Machine’s actuator bar at “dead slow” as the Head folds; ♦ Retract the Plugging Head all the way up into the Plugging Machine’s housing; ♦ Close the Tapping Valve; ♦ Depressurize and dewater the Plugging Machine; ♦ Remove the Plugging Machine from the Tapping Valve. Exhibit H 615 Superior Commerce Blvd, Suite 103 Apopka, FL 32703 Phone: 407-880-6786 Fax: 407-880-6781 COMPLETION PLUG INSTALLATION PROCEDURE A. Completion plug will be inspected and its seal and check valve’s integrity verified. B. Completion Plug will be attached to the boring bar of the Tapping Machine and retracted to rear most position up into the Machine’s tapping adapter. Standard measurements will be taken and recorded. C. Completion Plug is installed as follows: ♦ Bolt up the Completion Machine onto the Tapping Valve; ♦ Install pressure equalization hose from the pressurized pipe up to the Tapping Machine’s tapping adapter’s equalization connection; ♦ Crack open the Tapping Valve; ♦ Crack open the equalization hose valves; ♦ Pressure up and inspect all joints for pressure tightness; ♦ Fully open Tapping Valve and the equalization hose valves; ♦ Extend Completion Flange’s locking pins/segments into the Flange’s bore; ♦ Advance the Tapping Machine’s boring bar / Completion Plug down until the Plug touches against the pins/segments; ♦ Verify measurements to prove that the Completion Plug is in “touch position”; ♦ Retract Completion Flange’s locking pins/segments, clearing the Flange’s bore; ♦ Advance the Completion Plug down into the Flange until measurements show that it is in proper “seated position”; ♦ Extend the locking pins/segments into the locking groove of the Completion Plug, thereby locking it into the Completion Flange’s bore; ♦ Verify the integrity of the lock by advancing/retracting the boring bar; ♦ Release the Tapping Machine’s boring bar from the Completion Plug; ♦ Close the equalization hose valves, depressurize the Tapping Machine and verify that all seals are holding properly; ♦ Retract the Tapping Machine’s boring bar; ♦ Remove the Tapping Machine; ♦ Remove the Tapping Valve; ♦ Remove the Completion Plug’s adapter tool holder. D. Once all equipment has been dismounted, EA Tapping Services will install a blind flange onto the outlet (completion) flange of the Line Stop Fitting. E. Equalization apparatus is removed from the pipe and any small equalization nipples are sealed off (completed) and capped. Exhibit I Exhibit J Exhibit K

Download this text file with its original spacing ↓