READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 08-08-06 ‎(regular)‎ — reading text

Part 11 of 13. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-13097-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

2 1111". The funding for construction of this project is authorized under the debt funding methodology tflPl'" previously approved by City Council through resolution 04-33. If approved, sufficient funding does exist in account # 401- 5055- 533- 6300, Utilities Fund,Capital Improvement Projects. Submitted By: Michael B die, Utilities Operations Manager Date Reviewed and Concur: Jo~~ Utilities Director Date Reviewed and Concur: O~ CityManager Date Attachments: 1. Bid No. 06- 123 Tabulation 3 City of Fort Walton Beach MEMORANDUM DATE: June 28, 2006 TO: John Hofstad Utilities Department Director FROM: Michael C. Tatum ~ Purchasing Director SUBJECT: Demolition of Elevated Water Tanks Bid # 06- 123 The referenced bid tabulation is forwarded for your review. In accordance with Volume 2, Chapter 4, Section 4. 01, Paragraph 4. 01. 025 Code of Ordinances and the Purchasing Policies and Procedures. Please take the necessary action to prepare the Memorandum for Approval by the City Manager and Council. The bid file is available for review at the Purchasing Department. tj~ The following information is furnished for those items applicable to Purchasing on the Request To Award Bid Memorandum: ITEM NO./ DESCRIPTION RESPONSE 16. Number of Bids Solicited 20 17. Number of Bids Received 4 18. Number of Responsive Bids 4 24. Tabulation Attached Yes 30. State Contract No MCT/ mhj BID TABULATION June 27, 2006 Demolition of Elevated Water Tanks I Bid # 06- 123 ERG Enterprises eler Demolition Bayonet Point, FL Romeo, MI lA 1 Job Demolish Elevated Water Storage Tank # 1 To Include the following, as a minimum: $ 34, 550. 00 $ 26, 000. 00 1 EA 100, 000 Gallon Welded Steel Tank 35' Diameter & 22' Height) 6 EA Welded Steel Legs (100' Height w/3 Sections & Lattice Connections) 6 EA Concrete Leg Foundations to 3' Below Finished Grade 1 EA 36" Diameter Riser Pipe to 3' Below Finished Grade I EA Riser Pipe Foundation to 3' Below Finished Grade 1 EA Abandon Existing 12" Cast Iron Influent/Ef luent Pipe 1 EA Abandon Existin 6" Blow-Off Pi e 41..... Demolish Elevated Water Storage Tank #2 To Include the following, as a minimum: $ 36, 850. 00 $ 32, 000. 00 1 EA 100, 000 Gallon Welded Steel Tank 35' Diameter & 20' Height) 4 EA Welded Steel Legs ( 100' Height w/3 Sections & Lattice Connections) 4 EA Concrete Leg Foundations to 3' Below Finished Grade 1 EA 36" Diameter Riser Pipe to 3' Below Finished Grade 1 EA Riser Pipe Foundation to 3' Below Finished Grade 1 EA Abandon Existing 8" Cast Iron Influent/Ef luent Pipe 1 EA Abandon Existin 6" Overflow Pi e TOTAL: $ 71, 400. 00 $ 58,000. 00 Page 1 of 4 BID TABULATION June 27, 2006 Demolition of Elevated Water Tanks Bid #06- 123 ERG Enterprises Iseler Demolition Bayonet Point, FL Romeo, MI IB 1 Job Demolish Elevated Water Storage Tank # 1 Above Ground Structures Only) To Include the following, as a minimum: $ 34, 550.00 $ 22, 000.00 1 EA 100, 000 Gallon Welded Steel Tank 35' Diameter & 22' Height) 6 EA Welded Steel Legs (100' Height w/3 Sections & Lattice Connections) 6 EA Concrete Leg Foundations to Ground Level 1 EA 36" Diameter Riser Pipe to Ground Level I EA Riser Pipe Foundation to Ground Level 2B Job Demolish Elevated Water Storage Tank #2 Above Ground Structures Only) To Include the following, as a minimum: $ 36, 850. 00 $ 28, 000. 00 1 EA 100, 000 Gallon Welded Steel Tank 35' Diameter & 20' Height) 4 EA Welded Steel Legs ( 100' Height w/3 Sections & Lattice Connections) 4 EA Concrete Leg Foundations to Ground Level 1 EA 36" Diameter Riser Pipe to Ground Level 1 EA Riser Pipe Foundation to Ground Level TOTAL: $ 71, 400. 00 $ 50, 000. 00 Containment & Disposal of Materials with Lead Paint 6, 700. 00 6, 700. 00 Perfonnance Period: 90 Days 90 Days Bid Expires: 90 Days 90 Days Payment Tenns: Net 30 Net 60 References: Yes Yes Drug Free: Yes Yes State Contract: No No Qualified Containment Procedures Page 2 of 4 BID TABULATION June 27, 2006 Iill/tlil l, Demolition of Elevated Water Tanks 11111111~ iI''' American Bid #06- 123 Environmental, Inc. Steelsmith Tank Co. Saraland, AL Bethel, MO lA 1 Job Demolish Elevated Water Storage Tank # 1 To Include the following, as a minimum: $ 45, 570. 00 $ 50, 500. 00 1 EA 100, 000 Gallon Welded Steel Tank 35' Diameter & 22' Height) 6 EA Welded Steel Legs (100' Height w/3 Sections & Lattice Connections) 6 EA Concrete Leg Foundations to 3' Below Finished Grade I EA 36" Diameter Riser Pipe to 3' Below Finished Grade I EA Riser Pipe Foundation to 3' Below Finished Grade I EA Abandon Existing 12" Cast Iron Influent/Effluent Pipe 1 EA Abandon Existin 6" Blow-Off Pi e 2A 1 Job Demolish Elevated Water Storage Tank #2 To Include the following, as a minimum: $ 42, 570. 00 $ 40,300.00 1 EA 100, 000 Gallon Welded Steel Tank 35' Diameter & 20' Height) 4 EA Welded Steel Legs ( 100' Height w/3 Sections & Lattice Connections) 4 EA Concrete Leg Foundations to 3' Below Finished Grade I EA 36" Diameter Riser Pipe to 3' Below Finished Grade I EA Riser Pipe Foundation to 3' Below Finished Grade 1 EA Abandon Existing 8" Cast Iron Influent/Ef luent Pipe 1 EA Abandon Existin 6" Overflow Pi e TOTAL: $ 88, 140. 00 $ 90, 800. 00 Page 3 of 4 BID TABULATION qillill j~I" it-, June 27, 2006 Demolition

Download this text file with its original spacing ↓