June 7, 2016

Okaloosa County BOCC — June 7, 2016 — B - 1.11.11 Due Process, Public Participation

B - 1.11.11 Due Process, Public Participation in the June 7, 2016 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the June 7, 2016 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1331). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used May 3, 2016; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
B - 1.11.11 Due Process, Public Participation
Date
June 7, 2016
Publisher
Okaloosa County Board of County Commissioners
Where to find it
1
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

B - 1.11.11 Due Process, Public Participation — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 2.7 KB · 1

Download ↓

B - 1.11.11 Due Process, Public Participation — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 88.1 KB · 1

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

B - 1.11.11 Due Process, Public Participation — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

EXHIBIT B 1.11.11 Development of Regional Impact (DRI). Action: Approval, approval with conditions, or denial of applications for a DRI, or amendment to a previously approved DRI development order. Authorization: Approval by majority vote. Proceedings: The review and approval of DRI applications and any amendments to an approved DRI development order shall be as specified at Section 380.06, Fla. Stat., provided however, that for any amendments to a previously approved DRI development order, there shall be one public hearing before the Planning Commission and one public hearing before the Board of County Commissioners. Nothing herein shall be construed to preclude a DRI application or amendment to a previously approved DRI development order from being heard by the Board of County Commissioners if it believes there are relevant issues that require additional information and analysis prior to taking action. Character of proceeding: Quasi-judicial. Presiding bodies: Planning Commission; Board of County Commissioners. Public Notice: Advertisement in a newspaper of general circulation published at least ten days prior to the date each hearing will be held. A copy of such notice shall be kept available for public inspection during regular business hours at the office of the Department of Growth Management. The notice shall state the time, date, and place for each hearing; the title(s) of the proposed resolution(s); the place(s) where the resolution may be inspected by the public, and; a general statement advising that all interested parties may appear at the meeting and be heard with respect to the proposed resolution(s). Public notice shall also include the mailing of certified, return-receipt letters to all property owners within a 300-foot radius of the property involved, a certified list of said owners to be obtained from the Property Appraiser's office. In addition, a two-foot by three-foot sign with no less than one-inch lettering shall be posted at the property line facing and clearly visible from the adjacent street or for multiple streets a sign facing and clearly visible from all adjacent streets. The required letters and sign(s) shall describe the action being requested; the date, time and location of the public hearing to be held, and; the name and telephone number of both the applicant and the Department of Growth Management. Letters must be mailed no later than 15 days before the date the first public hearing will be held and signs must be posted no later than 15 days before the date the first public hearing will be held. The applicant must provide signed affidavits stating the letters were mailed and the sign(s) were posted as required herein, and must also provide a time-dated photograph of the sign(s) after it is posted on the property.

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — June 7, 2016 — B - 1.11.11 Due Process, Public Participation.” June 7, 2016. B - 1.11.11 Due Process, Public Participation. Crypt of Echoes evidence ID LED-2026-2e667cb9d9d34e549458715574b0ab7a. http://127.0.0.1:58097/evidence/LED-2026-2e667cb9d9d34e549458715574b0ab7a. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, B - 1.11.11 Due Process, Public Participation, meeting materials for June 7, 2016. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=4&ID=11293&MeetingID=1331

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓