READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 15, 2013 — CW Roberts Change Order No 2 — reading text
Part 3 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 33-CW Roberts Change Order No 2.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
34” PVC Pipe
Electrical Required: (C) Stub up 12”& leave 12ft. wire & 12ft. car flex
°2-#8THHN 240V 60htz Single Phase
+ 1-#10 ground Hoshikaki 1900 Hoshikaki 1900 R
+ 3/4” PVC conduit 50 amp each 50 amp each
Weight: not crated
+ 1900plus Vending Machine - 2200 Ibs
+ Hoshizaki 1900 Ice Maker - 415 Ibs
+« Hoshizaki 1900 Remote Ice Maker - 570 Ibs
Bag of Ice
125 NE Jones Way a
Lake City, FL 32025
877-371-1555 CE Lea
info@bagofice.com www.bagofice.com
ATTACHMENT "A"
EXHIBIT 4
ATTACHMENT "A"
EXHIBIT 4
ATTACHMENT "A"
EXHIBIT 4 o
oP
EXHIBIT 5
JERRY D. DUNCAN INC. Invoice
5815 LAURELWOOD DRIVE
CRESTVIEW, FL 32539 Date Invoice #
1/11/2013 2758
Bill To
JOHN REYNOLDS
C.W. ROBERTS CONTRACTING, INC.
106 INDUSTRIAL PARK ROAD
FREEPORT, FL 32439
P.O. No. Terms Project
Description Qty Rate Amount
REPAIRS TO IRRIGATION DUE TO NEWLY INSTALLED 0.00 0.00
CURBS AT VPS AIR PORT.
INCLUDES LABOR AND MATERIALS 0.00 0.00
REPLACEMENT OR RESETTING HEADS AS NEEDED 1 50.00 3,550.00
ADDING OR MOVING IRRIGATION HEADS AS NEEDED 29 65.00 1,885.00
REPAIRING DAMAGE TO IRRIGATION LINES, 3/4' TO 1 1/4! 32 85.00 2.720.00
LINES OR SWING PIPE
REPAIRING DAMAGE TO IRRIGATION LINES FROM 1 1/4' 9 165.00 1,485.00
TO2'
REPAIRED DAMAGE TO IRRIGATION LINE 2 1/2" 2 250.00 500.00
REPIPING AREAS WARE PIPE HAD BEEN REMOVED OR 2,175.00 2,175.00
DAMAGED
0.00 0.00
0.00 0.00
Sales Tax 6.00% 0.00
IT IS A PLEASURE SERVING YOU.
Total $12,315.00
PLEASE SEND PAYMENT TO ADDRESS ABOVE
Payments/Credits $0.00
Balance Due $12,315.00
Phone #
850-682-1447
50% split with the contractor = $12,315.00 x 0.50 = $6,157.50.
a
EXHIBIT 6
AVCON, INC.
ENGINEERS & PLANNERS
N:/201 1.050.02/Work Directives/WD#19, Guardrails, 12-5-]2.doc 320 Bayshore Deive, Suite-A
i : Niceville, Florida 32578
Phone: (850) 678-0050
Fax: (850) 678-0040
www.avconinc.com
December 5, 2012
Mr. John Reynolds
C. W. Roberts Contracting, Inc.
160 Industrial Park Road
Freeport, Fl 32439
Reference: Work Directive No. 19: Guardrails
Rehabilitation of Public Parking Facilities
Northwest Florida Regional Airport, Eglin AFB, Florida
Dear Mr. Reynolds:
Pursuant to your email correspondence on Tuesday, December 4, 2012, you are hereby authorized to proceed with
the work specified in Request for Proposal No. 16 attached as Attachment A and specified in the proposal from
ABC Welding and Railing, Inc. attached as Attachment B hereto. The pay item included in Table 1 shall be added
to the contract in the final reconciliation change order which will be coordinated upon completion of the project. In
addition to the pay item included in Table 1, an additional 30 calendar days shall be added to the contract for this
work. The final completion date for the project will be revised from December 6, 2012 to January 5, 2013 in the
final reconciliation change order. If the work authorized above is not constructed, the pay item included in Table 1
and the additional 30 calendar days will not be included in the final reconciliation change order.
Table 1: Additional Work to be Included in the Final Reconciliation Change Order
Item Description Unit | Quantity | Unit Price Amount
Guardrails LS 1 $10,981.95 | $10,981.95
Please ensure that all revisions are depicted on the record drawings maintained in the field. Feel free to contact us
with any questions.
Sincerely,
AVCON, INC.
John Collins, E.1.
Project Engineer
Enclosures
CIVIL & STRUCTURAL ENGINEERING ® AIRPORT & AVIATION CONSULTING ® TRANSPORTATION DESIGN & PLANNING
ATTACHMENT "A"
EXHIBIT 6
AYCON, INC.
ENGINEERS & PLANNERS
320 Bayshore Drive, Suite A
N:/2011.050.02/Rehab of Public Parking Facilities/Request for P1 1 No. 16, 11-6-12.de i ‘
‘ehab of Public Parking Facilities/Request for Proposal No. loc Niceville, Florida 32578
Phone: (850) 678-0050
Fax: (850) 678-0040
www.avconince.com
November 6, 2012
Mr. John Reynolds
C. W. Roberts Contracting, Inc.
160 Industrial Park Road
Freeport, F] 32439
Reference: Request for Proposal No. 16: Guardrails
Rehabilitation of Public Parking Facilities
Northwest Florida Regional Airport, Eglin AFB, Florida
Dear Mr. Reynolds:
Pursuant to our recent coordination, please find attached Attachment A which provides the locations and details for
a 4-ft and 6-ft guardrail. We hereby request a unit price (per linear foot) proposal to provide the following
improvements:
Item Item Description Unit | Quantity
Number
4-FT TALL ALUMINUM GUARDRAIL: Contractor shall furnish and install
a 4-ft tall aluminum guardrail in accordance with the details included in
Attachment A. All posts shall be core-drilled into the existing concrete LF 168
sidewalk and secured with no-shrink concrete. The gate shall be a spring-
closure with latch type and shall be paid for at the linear foot price for the
guardrail. All materials shall be painted aluminum.
6-FT TALL ALUMINUM GUARDRAIL: Contractor shall furnish and install
a 6-ft tall aluminum guardrail in accordance with the details included in
Attachment A. All posts shall be core-drilled into the existing concrete
sidewalk and secured with no-shrink concrete or properly installed in the LF 47
landscaped area. This proposal shall assume there are no utility conflicts at
the locations of the posts. The gate shall be a spring-closure with latch type
and shall be paid for at the linear foot price for the guardrail. All materials
shall be painted aluminum.
The prices provided shall include all materials, labor, and incidentals required to provide a finished product. If you
have any questions, please contact us at 850-678-0050 at your convenience.
Sincerely,
AVCON, INC.
boty. bein
John Collins
Project Engineer
CIVIL & STRUCTURAL ENGINEERING ® AIRPORT & AVIATION CONSULTING ® TRANSPORTATION DESIGN & PLANNING
ATTACHMENT "A"
q /, | 7 | EXHIBIT 6
Busting “F" Cons
NH YNO-NIVHO SNLLSix=
A ion of Sipewalk
susp Brine
Entrance Lane
ae
“N
oO
raed
A
Oo
iL
NEW. GusooRal/Fevce eV IP Lor, Skier 4
We 5-1z
ORS
(
By
FACE oF Celury
19-8 =
ATTACHMENT "A" Sy
EXHIBIT 6 Z
z
j B
22-8 Emstina CurB 2/2
me
Z\S
5
789 BF
ee |
A of
242, ) a
MAn-2ars. ‘~ NEW_ Guarp Railing
Sumanice “VesT BULe
SK Zor 4
H Me SZ
N te SRS
4
TERMINAL Builonsg
°F Sloe Doors
N \ ATTACHMENT "A"
pale BALDWIN BUILDING EXHIBIT 6
|
on] co i
\ f |
f
wr & |
2
Ww SI a) a
: yp ot al
os < 9)
Y oe » a
S aw ig
of
<
" MAM Gare. Of NEW GO # ig FENCING = oe
Bly ma ; '
i i? 1 SK 3 er 4
” ZOO | ab _2 °F a
rs — ee U-5-12
NOTE:
ATTACHMENT "A"
ALL MATERIALS EXHIBIT 6
To Be PAINTED
Aluminum.
Submit Sranpagy
Color CHART
For Arrroval.
CwHite COLORS )
Top Horyz: channel Kx”
Fost: TubeQerys @ 6-0 %
Pickets: 4x %4 e 42"
6-0
4-O0
343%
Berrom Weer: chanel XIX
FINISH GRADE
Oe ee
Coot Alum. Post With Bitumious Pansr J?"
a
ae H 2. 6) w re
,
:
3
hy
,
i
“T ~ GuP
SECTION B~B
ATTACHMENT
ATTACHMENT "A"
EXHIBIT 6
ATTACHMENT "A"
». _EXHIBIT 6
Stee gt
ATTACHMENT "B"
EXHIBIT 6
A BC Welding and Railing, Inc.
Fort Walton Beach, FL32547
(850) 863-5100
November 26, 2012
C.W. Roberts Contracting, Inc
Attn: John Reynolds
Re: RFP No. 16 Guardrails - NW FL Regional Airport
PROPOSAL(REVISED)
ABC Welding & Railing, Inc. proposes the following:
Material and labor to fabricate and install approx. 168’ of 4’ tall aluminum
guardrail according to sketches and picture supplied. Core drilled to existing
concrete and anchored by non- shrink grout. Gate to have self- locking latch
and spring loaded hinges. Powder coat finish — white................ $7,224.00
Material and labor to fabricate and install approx. 47’ of 6’ tall aluminum
guardrail according to sketches and picture supplied. Core drilled to existing
concrete and anchored by non- shrink grout. Gate to have self- locking latch
and spring loaded hinges. Powder coat finish — white............... $2,585.00
Gate hardware........00.cccccccseceeeeeseeseeeeeetesesstteeeteseesssssesb 150.00
Additional cost for hand digging and locating conduit around perimeter of
transformer $ 500.00
Completion: No later than 30 days after purchase order is received and
receipt of material draw.
TOTAL:$10,459.00 x 5% CWR markup = $10,981.95
NOTE: Material draw of $4,481.55 due upon signing contract
NOTE: Because of price fluctuations in material costs, these prices are good for 30 days. An adjustment
may need to be made at the time of contract signing or purchase, based on material price changes. Powder
coat standard color consists of black, white or bronze.
This Quote becomes part of any Subcontract /Contract signed
Quote is subject to change if quantity or any dimension differs from that of the drawings provided at
the time of quote. All concrete and sealing/waterproofing by others. Any testing is to be provided
by others. All structural calculations by others. If structural calculations determine that changes be
made from original bid, a change order will be issued to reflect change in cost. ABC Welding &
Railing, Inc. requires prior written approval for any additional work/change orders that differ from
the original quote. Byincorporating this document with your subcontract/contract, you give ABC
Welding & Railing, Inc. the right to back-charge and personally guarantee that we will receive full
ATTACHMENT "B"
EXHIBIT 6
payment for any alterations that may be required resulting from the approving authority’s oversight
or negligence. In addition, you agree to hold ABC Welding & Railing, Inc. harmless for any such
oversight as a result of any other approving authorities.Any drawings or engineering of any kind will
be done by other. The Architect/Engineer is responsible for the suitability, adequacy and legality of
all aspects of design in the plans and specifications. We will work with the architect/engineer in an
effort to deliver a finished product, which is suitable to the owner.If ABC Welding & Railing Inc. is
requested to handle obtaining the services of a structural engineer for calculations, or obtain the
services of a detailer to provide drawings for approval, there will be an additional price quote
provided at that time covering the cost of their services and payment will be required upon delivery
of drawings. We are a lump sum contractor. This quote is priced based using the insurance
coverage for General Liability, workman’s comp and auto insurance that ABC currently has in
place. If any additional insurance limits are required at signing of contract, there will be an
additional charge for any additional coverage. By issuing a subcontract/contract to ABC Welding &
Railing, Inc. based on this proposal, you agree to incorporate this proposal as a binding attachment
to the subcontract/contract. PAYMENT TERMS: There will be 1.5% interest charged per month on
past due invoices. In the event of default, customer will pay all costs of collection, including but not
limited to attorney fees.
ABC Welding and Railing, Inc. Customer
EXHIBIT 7
AVCON, INC.
ENGINEERS & PLANNERS
320 Bayshore Drive, Suite A
N./2011.050.02/Work Directives/WD#20, outlets and camera relocation, 12-20-12.doc Niceville, Florida 32578
Phone: (850) 678-0050
Fax: (850) 678-0040
www.avconinc com
December 20, 2012
Mr. John Reynolds
C. W. Roberts Contracting, Inc.
160 Industrial Park Road
Freeport, Fl 32439
Reference: Work Directive No. 20: Outlets and Camera Relocation
Rehabilitation of Public Parking Facilities
Northwest Florida Regional Airport, Eglin AFB, Florida
Dear Mr. Reynolds:
Pursuant to our recent coordination, you are hereby authorized to proceed with the work specified in Request for
Proposal No. 17 and 18 attached as Attachments A and B and specified in the proposal from Bill Smith Electric
attached as Attachments C and D hereto. Please note that the Contour Freedom Chair included in Request for
Proposal No. 17 is not authorized. The pay items included in Table 1 shall be added to the contract in the final
reconciliation change order which wil] be coordinated upon completion of the project.
Table 1: Additional Work to be Included in the Final Reconciliation
