deducted
or bids
from
that
the
exceed the
project design
which would result in significant savings.
the
Staff does not recommend re- bidding the project based on the reasons listed above and because of
in current year carry- overs the
volatility of the bidding environment. Sufficient funding does exist
to cover
of this The available funding is identified as follows:
cost project.
CIP 5032 ( Sewer Lining/ Rehab/ Grouting) - Last year' s element of this capital project was funded
in a carry-over
through the " Utility System Revenue Bonds, Series 2005," resulting
appropriation of $199, 193. 70.
CIP 5065 ( Sewer Line Replacement Program) - Currently there is $ 69, 400 appropriated for this
in funds available for related projects.
year' s projects, with an additional $219,630 carry-over
A portion of the remaining balance for this CIP will be applied to the remaining funds in
CIP 5032 to cover the cost of the Cinco Bayou Force Main relocation project, plus any
unanticipated change orders.
Staff does not anticipate any impact on other planned improvements funded through the Series 2005 Bonds
or the on- going CIP improvements due to the increases identified for this element of the utility
improvements.
Recommendation:
Staff requests Council authorization to award Bid No. 06-118, Cinco Bayou Sanitary Sewer Improvement
Inc. of Aorence, Mississippi, in
Project, to the low, responsive, responsible bidder Hemphill Construction,
inch ductile iron aerial sanitary sewer
the amount of $254, 148 for the construction of 1, 100 linear feet of 8-
AfIIIII& '.
force main underneath the Cinco Bayou Bridge, and further authorization for the City Manager to execute
individual change orders not to exceed the aggregate total of $15,000. If approved, sufficient funding totaling
269, 148 does exist in accounts 401- 5065-535- 6997 and 401- 5032- 535- 6997.
Submitted By:
o"
Mic a Bee e, U lttes rattons ager Date
5=/?-
exo
Date
517.0b
ce
eQw . L
hanahan, Clty Manager Date
Attachments:
1. Bid No. 06- 118 Tabulation
3
City of Fort Walton Beach
MEMORANDUM
DATE: April 26, 2006
TO: John Hofstad
Utilities Department Director
FROM: Michael C. Tatum
Purchasing
t::
S0
Director\:!
SUBJECT: Cinco Bayou Sanitary Sewer Improvement Project
Bid # 06- 118 .
The referenced bid tabulation is forwarded for your review. In accordance with Vol 2,
Chapter 4, Section 4. 01, Paragraph 4. 01. 025 Code of Ordinances and the Purchasing
Policies and Procedures. Please take the necessary action to prepare the
Memorandum for Approval by the City Manager and Council. The bid file is available
for review at the Purchasing Department.
The following information is furnished for those items applicable to Purchasing on the
Request To Award Bid Memorandum:
ITEM NO.lDESCRIPTON RESPONSE
16. Number of Bids Solicited 18
17. Number of Bids Received 2
18. Number of Responsive Bids 2
24. Tabulation Attached Yes
30. State Contract No
MCT/ mhj
BID TABULATION
April 25, 2006
Cinco Bayou Sanitary Sewer Improvement Project
Bid 0
# 6-118 Hemphill ColIStI'uctio" Soutlwlste",
Company, I"e. Utulergrotmd,Inc.
FlorellCe,MS Crestview, FL
Irem __
No. Quantity Unit Deseri tion Unit Price I Total Priee Unit Price I Total Priee
1_:':'<,.}. .";,,,/,....., tIP.. l,>, .. r~. j~~~!...)..)~, . ,,'~:""',:'.':.,.,,' ~
8" D.I. (Class 54) Restrained Joint Sewer Pipe
1 1100 LF wI Ceramic Epoxy Liner $ 136. 00 1$ 149, 600. 00 $ 137. 63 / $ 151, 393. 00
8" D.I. (Class 54) Spool Piece (FL x PE) wI
2 2 EA Ceramic Epoxy Liner $ 1, 150.00 / $ 00 $
2,300. 1, 308.58/ $ 2~
617. 16
8" D.I. (Class 54) Spool Piece FL
( x RJ)wI
3 2 EA Ceramic Epoxy Liner $ 954. 00 I $1, 908.00 $ 1~428.21 I $
2~ 856.42
4 3 EA 8" 900 Bend wI Ceramic Epoxy Liner $ 480. 00 I $1, 440.00 $