READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 7, 2014 — FOY SHAW SCOPE OF SERVICES_PHASE II DESIGN — reading text

Part 6 of 7. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 154-FOY SHAW SCOPE OF SERVICES_PHASE II DESIGN.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

COUNTY Surveyor (DS) or COUNTY Location Surveyor (DLS); may include primary or secondary control points. Includes analysis and processing of field collected data, and preparation of forms. 27.2 Vertical Project Control (VCP) Establish or recover VCP, for the purpose of establishing vertical control on datum approved by the COUNTY Surveyor (DS) or the COUNTY Location Surveyor (DLS).; may include primary or secondary vertical control points. Includes analysis and processing of field collected data, and preparation of forms. 27.3 Alignment and/or Existing Right of Way Lines Establish, recover or re-establish project alignment. Also includes analysis and processing of field collected data, existing maps, and/or reports for identifying mainline, ramp, offset, or secondary alignments. Depict alignment and/or existing R/W lines (in required format) per COUNTY R/W Maps, platted or dedicated rights of way. 27.4 Aerial Targets (Not applicable to this project) 27.5 Reference Points Reference HPNC points, project alignment, vertical control points, section, ¼ section, center of section corners and G.L.O. corners as required. 27.6 Topography/DTM (3D) Locate above ground features and improvements for the limits of the project by collecting the required data for the purpose of creating a DTM with sufficient density. Shoot break lines, high and low points. Effort includes field edits, analysis and processing of field collected data, existing maps, and/or reports. 27.7 Planimetric (2D) (Not applicable to this project) 27.8 Roadway Cross Sections/Profiles Perform cross sections or profiles. May include analysis and processing of field-collected data for comparison with DTM. 27.9 Side Street Surveys (Not applicable to this project) 27.10 Underground Utilities (Not applicable to this project) 27.11 Outfall Survey (Not applicable to this project) 27.12 Drainage Survey (Not applicable to this project) 27.13 Bridge Survey (Minor/Major) (Not applicable to this project) 27.14 Channel Survey Locate topographic features and improvements for the limits of the project by collecting the required data. Includes field edits, analysis and processing of field collected data, maps, and/or reports. 27.15 Pond Site Survey Refer to tasks of this document as applicable. 27.16 Mitigation Survey (Not applicable to this project) 27.17 Jurisdiction Line Survey Perform field location (2-dimensional) of jurisdiction limits as defined by respective authorities, also includes field edits, analysis and processing of field collected data, preparation of reports. 27.18 Geotechnical Support Perform 3-dimensional (X,Y,Z) field location, or stakeout, of boring sites established by geotechnical engineer. Includes field edits, analysis and processing of field collected data and/or reports. 27.19 Sectional/Grant Survey (Not applicable to this project) 27.20 Subdivision Location (Not applicable to this project) 27.21 Maintained R/W (Not applicable to this project) 27.22 Boundary Survey (Not applicable to this project) 27.23 Water Boundary Survey (Not applicable to this project) 27.24 Right of Way Staking / Right of Way Line (Not applicable to this project) 27.25 Right of Way Monumentation Set R/W monumentation as depicted on final R/W maps for corridor and water retention areas. 27.26 Line Cutting Perform efforts required to clear vegetation from the line of sight. 27.27 Work Zone Safety Provide work zone as required by COUNTY standards. 27.28 Miscellaneous Surveys Refer to tasks of this document, as applicable, to perform surveys not described herein. The percent for Supplemental will be determined at negotiations. This item can only be used if authorized in writing by the COUNTY Surveyor (DS), COUNTY Location Surveyor (DLS) or their representative. 27.29 Supplemental Surveys Supplemental survey days and hours are to be approved in advance by CLS. Refer to tasks of this document, as applicable, to perform surveys not described herein. 27.30 Document Research Perform research of documentation to support field and office efforts involving surveying and mapping. 27.31 Field Review Perform verification of the field conditions as related to the collected survey data. 27.32 Technical Meetings Attend meetings as required and negotiated by the Surveying and Mapping COUNTY. 27.33 Quality Control/Quality Assurance Establish and implement a QAQC plan. Also includes subconsultant review, response to comments and any resolution meetings if required, preparation of submittals for review, etc. 27.34 Supervision Perform activities required to supervise and coordinate project. These activities must be performed by the project supervisor, a Florida P.S.M. or their delegate as approved by the District Surveying Office. 27.35 Coordination Coordinate survey activities with other disciplines. Unit is based on 3 percent of office support hours from tasks 1 through 28, where applicable.) These activities must be performed by the project supervisor, a Florida P.S.M. or their delegate as approved by the District Surveying Office. 28 PHOTOGRAMMETRY (Not applicable to this project) 29 MAPPING (Optional Service) The CONSULTANT will be responsible for the preparation of control survey maps, right of way maps, maintenance maps, sketches, other miscellaneous survey maps, and legal descriptions as required for this project in accordance with applicable COUNTY Manuals, Procedures, Handbooks, District specific requirements, and Florida Statutes. Maps, surveys and legal descriptions will be prepared under the direction of a Florida Professional Surveyor and Mapper (PSM) to COUNTY size and format requirements utilizing COUNTY approved software, and will be designed to provide a high degree of uniformity and maximum readability. The CONSULTANT will submit maps, legal descriptions, quality assurance check prints, checklists, electronic media files and any other documents as required for this project to the COUNTY for review at stages of completion as negotiated. Master CADD File 29.1 Alignment 29.2 Section and 1/4 Section Lines (Not applicable to this project) 29.3 Subdivisions / Property Lines (Not applicable to this project) 29.4 Existing Right of Way (Not applicable to this project) 29.5 Topography 29.6 Parent Tract Properties and Existing Easements (Not applicable to this project) 29.7 Proposed Right of Way Requirements The ENGINEER OF RECORD (EOR) will provide the proposed requirements. The PSM is responsible for calculating the final geometry. Notification of Final Right of Way Requirements along with the purpose and duration of easements will be specified in writing. 29.8 Limits of Construction The limits of construction DGN file as provided by the EOR will be imported or referenced to the master CADD file. Additional labeling will be added as required. The PSM is required to advise the EOR of any noted discrepancies between the limits of construction line and the existing/proposed right of way lines, and for making adjustments as needed when a resolution is determined. 29.9 Jurisdictional/Agency Lines (Not applicable to this project) These lines may include, but are not limited to, jurisdictional, wetland, water boundaries, and city/county limit lines. Sheet Files 29.10 Control Survey Cover Sheet (Not applicable to this project) 29.11 Control Survey Key Sheet (Not applicable to this project) 29.12 Control Survey Detail Sheet (Not applicable to this project) 29.13 Right of Way Map Cover Sheet 29.14 Right of Way Map Key Sheet 29.15 Right of Way Map Detail Sheet 29.16 Maintenance Map Cover Sheet (Not applicable to this project) 29.17 Maintenance Map Key Sheet (Not applicable to this project) 29.18 Maintenance Map Detail Sheet (Not applicable to this project) 29.19 Reference Point Sheet This sheet(s) will be included with the Control Survey Map, Right of Way Map and Maintenance Map. 29.20 Project Network Control Sheet This sheet depicts the baseline, the benchmarks, the primary and secondary control points and their reference points including the type of material used for each point, their XYZ coordinates, scale factors and convergence angles. This sheet(s) may be included with the Control Survey Map, Right of Way Map and Maintenance Map. 29.21 Table of Ownerships Sheet Miscellaneous Surveys and Sketches 29.22 Parcel Sketches (Not applicable to this project) 29.23 TIITF Sketches (Not applicable to this project) 29.24 Other Specific Purpose Survey(s) (Not applicable to this project) 29.25 Boundary Survey(s) Map 29.26 Right of Way Monumentation Map 29.27 Title Search Map (Not applicable to this project) 29.28 Title Search Report (Not applicable to this project) 29.29 Legal Descriptions 29.30 Final Map/Plans Comparison The PSM will perform a comparison of the final right of way maps with the available construction plans to review the correctness of the type of parcel to be acquired and the stations/offsets to the required right of way. The PSM will coordinate with the EOR to resolve any conflicts or discrepancies and provide documentation of the review. 29.31 Field Reviews 29.32 Technical Meetings 29.33 Quality Assurance/Quality Control 29.34 Supervision 29.35 Coordination 29.36 Supplemental Mapping (Not applicable to this project) 30 GEOTECHNICAL The CONSULTANT shall, for each project, be responsible for a complete geotechnical investigation. Work performed by the CONSULTANT shall be in accordance with COUNTY standards. The CONSULTANT shall notify the COUNTY in adequate time to schedule a representative to attend related meetings and field activities. CONSULTANT shall perform specialized field-testing as required by project needs. Testing and classification will be performed in accordance with applicable COUNTY standards, ASTM Standards or AASHTO Standards, unless otherwise specified in the Contract Documents. Standard Penetration Testing will be performed using an automatic hammer. 30.1 Document Collection and Review CONSULTANT will review printed literature including topographic maps, county agricultural maps, aerial photography (including historic photos), ground water resources, geology bulletins, potentiometric maps, pile driving records, historic construction records and other geotechnical related resources. Prior to field reconnaissance, CONSULTANT shall review U.S.G.S., S.C.S. and potentiometric maps, and identify areas with problematic soil and groundwater conditions. Roadway The CONSULTANT shall be responsible for coordination of geotechnical related fieldwork activities. The CONSULTANT shall retain samples until acceptance of Final plans. 30.2 Develop Detailed Boring Location Plan Develop a detailed boring location plan. Meet with COUNTY Geotechnical Project Manager for boring plan approval. If the drilling program expects to encounter artesian conditions, the CONSULTANT shall submit a methodology(s) for plugging the borehole to the COUNTY for approval prior to commencing with the boring program. 30.3 Stake Borings/Utility Clearance Stake borings and obtain utility clearance.

Download this text file with its original spacing ↓