Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
grant Destin received provides 80% of
project funding with a required 20% funding match. The Okaloosa Department of Public Safety
would provide the 20% funding match from the IRCP for this project in the amount of
$81,284.50.
OPTIONS: Approve/Disapprove.
RECOMMENDATIONS: Authorize the Chairman to execute the Interlocal Agreement and
approve ICP funding match for radio antenna.
RECOMMENDED BY:
Packet Pg. 598
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 599
Packet Pg. 600
Packet Pg. 601
Packet Pg. 602
Packet Pg. 603
Packet Pg. 604
Packet Pg. 605
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: September 17, 2013
TO: Honorable Chairman and Members of the Board
FROM: Dino J. Villani
SUBJECT: Physio-Control LifePak Service Agreement
DEPARTMENT: Public Safety
BCC DISTRICT: All
STATEMENT OF ISSUE: Request approval of the Physio-Control LifePak service agreement
for the period October 1, 2013, through September 30, 2015, in the amount of $51,032.00.
BACKGROUND: Okaloosa County Public Safety utilizes Physio-Control LifePak 12 cardiac
monitor-defibrillators exclusively for advanced life support cardiac monitoring and treatment.
Physio-Control automatic external defibrillators (AEDs) are also utilized on the beaches and on
several department quick response vehicles. The service and battery replacement for these
monitor-defibrillators can only be done by Physio-Control. Physio-Control has been used
exclusively for more than 19 years without any significant problems.
OPTIONS: Approve or disapprove.
RECOMMENDATIONS: Approve the service agreement with Physio-Control.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 606
Packet Pg. 607
Packet Pg. 608
Packet Pg. 609
Packet Pg. 610
Packet Pg. 611
Packet Pg. 612
Packet Pg. 613
Packet Pg. 614
Packet Pg. 615
BOARD OF COUNTY COMMISSIONERS
AGENDA REQUEST
DATE: September 17, 2013
TO: Honorable Chairman and Members of the Board
FROM: Jeff Littrell
SUBJECT: Gator Boring Task Order 63 Revision 3
DEPARTMENT: Water and Sewer
BCC DISTRICT: Two & Three
STATEMENT OF ISSUE: OCWS has requested the services of Gator Boring under Task
Order 63 Revision 3 per the terms of Contract #C05-1117-WS. Revision 3 (attached) adds
$79,552.14 to the current Task Order amount, for a new Task Order total of $536,866.15.
BACKGROUND: In September 2011, Okaloosa County went under contract (FA2823-11-C-
0030; County Contract No. C11-1906-WS) with the U.S. Air Force for the construction of the
Duke Field wastewater infrastructure. The contract was modified in August 2012 to add the
following: Capacity Expansion Charges (CECs) for Duke Field, construction costs for Main
Base wastewater infrastructure, CECs for Main Base, construction costs for Camp Rudder
wastewater infrastructure, and CECs for Camp Rudder. The total contract is now $16,699,568;
of that, $8,026,192 is reimbursement of design and construction costs, and $8,673,376 is for
CECs.
Eglin has elected to decommission its two wastewater treatment facilities located on the Main
Base, and per the above-mentioned contract, OCWS will design and construct a new conveyance
system. The new system will divert all of the wastewater received at their Main and Plew
wastewater plants and pump it to the OCWS Arbennie Pritchett WRF. For design, permitting,
and construction, OCWS has phased the project into 2 phases. Phase 1 consists of a 24" force
main and the Main Base Lift Station; Phase 2 consists of a 16" force main and the Plew Lift
Station.
In May 2013, the BCC approved Task Order 63 to Gator Boring for the necessary bores in the
above-mentioned Phase 1. Since then, Eglin has asked us to install the infrastructure that runs
through the Housing Privatization area ASAP, due to legal issues. Therefore, Phase 2 was
broken down into Phase 2A and 2B. Phase 2A is the 16" force main through the Housing
Privatization area, and Phase 2B is the portion of the 16" force main outside of the Housing
Privatization area. Task Order 63 Revision 1 (adding $38,595.86) and Revision 2 (adding
$2,017.20) were executed so that Phase 2A could be accomplished - consisting of two 16" HDPE
directional bores. Task Order 63 Revision 3 (adding $79,552.14) is now for work to be
accomplished in Phase 2B - consisting of two 16" HDPE directional bores and one 24" steel
casing jack and bore.
Please see the attached aerial photo depicting the approximate locations of the force main
alignment. OCWS will be reimbursed for the work by the U.S. Government, per the contract.
OPTIONS: Approve or deny.
RECOMMENDATIONS: OCWS requests BCC approval to authorize the Chairman to execute
Packet Pg. 616
Gator Boring Task Order 63 Revision 3, adding $79,552.14, for a not to exceed amount of
$536,866.15.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 617
Packet Pg. 618
Packet Pg. 619
Y
HW
RY
CLA
J
Line Between 2 Power Lines
ER
ROG
RR 236
Connection to
7th SFG Main
233
Gulf Power Easement
Connection to
N
7SFG Main
85
HW Y
236
HWY 85 N
D
HWY 85 N
File: \\gissv2\gisprojects\MapDocs\OCWS\EglinMainFMRoutes.mxd, PDF: \\gissv2\gisprojects\PDFdocs\OCWS\7EglinMainFMRoutes.pdf, Size: 8.5x11, Analyst: K.steele, Date: April 9, 2013.
LV
N DB
BO
W
RT
O BE NO
NR MA
GE D
WA
Y
GR
FIN
IF