READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — October 7, 2014 — FOY SHAW SCOPE OF SERVICES_PHASE II DESIGN — reading text

Part 4 of 7. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 154-FOY SHAW SCOPE OF SERVICES_PHASE II DESIGN.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Plans, USGS Quadrangles, USGS Studies, NWFWMD Studies, FEMA Studies, Local Government Agency Studies or Contours, etc. The drainage map should be included in the Hydraulic Design Study. The Hydrology should be by regional or local regression equations, or by the rational method. An assumed velocity should not be used. The CONSULTANT shall document the Drainage Design in the Drainage Design Study. The Design Study should show that the design requirements of the COUNTY, FDOT and FAA have been met. The CONSULTANT has the responsibility for determining the need, appropriate locations, and sizes for water management facilities, and drainage outfalls. The CONSULTANT shall refer Phase I – NEPA Environmental Assessment for preliminary pond sites studied. The CONSULTANT shall be advised that pond locations must be located within the footprint of the Phase I – NEPA Environmental Assessment. The CONSULTANT shall evaluate the need for diversion ditch systems along the project length to prevent comingling of overland runoff with roadway runoff in order to minimize pond sizings. The CONSULTANT shall provide the COUNTY a Drainage Design Documentation. The documentation shall include a narrative description of existing and proposed drainage structures, conditions, and facilities, and a listing of environmental regulatory permits required. Hydrologic and hydraulic drainage computations for the design presented in the plans shall be included along with supporting design information such as drainage maps, geotechnical data (such as soil borings and permeability tests), and correspondence that directly affected design decisions. The CONSULTANT shall coordinate fully with the appropriate permitting agencies and the COUNTY’s staff. Activities and submittals should be coordinated through the COUTNY’s Project Manager. The work will include the engineering analyses for any of the following: 6.1 Determine Base Clearance Water Elevation Analyze, determine, and document high water elevations which will be used to set roadway profile grade. Determine surface water elevations at cross drains, floodplains, outfalls and adjacent stormwater ponds. Determine groundwater elevations at intervals between the above-mentioned surface waters. 6.2 Pond Siting Analysis and Report Update Pond Siting Analysis and Report done in the Phase I – NEPA Environmental Assessment. 6.3 Design of Cross Drains Analyze the hydraulic design of cross drains. Check existing cross drains to determine if they are structurally sound and can be extended. Document the design as required. Determine and provide flood data as required. 6.4 Design of Roadway Ditches Design roadway conveyance ditches. This includes determining ditch cross sections, grades, selecting suitable channel lining, designing the side drain pipes, and documentation. 6.5 Design of Outfalls Analyze and document the design of ditch or piped outfalls. (Pond outlet structure included in task 6.6) 6.6 Design of Stormwater Management Facility (Offsite Pond) Design stormwater management facilities to meet requirements for stormwater quality treatment and attenuation. Develop proposed pond layout (shape, contours, slopes, etc.), perform routing calculations, and design the outlet control structure. 6.7 Design of Stormwater Management Facility (Roadside Ditch as Linear Pond or Infield Pond) (Not applicable to this project) 6.8 Design of Flood Plain Compensation Area Determine flood plain encroachments, coordinate with regulatory agencies, and develop proposed compensation area layout (shape, contours, slopes, etc.). Document the design following the requirements of the regulatory agency. 6.9 Design of Storm Drains Develop a “working drainage map”, determine runoff, inlet locations, and spread. Calculate hydraulic losses (friction, utility conflict and, if necessary, minor losses). Determine Design Tailwater and, if necessary, outlet scour protection. 6.10 Optional Culvert Material Determine acceptable options for pipe materials. 6.11 French Drain Design (Not applicable to this project) 6.12 Drainage Wells (Not applicable to this project) 6.13 Drainage Design Documentation Report Compile drainage design documentation into report format. Include documentation for the drainage design tasks and associated meetings and decisions, except the Pond Siting Analysis Report. 6.14 Bridge Hydraulic Report (Not applicable to this project) 6.15 Temporary Drainage Analysis (Not applicable to this project) 6.16 Cost Estimate 6.17 Technical Special Provisions (Not applicable to this project) 6.18 Other Drainage Analysis (Not applicable to this project) 6.19 Field Reviews 6.20 Technical Meetings 6.21 Quality Assurance/Quality Control 6.22 Independent Peer Review (Not applicable to this project) 6.23 Supervision 6.24 Coordination 7 UTILITIES The CONSULTANT shall identify utility facilities and secure agreements, utility work schedules, and plans from the Utility Agency Owners (UAO) ensuring no conflicts exist between utility facilities and the COUNTY’s construction project. The CONSULTANT shall certify utility negotiations have been completed with arrangements made for utility work to be undertaken. 7.1 Kickoff Meeting (Not applicable to this project) 7.2 Identify Existing UAO(s) Identify utilities in the corridor; check with Maintenance for Permits, Sunshine State One Call, Subsurface Utility Engineering (SUE) Report, Design Location Survey, and Existing Plans. 7.3 Make Utility Contacts First Contact: Send letters and two sets of plans to each utility, one set for the utility office, one set each to construction and maintenance if required. Includes contact by phone for meeting coordination. Request type, size, location, easements, cost for compensable relocation, and justification for any utility exceptions. Include the meeting schedule (if applicable) and the design schedule. Include typical meeting agenda. Second Contact: At a minimum of 4 weeks prior to the meeting, the CONSULTANT shall transmit two complete sets of Phase II plans to each UAO having facilities located within the project limits, and one set to the COUNTY Offices as required by the District. Third Contact: Identify agreements and assemble packages. Send agreements, letters and two sets of plans to the UAO(s) including component sets, one set for the utility office, one set to construction and maintenance if required. Include the design schedule. Not all projects will have all contacts as described above. 7.4 Exception Coordination (Not applicable to this project) 7.5 Preliminary Utility Meeting (Not applicable to this project) 7.6 Individual/Field Meetings The CONSULTANT shall meet with each UAO separately throughout the project design duration to provide guidance in the interpretation of plans, review changes to the plans and schedules, optional clearing and grubbing work, and assist in the development of the UAO(s) plans and work schedules. The CONSULTANT is responsible for motivating the UAO to complete and return the necessary documents after each Utility Contact or Meeting. 7.7 Collect and Review Plans and Data from UAO(s) Make Determinations (Compensable Interest, Easements, Coordinate, Analyze). Ensure information (utility type, material and size) is sent to the designer for inclusion in the plans. Coordinate programming of funds. 7.8 Subordination of Easements Coordination (Not applicable to this project) 7.9 Utility Design Meeting (Not applicable to this project) 7.10 Review Utility Markups and Work Schedules and Processing of Schedules and Agreements Review utility marked up plans individually as they are received for content and coordinate review with the designer. Send color markups and schedules to the appropriate COUNTY office(s) for review and comment if required. 7.11 Utility Coordination/Followup This includes follow-up, interpreting plans, and assisting and the completion of the UAO(s) work schedule and agreements. Includes phone calls, face-to- face meetings, etc., to motivate and ensure the UAO(s) complete and return the required documents in accordance with the project schedule. Ensure the resolution of known conflicts. This task can be applied to all phases of the project. 7.12 Utility Constructability Review Review utility schedules against construction contract time, and phasing for compatibility. Coordinate with and obtain written concurrence from the construction office. 7.13 Additional Utility Services (Not applicable to this project) . 7.14 Processing Utility Work by Highway Contractor (UWHC) (Not applicable to this project) 7.15 Contract Plans to UAO(s) (Not applicable to this project) 7.16 Certification/Close-Out This includes hours for transmitting utility files to the DUO and preparation of the Utility Certification Letter. The CONSULTANT shall certify to the appropriate COUNTY representative the following: Utility negotiations (Full execution of each agreement, approved Utility Work Schedules, technical special provisions written, etc.) have been completed with arrangements made for utility work to be undertaken and completed as required for proper coordination with the physical construction schedule. OR An on-site inspection was made and no utility work will be involved. OR Plans were sent to the Utility Companies/Agencies and no utility work is required. 7.17 Other Utilities (Not applicable to this project) 8 ENVIRONMENTAL PERMITS, COMPLIANCE AND CLEARANCES The CONSULTANT shall notify the COUNTY Project Manager and other appropriate personnel in advance of scheduled meetings with the regulatory agencies to allow a COUNTY representative to attend. The CONSULTANT shall copy in the Project Manager and the Environmental Permit Coordinator on permit related correspondence and meetings. 8.1 Preliminary Project Research The CONSULTANT shall perform preliminary project research and shall be responsible for early identification of and coordination with the appropriate regulatory agencies to assure that design efforts are properly directed toward permit requirements. 8.2 Complete Permit Involvement Form The CONSULTANT shall document permit involvement in coordination with the COUNTY Project Manager. This is to be done upon completion of preliminary project research. 8.3 Establish Wetland Jurisdictional Lines and Assessments The CONSULTANT shall collect data and information necessary to determine the boundaries of wetlands and surface waters defined by the rules or regulations of each agency processing or reviewing a permit application necessary to construct a COUNTY project. The CONSULTANT is to stake or flag the State and Federal jurisdictional lines. A registered surveyor will be required to survey these jurisdictional lines. The consultant must remove stakes or flags after the environmental permits are approved. The contractor is

Download this text file with its original spacing ↓