Meigs Seminole Preliminary Cost Estimate 5.15.15 — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Preliminary Cost Estimate OCWS Meigs Seminole PS and Forcemain 2015 Estimate 2012 Estimate Line No. Line Item Quantity Unit Unit Price Total Unit Price Total 1 New Pumping Station/elctrical bldg/generator 1 LS $ 805,000.00 $ 805,000.00 $ 680,000.00 $ 680,000.00 2 12" PVC C900 DR 18 5,500 LF $ 15.00 $ 82,500.00 $ 15.00 $ 82,500.00 3 12" Directional Drill (Gator Boring) 500 LF $ 100.00 $ 50,000.00 $ 100.00 $ 50,000.00 4 12" plug valves w/ box & megalug kit 3 EA $ 3,500.00 $ 10,500.00 $ 5,000.00 $ 15,000.00 5 16" RJDI 1,900 LF $ 64.72 $ 122,968.00 $ 45.00 $ 85,500.00 6 16" plug valves w/ box & megalug kit 4 EA $ 4,550.00 $ 18,200.00 $ 8,000.00 $ 32,000.00 7 air release/vacuum valve w/ MH, GV, valve box 4 EA $ 4,500.00 $ 18,000.00 $ 4,500.00 $ 18,000.00 8 16" Megalug Kits 20 EA $ 150.00 $ 3,000.00 $ 200.00 $ 4,000.00 9 Tapping saddle and appurtenances for testing/filling 3 EA $ 500.00 $ 1,500.00 $ 300.00 $ 900.00 10 DI Fittings 1 LS $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 11 14" Line Stops (EA Tapping Services) 3 EA $ 8,000.00 $ 24,000.00 $ 6,000.00 $ 18,000.00 12 Seeding & Mulching 1 AC $ 15,000.00 $ 15,000.00 $ 200.00 $ 200.00 13 Erosion Control: Silt Fence 200 LF $ 3.00 $ 600.00 $ 0.19 $ 38.00 14 Concrete Flume/Sidewalk Replacement 100 SF $ 3.33 $ 333.00 $ 3.00 $ 300.00 15 OCWS in-house labor (500 LF/day) 21 DAYS $ 3,000.00 $ 63,000.00 $ 3,000.00 $ 63,000.00 16 OCWS in-house equipment (500 LF/day) 21 DAYS $ 1,590.00 $ 33,390.00 $ 1,000.00 $ 21,000.00 TOTAL OCWS MATERIALS $ 1,159,601.00 $ 994,438.00 TOTAL OCWS LABOR + EQUIP $ 96,390.00 $ 84,000.00 SUBTOTAL CONSTRUCTION (Includes Contracted Services) $ 1,255,991.00 $ 1,078,438.00 16 15% contingency on materials $ 173,940.15 $ 149,165.70 17 15% admin/overhead fee on labor/mat'l (not equip or contracted) $ 183,390.15 $ 158,615.70 TOTAL CONSTRUCTION $ 1,613,321.30 $ 1,386,219.40 18 surveying & engineering (10% of total construction) 1 LS $ 161,332.13 $ 161,332.13 $ 138,621.94 $ 138,621.94 19 Geotechnical (Contracted Service) 1 LS $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 20 Permit Application Fees 1 LS $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 TOTAL $ 1,778,153.43 TOTAL $ 1,528,341.34

Download this text file with its original spacing ↓