READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — February 3, 2015 — FTA STIP pages 2014 — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

FTA STIP pages 2014 — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Purs o Federal Highway Administration Federal Transit Administration Florida Division Office Region 4 Office 545 John Knox Road, Suite 200 230 Peachtree Street NW, Suite 800 Tallahassee, Florida 32303 Atlanta, Georgia 30303 (850) 553-2200 (404) 865-5600 www.fhwa.dot.gov/div September 30, 2014 Mr. /\rund:f?rnsld Secretary of Florida Department of Transportation 605 Suwannce Street / MS-59 Tallahassee, Florida 32399-04. Subject: Approval of FY 2015-2018 STIP and Statewide Planning Finding The following is in ruponse to the Department’s transmittal of the Fiscal Year (FY) 2014/2015 ~ 2017/2018 Ty provement Programs (TIPs) for Florida's 26 Marmllun Planning Organizations )fofounevww, which mcludeuhe ofq)pmvnl for the MPO TIPs, Florida's FY 2015-2018 S Transp ! STIP), and the of the state planning process, dated ber 16, 20]4 Ourvmmsmcuopomnmd statewide planning pmuss findinss and actions are summarized below: 1. Metropolitan Transportation Planning Processes and TIPs: Based upon our review of the annual “self-certification” jointly developed b eochoftheMPOsandlhe ent and our joint certifi reviews of Ti i Management Areas (TMAs) uring 2014, we dammmnflvzowfms 2017/ 2018 TIPs developed and ad: byencho sZGMPOsm on a continuing, conclude that the content and elements of each of the TIPs g nusf{):‘cmqulmmuofuusc I34 49US.C. 5303, 23 CFR Part 450 (Subpart C) and 49 CFR Part 613 (Subpart C). 2. Statewide Transportation Planning Process and the STIP: 23 US.C. 135(f)(4) and 23 CFR 450.218 require that the Federal Highway Administration / Federal Transit Administration (FHWA / FTA) approval of the STIP include a finding that the process from which the STIP was developed is consistent with the provisions of 23 U.S.C. 134 and 135 and 49 U.S.C. 5303 - 5305. Since 1995, an “annual assessment” of various aspects of the statewide transportation planning pmmhubaunlkcymeofinfomuuonm supporting this FHWA/FTA sunmde planning finding. is 0n.luly30.20l4,a ing was conducted with various bers of your staff to discuss Florida's ion plannil d for your refe and infc a copy of the |;po that that the id p planning process gvunsfiuflsel.boveleqmmnenu Mr. Ananth Prasad 2 September 30, 2013 In summary, our review of the STIP, 'l'fl"l.lndmppommdoamflmm concludes that the FY 2015-2018 STIP substantially meets the process and content 0f 23 U.S.C. 134 and IS.SJ%;JEA: 5303 - 5305, BCFRPm‘SO(Sntnd and 49 CFR Part 613 (Subparts luding the involvement and fiscal constraint. Therefore, on hd:dfofbothqwmAlFl‘A Florida’s FY 2014/15-2017/18 STIP is hereby approved. Wemkfnnwudm i da: md i m!he\‘ mm the local/ mnm;q'vine 3 Flmdu nmpommmheho in further p the various s o p isions in federal law. If you have any questions, do not hesitate to contact Ms. LeeAnn Jacobs at (850) 5532219 or Andres Ramirez ut (404) 865-5611. Sincerely, \ ég . James Christian Yvette G. Taylor Federal Highway Administration Fi Transit Administration Enclosure: Annual Statewide Assessment Report (1ca Hard copy attached, cc: will reccive electronic copy) cc: Ms. Lora Hollingsworth, FDOT (MS-57) Ms. Lisa Saliba, FDOT 21) Mr. James Jobe, FDOT 21) Mr. Jim Wood, 28) Mr. H MPOAC (MS-28B) Mr. Billy 2 , FDOT (District 1) Mr. Greg Evans, = istrict 2] Mr. Tommy Barfield, , FDOT (District 3) Mr. Jim Wolfe, Secretary, (District 4) m.g‘:mbs Seu;hry,l’b(!l:g?:uf) e Pego, Secretary, DOT (Distri Mr. Paul Steinman, , FDOT (District 7) Ms. Diane Gutierrez-Se ,wm.m‘:mm«m PAGE 809 AS-OF DATE: 07/01/2014 I7TEM DISTRICT: 03 FLORIDA DEPARTMENT OF TRANSPORTATION OFFICE OF WORK PROGRAM REPORT NUMBER:422253 1 PROJECT DESCRI! FEDERAL PROJECT NUMBER: <N/A> PHASE: OPI / AGENCY ¢ BY DDR 1,300,046 440,269 DPTO 0 0 w 1,300,046 440,265 450,488 TOTAL <N/A> 2,600,092 . 900,976 TOTAL 422253 1 2,600,092 .538 900,976 TOTAL Project: 2,600,092 880,538 900,976 ITEM NUMBER:422254 DISTRICT: 03 1 PROJRCT DESCRIPTION:OKALOOSA COUNTY SECTION 5307 QPERATING | COUNTY :OKALOOSA FEDERAL PROJECT NUMBER: <N/A> PHASE: OPBRATIONS / 1 TOTAL <N/A> TOTAL 422254 1 0 450,281 450,281 900,562 900,562 900,562 DATE RUN: 10/14/2014 TIME RUN t 07.07.59 MBRSTIP-1 'NON-SIS! TYPE OF WORK:OPERATING POR FPIXED ROUTE 2018 461,922 0 923,844 477,172 0 477,172 954,344 3,129,897 450,281 . TYPE OF WORK:OPERATING FOR FPIXED ROUTE 1,400,000 1,400,000 1,400,000 PAGE 810 FLORIDA DEPARTMENT OF TRANSPORTATION AS-OF DATE: 07/01/2014 OFFICE OF WORK PROGRAM 530t DATE RUN: 10/14/2014 RUN: 07.07.59 MBRSTIP-1 'NON-SI5% TYPE OF WORK:OPERATING POR FIXED ROUTE GREATER THAN ALL 2017 2018 2018 ° o o 600,000 o o o 600,000 o o Q 1,200,000 o o o 1,200,000 o ° o 2,600,000 *NON-SIS* TYPE OF WORK:CAPITAL POR FIXED ROUTE 2,000,000 2,000,000 2,000,000 811 AS-OF DATE: 07/01/2014 DATE RUN: 10/14/2014 TIME RUN: 07.07.59 MBRSTIP-1 *NON-SIS* ITEM NUMBER:422255 2 PROJECT DESCRIPTION:OKALOOSA COUNTY SECTION 5307 CAPITAL DISTRICT:03 COUNTY : TYPE OF WORK:CAPITAL FOR FIXED ROUTE FROJECT LENGTH: .000 LESS GREATER PUND THAN THAN ALL CODE 2018 2018 2016 2017 2018 2018 YEARS : OKALOOSA COUNTY 2,450,000 1,608,000 713,000 790,000 6,556,000 2, 402,500 178,250 197,500 1,639,500 TOTAL <N/A> o 3,062,500 2,010,500 891,250 1, »750 . 195,500 TOTAL 422285 2 ° 3,062,500 2,010,500 891,250 1,243,750 987,500 8,195,500 ITEM NUMBER:422255 3 FROJECT DSCRIPTION:OKALOOSA COUNTY SECTION 5307 OPERATING “NON-SI8% DISTRICT:03 ‘COUNTY : OKALOOSA TYPE OF WORK:OPERATING FOR FIXED ROUTE LENGTH: .000 LESS GREATER FUND THAN THAN ALL 2015 2015 2016 2017 2018 2018 YEARS FEDERAL PROJECT NUMBER: <N/A> PHASE: / FTA 1,300,000 1,475,000 1,325,000 8,425,000 124 0,000 1,475,000 1,325,000 8,425,000 TOTAL <N, 00,000 2,950,000 2,650,000 16,850,000 TOTAL 422288 3 00,000 2,950,000 2,650,000 16,850,000 TOTAL e 4,600,000 3,841,250 3,093,750 27,045,500

Download this text file with its original spacing ↓