Total Outfalls currently
GIS Arc mapped (0 corrected actions issued with corrections following
• 122 Major Outfalls that discharge to surface waters recorded
• 149 Dry Weather Inspections
• Citizen Request for Services - 156 Complaints received and Investigated
• Work Orders addressed - 92 Stormwater related maintenance/construction
• 47 Staff performed In-House Training on Importance of Stormwater Maintenance
• Inspections: 31 Private and 8 County
• 72 Parks per week actively inspected for trash and drainage maintenance / Inspected 27
Parks that have stormwater structures for NPDES.
• 53 - Number of county construction projects including minor maintenance that
implemented correct erosion control methods. all County construction sites will be
inspected by County Inspectors who are FDEP Sedimentation and Erosion Control Certified
• 4,002.5 cubic yards of sediment was removed from channels and basins
• 193 Stormwater ponds under Okaloosa County maintenance
Program Goal
The primary goal of the Stormwater Division is to
• manage
• construct
• maintain
• inspect
• catalogue
existing and planned stormwater systems within Okaloosa County.
This goal is to be accomplished utilizing the Best Management
Practices defined in the County Notice of Intent within the
regulatory framework set forth within the Okaloosa County
NPDES permit and Notice of Intent.
Key Objectives
• Implement a public education program to distribute educational
materials to the community.
• Conduct equivalent outreach activities about the impacts of
stormwater discharges on water bodies and the steps that the
public can take to reduce pollutants in stormwater runoff.
• Comply with State and local public notice requirements when
implementing a public involvement/public participation
program.
Key Objectives
• Develop and maintain a storm sewer system map, showing the
location of all known outfalls
• Regulate illicit discharges
• Erosion and sediment control
• Development plan review, construction inspection and long-
term maintenance of water quality improvements.
• Respond to citizen inquiries
• Develop and implement strategies that include a combination
of structural and/or non-structural best management practices
(BMPs) appropriate for the community.
Performance Measures
Actual Estimate Proposed
Performance Measures
FY15 FY16 FY17
Brochures distributed
900 1,000 1,000
to the General Public.
Public notice meetings 4 4 4
Stormwater outfalls
241 300 300
mapped
Stormwater related
enforcement actions 35 40 40
taken
Stormwater inspections 8 99 99
Illicit discharges
1 10 10
identified
Illicit discharges
0 10 10
eliminated
Inspections conducted 148 122 122
Complaints received 906 1,000 1,000
Performance Measures
Actual Estimate Proposed
Performance Measures
FY15 FY16 FY17
Number of staff trained. 32 40 40
Construction sites operating under
the erosion and sedimentation 75 75 80
control requirements.
Stormwater Management plans
35 35 40
reviewed
Construction site inspections. 125 125 130
County park stormwater systems
53 53 53
maintained
Number of county construction
projects that implement correct 40 35 40
erosion control methods.
Volume (cubic yards) of material
6,109 15,000 15,000
removed from catch basins.
Swale maintenance activities. 478 500 500
Stormwater ponds maintained. 191 193 200
Expenditures
FY14 FY15 FY16 FY17 FY16/FY17 Increase/
Category Actual Actual Approved Proposed +/- Decrease
Personnel
$472,421 $454,713 $638,370 $643,004 $4,634 0.7%
Services
Operating
$260,782 $262,558 $685,479 $596,496 ($88,983) (13.0%)
Expenses
Capital
$0 $184,467 $932,540 $1,608,531 $675,991 72.5%
Outlay
Total $733,204 $901,738 $2,256,389 $2,848,031 $591,642 26.2%
Stormwater Accounts
FY15 FY16 FY17 FY16/FY17 Increase/
Code Category Actual Approved Proposed +/- Decrease
10 Salaries & Wages $355,119 $428,427 $432,259 $3,832 0.9%
Professional
31 $0 $100,000 $175,075 $75,075 75.1%
Services
Communications
41 $1,000 $1,000 $1,200 $200 20.0%
Services
43 Utility Services $14,500 $14,500 $5,000 ($9,500) (65.5%)
Risk Management
45 $9,015 $8,171 $13,664 $5,493 67.2%
Allocation
Repair &
46 $55,016 $51,916 $59,810 $7,894 15.2%
Maintenance
Miscellaneous
49 $12,275 $12,275 $10,460 ($1,815) (14.8%)
Charges
Stormwater Accounts
FY15 FY16 FY17 FY16/FY17 Increase/
Code Category Actual Approved Proposed +/- Decrease
52 Operating Supplies $36,656 $30,860 $33,942 $3,082 10.0%
Road Materials &
53 $223,000 $457,557 $288,035 ($169,522) (37.0%)
Supplies
60 Capital Outlay $1,209,135 $932,540 $1,608,531 $675,991 72.5%
TOTAL $2,063,708 $2,256,389 $2,848,031 $591,642 26.2%
Traffic Division
1st Electric Signal
Installed over a Century Ago
Program Description
The Traffic Engineering/Operations Division’s mission is to
• Administer, manage, maintain and operate the Advanced Traffic
Control System (ATCS),
• Includes the safe and efficient, continuous operation of all signalized
intersections in the County and on State roads.
• A Florida Department of Transportation (FDOT) joint program assists
with the expenses associated with the administration and operations
of the ATCS.
The Traffic Division works closely with the FDOT, TPO, local
governments, contractors, and designers to help manage and provide
within our means the safest system and highest level of service for the
traveling public.
Revenue
• Traffic Division is funded within the County Transportation Trust
Fund. Supporting revenue of the County Transportation Trust
Fund is:
• fuel tax,
• intergovernmental revenue,
• charges for services,
• miscellaneous revenues, and transfers.
• additional funding for the Traffic Division comes from an annual
FDOT joint program.
Major Accomplishments
FY 2015
• Managed traffic signal timing and vehicle detection operations for the following
FDOT construction projects: FDOT US 98 Cody Flyover, SR 123 North Flyover.
• Monitored travel time data of traffic flow through the US 98 Cody flyover
construction project providing valuable information to FDOT’s construction
management team.
• Managed and coordinated relocation between FDOT and Information Technology for
the main north south backbone fiber trunk in the area of the SR 123 construction
project.
• Continued assisting FDOT design teams on the design of traffic signals for the US 98
widening project in Destin, intersection improvements for the SR 189 (Beal) projects
both the resurfacing and intersection improvements for Carmel/Clifford and Mary
Ester Blvd intersections.
• Ensure proper functionality of all components of signalized intersections; maintaining
all communications equipment in both the field and office; and overseeing all
construction projects in the County related to any resurfacing, signal, or utility work.
• Secured a joint participation agreement with FDOT for the funding of the design and
construction of a traffic management center facility.
Program Goals
Traffic Engineering Goals:
Long Range Goal:
• The engineering division will continue to manage the ATCS and signalized
intersections in a direction encouraging enhancement and upgrades of the
existing systems.
Short Range Goals:
• Seek new technologies used in Intelligent Transportation Systems.
• Implement these newer technologies in the ATCS.
• Seek additional video and traffic monitoring capabilities.
• Manage existing timings and adjust as necessary.
• Improve traffic flow along major arterials with emphasis on peak AM and PM
traffic.
• Plan and design for a traffic operations management center.
Program Goals
Traffic Operations Goals:
Long Range Goal:
The operations division will continue providing a high standard of customer service,
and maintenance operations.
Short Range Goals:
• Continue working closely with citizens, contractor & designers to maintain
efficient operations.
• Continue meeting industry standards to maintain a high quality product
• Continue upgrading and integrating newer technologies into the existing ATCS
• Improve operations and reduce maintenance costs at critical intersections
• Protect and locate all underground utilities associated with the system (both
fiber and copper); ensure proper functionality of all components of signalized
intersections; maintain all communications equipment in both the field and
office; and oversee all construction projects in the County related to any
resurfacing, signal, or utility work.
Key Objectives
• Provide timely and courteous assistance to citizens.
• Provide effective and thorough review of all signal design and timing
activities.
• Continue the addition of closed circuit cameras for monitoring only
traffic conditions and operations.
• Continue to evaluate more effective alternatives for traffic signal
maintenance.
• Monitor and assess future needs for Intelligent Transportation System
through use of state of the art technology.
• Operate and maintain continuously 185 traffic control devices, (of
which 131 are signals and the remaining are mostly school zone
beacons with a few intersection beacons), 268 highway lights and
safeguards over 100 miles of underground utilities.
Performance Measures
2000
Preventative
1600 Maintenance
Signal Timing
1200
800 Emergency Issue
400 Equipment Damage
0 Work Orders
FY15 Actual FY16 Original FY 17
Proposed
Program Funded 53% by FDOT
Historical Staffing
5
4
Full-time
3 Administrative
& Support
2