1111". The funding for construction of this project is authorized under the debt funding methodology
tflPl'" previously approved by City Council through resolution 04-33. If approved, sufficient funding does
exist in account # 401- 5055- 533- 6300, Utilities Fund,Capital Improvement Projects.
Submitted By:
Michael B die, Utilities Operations Manager Date
Reviewed and Concur:
Jo~~ Utilities Director Date
Reviewed and Concur:
O~
CityManager Date
Attachments:
1. Bid No. 06- 123 Tabulation
3
City of Fort Walton Beach
MEMORANDUM
DATE: June 28, 2006
TO: John Hofstad
Utilities Department Director
FROM: Michael C. Tatum ~
Purchasing Director
SUBJECT: Demolition of Elevated Water Tanks
Bid # 06- 123
The referenced bid tabulation is forwarded for your review. In accordance with Volume
2, Chapter 4, Section 4. 01, Paragraph 4. 01. 025 Code of Ordinances and the
Purchasing Policies and Procedures. Please take the necessary action to prepare the
Memorandum for Approval by the City Manager and Council. The bid file is available
for review at the Purchasing Department.
tj~
The following information is furnished for those items applicable to
Purchasing on the
Request To Award Bid Memorandum:
ITEM NO./
DESCRIPTION RESPONSE
16. Number of Bids Solicited 20
17. Number of Bids Received 4
18. Number of Responsive Bids 4
24. Tabulation Attached Yes
30. State Contract No
MCT/ mhj
BID TABULATION
June 27, 2006
Demolition of Elevated Water Tanks
I
Bid # 06- 123
ERG Enterprises eler Demolition
Bayonet Point, FL Romeo, MI
lA 1 Job Demolish Elevated Water Storage Tank # 1
To Include the following, as a minimum: $ 34, 550. 00 $ 26, 000. 00
1 EA 100, 000 Gallon Welded Steel Tank
35' Diameter & 22' Height)
6 EA Welded Steel Legs (100' Height w/3
Sections & Lattice Connections)
6 EA Concrete Leg Foundations to 3'
Below Finished Grade
1 EA 36" Diameter Riser Pipe to 3' Below
Finished Grade
I EA Riser Pipe Foundation to 3' Below
Finished Grade
1 EA Abandon Existing 12" Cast Iron
Influent/Ef luent Pipe
1 EA Abandon Existin 6" Blow-Off Pi e
41.....
Demolish Elevated Water Storage Tank #2
To Include the following, as a minimum: $ 36, 850. 00 $ 32, 000. 00
1 EA 100, 000 Gallon Welded Steel Tank
35' Diameter & 20' Height)
4 EA Welded Steel Legs ( 100' Height w/3
Sections & Lattice Connections)
4 EA Concrete Leg Foundations to 3'
Below Finished Grade
1 EA 36" Diameter Riser Pipe to 3' Below
Finished Grade
1 EA Riser Pipe Foundation to 3' Below
Finished Grade
1 EA Abandon Existing 8" Cast Iron
Influent/Ef luent Pipe
1 EA Abandon Existin 6" Overflow Pi e
TOTAL: $ 71, 400. 00 $ 58,000. 00
Page 1 of 4
BID TABULATION
June 27, 2006
Demolition of Elevated Water Tanks
Bid #06- 123
ERG Enterprises Iseler Demolition
Bayonet Point, FL Romeo, MI
IB 1 Job Demolish Elevated Water Storage Tank # 1
Above Ground Structures Only)
To Include the following, as a minimum: $ 34, 550.00 $ 22, 000.00
1 EA 100, 000 Gallon Welded Steel Tank
35' Diameter & 22' Height)
6 EA Welded Steel Legs (100' Height w/3
Sections & Lattice Connections)
6 EA Concrete Leg Foundations to
Ground Level
1 EA 36" Diameter Riser Pipe to Ground
Level
I EA Riser Pipe Foundation to Ground
Level
2B Job Demolish Elevated Water Storage Tank #2
Above Ground Structures Only)
To Include the following, as a minimum: $ 36, 850. 00 $ 28, 000. 00
1 EA 100, 000 Gallon Welded Steel Tank
35' Diameter & 20' Height)
4 EA Welded Steel Legs ( 100' Height w/3
Sections & Lattice Connections)
4 EA Concrete Leg Foundations to
Ground Level
1 EA 36" Diameter Riser Pipe to Ground
Level
1 EA Riser Pipe Foundation to Ground
Level
TOTAL: $ 71, 400. 00 $ 50, 000. 00
Containment & Disposal of Materials with
Lead Paint 6, 700. 00 6, 700. 00
Perfonnance Period: 90 Days 90 Days
Bid Expires: 90 Days 90 Days
Payment Tenns: Net 30 Net 60
References: Yes Yes
Drug Free: Yes Yes
State Contract: No No
Qualified Containment Procedures
Page 2 of 4
BID TABULATION
June 27, 2006
Iill/tlil l,
Demolition of Elevated Water Tanks
11111111~ iI''' American
Bid #06- 123
Environmental, Inc. Steelsmith Tank Co.
Saraland, AL Bethel, MO
lA 1 Job Demolish Elevated Water Storage Tank # 1
To Include the following, as a minimum: $ 45, 570. 00 $ 50, 500. 00
1 EA 100, 000 Gallon Welded Steel Tank
35' Diameter & 22' Height)
6 EA Welded Steel Legs (100' Height w/3
Sections & Lattice Connections)
6 EA Concrete Leg Foundations to 3'
Below Finished Grade
I EA 36" Diameter Riser Pipe to 3' Below
Finished Grade
I EA Riser Pipe Foundation to 3' Below
Finished Grade
I EA Abandon Existing 12" Cast Iron
Influent/Effluent Pipe
1 EA Abandon Existin 6" Blow-Off Pi e
2A 1 Job Demolish Elevated Water Storage Tank #2
To Include the following, as a minimum: $ 42, 570. 00 $ 40,300.00
1 EA 100, 000 Gallon Welded Steel Tank
35' Diameter & 20' Height)
4 EA Welded Steel Legs ( 100' Height w/3
Sections & Lattice Connections)
4 EA Concrete Leg Foundations to 3'
Below Finished Grade
I EA 36" Diameter Riser Pipe to 3' Below
Finished Grade
I EA Riser Pipe Foundation to 3' Below
Finished Grade
1 EA Abandon Existing 8" Cast Iron
Influent/Ef luent Pipe
1 EA Abandon Existin 6" Overflow Pi e
TOTAL: $ 88, 140. 00 $ 90, 800. 00
Page 3 of 4
BID TABULATION
qillill j~I" it-,
June 27, 2006
Demolition