coordination with the
Eglin Civil Engineering Squadron regarding construction inspections, testing, schedules, contractor
access, and other items as needed.
3. Prepare Responses to Eglin AFB Design Review Comments: AVCON shall review and prepare
one set of formal responses to each of the design review letters previously provided by Eglin AFB
(fire alarm, fire protection, electrical, mechanical, fire department, structural, architectural,
environmental, and civil).
4. Participate in Coordination Meeting with Owner and Eglin AFB: AVCON shall participate in a
meeting with the Owner and Eglin Air Force Base to discuss outstanding items and project schedule
ptior to the pre-construction meeting with the contractor.
5. Participate in Pre-Construction Conference; Prepare Minutes: AVCON shall coordinate and
participate in a Pre-Construction Conference to present and discuss specific project issues, specific
construction features, operational phasing, special airfield construction limitations, and other
applicable requirements. The work shall include responding to questions related to AVCON design
features.
6. Participate in On-Site Visits to Review Work: AVCON shall participate in periodic site visits
during construction to observe progress of work. Visits shall be intended to enable observations of
the progress to ensure that construction is generally consistent with the design objectives and with
applicable safety and security requirements and to coordinate questions in the field.
Page 3 of 6
SCOPE OF SERVICES — AVCON, INC.
Design, Re-Bid, and Construction Phase Services for Eglin Air Force Base ARFF Development
2
10.
11.
12
13
14
15.
16.
Participate in Weekly Update Meetings: AVCON shall participate in weekly update meetings
conducted by the contractor during construction to coordinate day-to-day issues, address project
concerns, and to review scheduled work.
Provide Monthly Update Report: AVCON shall prepare and submit to County on a monthly basis
three (3) copies of a bound project update report that summarizes the progress of the work and
provides photos to clarify the progress.
Review Contractor Shop Drawings: AVCON shall review shop drawings as submitted by the
Contractor and shall evaluate compliance with respect to contract requirements. An owner-specified
review period (approximately two weeks) shall be specified in the project documents for shop
drawing review and response ftom receipt of the respective shop drawing,
Review and Approve Contractor Pay Applications: AVCON shall review pay requests as
submitted by the Contractor on a monthly basis to review and evaluate the requested values versus
the actual work completed and accepted for the payment period. The task shall include review of the
work completed in conjunction with the Construction Inspector and certification by the Inspector and
the Project Manager that the pay application reflects the work performed and stored materials
accepted. This task includes preparation of the County issued project financial summary spreadsheet.
Coordinate RFIs with Contractor: AVCON shall respond to Contractor Requests for Information
(RFIs) as required to provide clear interpretation of the contract requirements. The work shall include
preparation of Work Directives or other instruction during the construction phase as appropriate to
ensure proper completion in accordance with the contract documents.
Coordinate Utility Improvements with Eglin Air Force Base: AVCON shall coordinate potable
water and sanitary sewer transmission line improvements (provided by Eglin AFB pursuant to project
kick-off meeting on May 17, 2013) between the proposed ARFF Development and the nearest point
of service to ensure that the phasing of the work does not impact the ARFF Development
construction schedule.
Prepare and Coordinate Final Change Order: AVCON shall prepare the final reconciliation
change order justification and paperwork and coordinate with the Contractor and County to execute
this change order.
Coordinate Owner’s Allowance and Associated Work Directive: AVCON shall coordinate with
the owner to define improvements to be paid for by the Owner’s Allowance and prepare a Request
for Proposal to the Contractor for these improvements. AVCON shall evaluate the subsequent
proposal and prepare and coordinate the Work Directive authorizing the identified work.
Coordinate Signage Allowance and Associated Work Directive: AVCON shall coordinate
building and roadside signage improvements with the Owner and prepare a Request for Proposal to
the contractor. AVCON shall evaluate the subsequent proposal and prepare and coordinate the Work
Directive authorizing the identified work.
Coordinate Utility Allowance and Associated Work Directive; AVCON shall coordinate the
utility allowance items with Eglin AFB and the Owner and prepare a Request for Proposal to the
contractor for these items. AVCON shall evaluate the subsequent proposal and prepare and
coordinate the Work Directive authorizing the identified work.
Page 4 of 6
SCOPE OF SERVICES — AVCON, INC.
Design, Re-Bid, and Construction Phase Services for Eglin Air Force Base ARFF Development
17. Prepare County Invoices: AVCON shall prepare a certification cover sheet with a summary of the
work completed, and respond to questions and requests for additional information from the County
regarding each monthly AVCON invoice.
18. Participate in Substantial Completion Inspection: AVCON shall attend a punch-list walk-through
of the construction upon substantial completion to verify completeness of work. The work shall
include an evaluation to determine whether the work items satisfy substantial completion
requirements. This task assumes one trip from Orlando by a Senior Structural Engineer and one trip
by a Senior Mechanical Engineer. The task shall include a review of project close-out requirements
for the Contractor.
19
Administer Punch-List: AVCON shall prepare and monitor a project punch-list to verify final
completion in accordance with contract documents as part of this task. The task shall include a review
of the list with the Contractor to clarify remaining contract requirements.
20. Prepare and Provide As-Built Survey: AVCON shall coordinate, review, and provide an as-built
survey of the completed construction items and confirm that the constructed improvements are
consistent with the Release for Construction documents. AVCON shall also incorporate the as-built
survey into the record drawings.
21. Participate in Final Completion Walk-Thru: AVCON shall attend a final inspection walk-through
of the construction upon completion of the identified punch-list items in order to verify completeness
of work and to determine acceptance of the constructed work. The work shall include an evaluation
to determine whether the work items satisfy final completion requirements and certification of the
completion.
22,
Prepare and Provide Record Drawings/Close-Out Documents: Prepare and provide five (5) sets
of record drawings and five (5) sets of electronic files (in ACAD format) reflecting the installation of
features as constructed on site. AVCON shall assist Okaloosa County with the preparation of the
close-out documentation and shall prepare a close-out package documenting the project. The close
out documentation shall include field visit summaries, testing results, approval and clearance letters,
and general project information to address FAA and FDOT close-out requirements.
Task 5: Construction Inspection Services (Not-to-Exceed)
1, Construction Inspector: AVCON shall provide one (1) Construction Inspector to monitor and track
the progress of construction services performed by others. The following tasks describe the typical
project inspection to be provided by AVCON:
General coordination with Okaloosa County project representatives
Participation in Pre-Construction Conference
On-site monitoring of project progress
Assistance to client as needed
Liaison between Contractor, Engineer, and Client
Coordination and scheduling of material acceptance testing
Inspection of work on-site to verify accordance with contract documents
Notifications of defective work or materials
Review of project schedules
10. Participation in weekly construction progress meetings
11. Review and inspection of erosion control devices
CPN AYMEYNE
Page 5 of 6
SCOPE OF SERVICES — AVCON, INC.
Design, Re-Bid, and Construction Phase Services for Eglin Air Force Base ARFF Development
12, Field verifications of work quantities; validation of pay requests
13. Participation in substantial completion inspection
14. Participation in final completion inspection
15. Maintenance of daily project diary, photo logs, and record drawings
16. Maintenance of records to be submitted to County and FAA
17. Other related services as requested by the County
Task shall assume participation by the Construction Inspector of 1,560 labor-hours (39 weeks with an
average of 40 hours per week).
SECTION C: DELIVERABLES
The following deliverables to the County are anticipated:
Task 2:
Task 3:
Task 4:
Prepare Bid Documents
Three (3) copies of updated Release for Bid Documents
Re-Bid Services
Minutes from Pre-Bid Conference
One (1) copy of Bid Tabulation and Recommendation of Award
Five (5) sets of Conformed Documents
Construction Administration Services
Formal response to Eglin AFB design review comments
Minutes of Pre-Construction Conference
Monthly Update Reports (3 copies per month for 9 months)
Final Reconciliation Change Order (5 copies)
Owner’s Allowance Work Directive
Signage Allowance Work Directive
Utility Allowance Work Directive
Substantial Completion Punch-List
As-Built Survey
Certification of Project Completion
Record Drawings (hard copy and CD with electronic CAD files)
Close-Out Documents (hard copy)
SECTION D: ADDITIONAL SERVICES
Additional services may be added to this contract during the course of work based upon agreed fees. No work
shall be undertaken in accordance with any additional service tasks without the written authorization of the
Owner.
END OF SCOPE
Page 6 of 6
AVCON, INC.
12/4/2014
EXHIBIT B - FEE DERIVATION
DESIGN, RE-BID, AND CONSTRUCTION PHASE SERVICES FOR
EGLIN AIR FORCE BASE ARFF DEVELOPMENT
EGLIN AIR FORCE BASE
con | SENIOR PROJECT | SENIOR MECHANICAL T PROJECT ‘SENIOR GAD
Position: MANAGER STRUCTURAL ENGINEER MANAGER DESIGNER CLERICAL TOTAL
Rate (S!Hour S180 3140 3130 30 345
Hours [Gost Hours Cost Hous | Gost | Hous | Cost | Hours | Cost Hours Gost
1. Perform Flow Test and Analysis a so} a ‘s1.129 va] $1,820 9 30] ol 3a zz $2,040)
2. [Perform Design Calaulations for Fire Pump and Storage Tank 2|___ S360) rr) 35.60) a] si,040 al 39] A so so] $7,000]
3.|Perform Design of Fire Pump and PEMP Building 2| S360] 48 $6,720] a $1,040] 24] $1,820] 9 sa 82|___$10.049)
4, [Pertorm Desian Modifications to Electrical Service and Fire Alam 2I 3360) 18 52.240) Z $260 al____s6aal al 30) zal 53.500]
5, [Perform Design Storage Tank 2l___s360 32 34.420] 4 $520) 3[___ 5480 Hi 30) 4a__ $5,840]
6 Jincomorate Storage Tank and Fire Pump info GW Drawings 4 $720} ao 30] 74] $1,320) 7a]__51.220 0 30) 3al___53,620)
‘Total Design Phase Services: 2|_ 82,160) 744]__ $20,100 30} $6,500] Ba] $6,320) a] 30) 250] 533,140]
Review Bid Documents from June 2013,
4. EB 5380] 4] 5580] 4 $520) o| EI 9 30] 10] $1,440}
2. [incorporate Eglin Dasign Review Comments into Bid Documents 2 $360] 13 51,680] 72| 51,589] 16|__ 81,280} ol $0) 43 54,880
3.[Update Design Drawings al $7204 12 31,880] x2[ $1,580) 46|___51,280) | 30) 44 $5,240]
4 [Undate Technical Specifications A $360} 5] 240] | $720] ol 50] | 30] 74} $1,980
Total Bid Package Sarvice: S| $1,440) 20] $4,200] 30] $3,900] sal $2,560) | 80] oo] $13,520)
AVCON, INC.
4.}Prepare and Coordinate Advertisement | so] a 30] 2] $260] ol 0] o| sq] 2] $260]
‘2 Attend Pre-Bid Conference and Prepare Minutes 4 5720} | 30] al $720] ol 80] | ES 10] $1,500]