October 13, 2015

Okaloosa County BOCC — October 13, 2015 — Presentation Timeline and Process

Presentation Timeline and Process in the October 13, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the October 13, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1314). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used ; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Presentation Timeline and Process
Date
October 13, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
12
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Presentation Timeline and Process — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 5.9 KB · 12

Download ↓

Presentation Timeline and Process — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 2.1 MB · 12

Download ↓

Reading text preview

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Presentation Timeline and Process — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BCC Okaloosa RESTORE Advisory Committee (ORAC) Workshop Timeline and Process October 13, 2015 1:00 PM Okaloosa County Administration Building Okaloosa RESTORE Advisory Committee (ORAC) ∗ Established by Okaloosa Board of County Commissioners Resolution Number 13-47 in March 2013 ∗ Eleven member committee representing: ∗ 2 – League of Cities (Ms Seevers* and Mr Whitten) ∗ 2 – Chamber of Commerce (Dr Azzaretto and Mr Haugen) ∗ 2 – At large (Mr Breitenfeld and Mr Tallman) ∗ 1 – Okaloosa School Board (Mr Destin) ∗ 1 – Charter Boat / Fisherman’s Cooperative (Capt Gary Jarvis) ∗ 1 – Tourism and Lodging (Mr Owen) ∗ 1 – Economic Development Council (Ms Rasmussen) ∗ 1 – Environmental Community (Dr Shippee) * Board Chair Setting the Stage Mission Statement The Okaloosa RESTORE Advisory Committee (ORAC), in conjunction with Okaloosa County staff and its consultants, shall develop a Multi-Year Plan and formulate a comprehensive strategy to maximize the benefits of RESTORE Act funding designated for Okaloosa County. The ORAC’s efforts will inform and assist the Okaloosa Board of County Commissioners (BCC) in their task of approving the Multi-Year Plan. The ORAC shall recommend projects selected in a fair and transparent manner to the BCC to help restore and protect our portion of the Gulf Coast region. Setting the Stage Goals 1. Perform all tasks in a transparent and ethical manner while encouraging maximum public participation 2. Identify priorities and develop rigorous evaluation criteria 3. Design and field an efficient and effective project submittal process 4. Improve County website and other management tools associated with the RESTORE process 5. Develop an executable Multi-Year Implementation Plan Roadmap Funding Sources /Rigorous Evaluation ü Form the ORAC ü Establish administrative ground rules Public Input / Full Transparency ü Educate the ORAC on the RESTORE process ü Establish ORAC mission statement and goals ü Evaluate Treasury Rules ü Develop model to help evaluate projects ü Test the model with several projects ü Refine model as necessary ü Develop project submission protocol ü Develop project information collection tool ü Collect project requests ü Use model to score and rank projects q Develop Multi-Year Implementation Plan Evaluation Tool Quantitative Qualitative Score Score ORAC ORAC Final Weighted as Weighted as Score 70% 30% Quantitative Score Proposed Quantitative Factors Significance Score Economic 1. Gross Product per RESTORE $ Invested (11%) ______ 2. Return on Investment and LC Cost (13%) ______ 3. Economic Diversification (14%) ______ General 4. Implementation Readiness (10%) ______ 5. Project Feasibility (13%) ______ 6. Restore/Enhance/Protect Habitats (11%) ______ Environmental 7. Replenish/Protect Living Coastal & Marine Resources (11%) ______ 8. Restore/Improve/Protect Water Resources (

Download this text file with its original spacing ↓

Read all text · 1 part →

Only a preview is loaded on this record page. The linked reading pages contain the remaining text and work without JavaScript.

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — October 13, 2015 — Presentation Timeline and Process.” October 13, 2015. Presentation Timeline and Process. Crypt of Echoes evidence ID LED-2026-2f143df95f384c3e928f9290b2d48e08. http://127.0.0.1:58097/evidence/LED-2026-2f143df95f384c3e928f9290b2d48e08. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Presentation Timeline and Process, meeting materials for October 13, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=9717&MeetingID=1314

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓