READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — January 8, 2013 — Task Order 121-Polyengineering — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 142-Task Order 121-Polyengineering.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
C05-1165-WS
TASK ORDER 121
THIS TASK ORDER IS ISSUED PURSUANT TO THE AGREEMENT FOR CONSULTING SERVICES DATED FEBRUARY 15, 2005, BETWEEN THE COUNTY
OF OKALOOSA COUNTY, FLORIDA AND POLYENGINEERING, INC., WHICH IS INCORPORATED HEREIN BY THIS REFERENCE, WITH RESPECT TO
| Scope of Basic Services for
Camp Rudder Forcemain and Pumping Station
Article A. Purpose:
The purpose of this Task Order is to authorize and direct CONSULTANT (Polyengineering, Inc.) to proceed
with professional engineering services for assisting the Okaloosa County Water and Sewer Department
(COUNTY) to provide coordination, design, permitting and other related professional services for design of a
new 0.100 MGD ADF duplex lift station w/SCADA and approximately 45,000 L.F. of associated forcemain.
The activities that are included are described in “ Article B. Scope of Services.”
Article B. Scope of Services:
The professional consultation services that CONSULTANT agrees to furnish include, but are not limited to,
preliminary studies, utility coordination, meeting preparation/ attendance, field work, design, permitting and
other special services that are applicable to the Camp Rudder Forcemain and Pumping Station (Project), as
requested by COUNTY’s representative as described below:
CONSULTANT will provide and perform professional engineering and related services as authorized by
COUNTY that consist of the appropriate items, as follows:
e Preliminary and Evaluative Services
o Attend meetings as requested by representatives of the COUNTY and provide engineering
assistance, consultation, and opinions
o Perform preliminary design and coordination
o Perform survey coordination with COUNTY survey staff
o Perform modeling of new and existing forcemains to determine operating condition and
impact on and from other pumping stations.
e Engineering Design Services
o Perform forcemain design/ HDD Bore design including tie-in to existing forcemain
o Perform pump station design including electrical and SCADA
o Prepare technical specification package for HDD Contractor
o Perform QA/QC Review of final design
e Permitting
o Prepare FDEP, SWPPP and NPDES permit application packages (fees to be provided by the
COUNTY)
o Prepare FDEP and NPDES clearances and certifications upon completion of project
TASK ORDER 121— OKALOOSA COUNTY WATER AND SEWER SYSTEM
CAMP RUDDER FORCEMAIN AND PUMPING STATION
e Coordination with Other Utilities & Agencies
o Attend onsite meeting with HDD Contractor for quote preparation (Utilizing COUNTY’s
existing “Miscellaneous Subsurface Utility Bores” Contract)
o Coordination with OCIS for SCADA fiber acquisition/ installation
e Engineering Services During Construction
o Provide Engineering services during construction
o Provide onsite project representative services limited to that required to certify project at
completion
o Review of COUNTY prepared As-Built drawings
The following services will be provided by OTHERS:
e Prepare all route and site surveys
e Perform preliminary utility coordination to ensure all known utilities are shown on survey
¢ Geotechnical studies and investigations (if required)
e Prepare Easements
e Prepare AF Form 103
e Prepare As-built drawings
The preceding scope of services is based on the COUNTY utilizing their existing “Miscellaneous Subsurface
Utility Bores” Contract and in-house crews for construction of the pipeline. Therefore, this scope of services
does not include the preparation of any contract documents for bidding purposes or other bid phase services.
Should the current HDD Contractor be unable to accomplish the work and bidding is required, additional
time/costs will be required for development of bidding documents and performing bid-phase services.
Article C. Compensation Provisions:
As compensation for providing the services described within this Task Order, COUNTY shall pay
CONSULTANT in accordance with Article 4 of the February 15, 2005, Agreement, based on the
CONSULTANT’s Per Diem Rates for the actual time worked on the Project, plus Direct Expense incurred for
the Project. The budget ceiling for this Task Order is $127,500.00.
A general breakdown of the proposed budget is included in the following table:
Preliminary and Evaluative Services $ 15,385
Engineering Design Services $ 80,631
Permitting $ 17,158
Coordination with Other Utilities Agencies § 6,241
Engineering Services During Construction §$ 8,085
Total Budget Ceiling $ 127,500
CONSULTANT will keep COUNTY informed of progress so that the budget and/or work effort can be
adjusted if found necessary. CONSULTANT is not obligated to incur costs beyond the indicated budget
ceiling, as may be adjusted, nor is COUNTY obligated to pay CONSULTANT beyond these limits.
TASK ORDER 121— OKALOOSA COUNTY WATER AND SEWER SYSTEM
CAMP RUDDER FORCEMAIN AND PUMPING STATION
Article D. Period of Service:
The schedule for the Project within this Task Order is as follows:
Authorization to Proceed February 19, 2013
Termination of Task Order September 30, 2014
Article E. Authorized Representatives:
The Authorized Representatives designated below are authorized to act with respect to this Task Order.
Communications between the parties shall be through the Authorized Representatives:
For COUNTY For CONSULTANT
Name: Jeff Littrell Name: Roy Petrey, P.E.
Director Vice President - Florida Operations
Address: Suite 300, Lewis Turner Boulevard, Address: P.O. Box 841
Fort Walton Beach, FL 32547 Shalimar, FL 32579
Telephone: (850) 651-7172 Telephone: (850) 609-1100
TASK ORDER 121— OKALOOSA COUNTY WATER AND SEWER SYSTEM
CamP RUDDER FORCEMAIN AND PUMPING STATION
Article F. Recommendation:
Recommended for COUNTY by:
Na es
Seu ical
Name
\ a Or
Title
2/ i2/ 2213
Date l /
Article G. Authorization:
Offered for CONSULTANT by: Accepted for the COUNTY by:
a Ke 2
Name , | Name
VP - Florida Operations
Title Title
Z2-/2-!3
Date Date
KKEKE End KEKE