CHANGE ORDER NO. 2 .
Rehabilitation of Public Parking Facilities *** RINAL ***
Northwest Florida Regional Airport
CHANGE ORDER NO: Two (2)
CONTRACTOR: C. W. Roberts Contracting, Inc.
CONTRACT DESCRIPTION: Rehabilitation of Public Parking Facilities, Northwest Florida Regional Airport
CONTRACT DATE: February 7, 2012
C.O. ISSUE DATE: March 19, 2013
NO WORK COVERED BY THIS CHANGE ORDER MAY PROCEED UNTIL CONTRACTOR IS IN RECEIPT OF A COPY FULLY EXECUTED BY
THE CONTRACTOR, THE OWNER AND THE ENGINEER. IF CONTRACTOR IS IN AGREEMENT WITH THIS CHANGE, HE SHOULD EXECUTE
ALL COPIES AND RETURN ALL COPIES TO THE ENGINEER WITHIN SEVEN (7) CALENDAR DAYS. THIS CHANGE WILL INCREASE OR
DECREASE THE CONTRACT AMOUNT AND TIME TO COMPLETE BY THE AMOUNT SHOWN BELOW. THE GENERAL, SUPPLEMENTARY
AND OTHER CONDITIONS OF THE CONTRACT SHALL APPLY TO THIS CHANGE ORDER UNLESS EXPRESSLY MODIFIED BY THIS CHANGE.
ORDER
DESCRIPTION OF CHANGES: ADJUSTED CALENDAR DAYS-CONTRACT TIME
1, See Exhibit 1 for Change Order No. 2 justification. ORIGINAL: 280 Days from NTP (3/1/12)
ei TO DATE: 0 Days
2, ADD and REVISE new and existing contract pay items and quantities per Exhibit 2 attached (3 pages).
nies oe ne ne
3. ADD Inner Duct and Weather Proof Boxes, Ice Machine Infrastructure, Guardrails, AOC Outlets and Camera | TOTAL: 318 Days
Relocation, Concrete Flume at Credit Card Canopy, Sign Relocation, Additional Rebar at Credit Card
Canopy, TSA Multiplexer, Ethemet Extender, and Irrigation work items included in Exhibit 3 (5 pages),
Exhibit 4 (10 pages), Exhibit 5 (1 page), Exhibit 6 (12 pages), Exhibit 7 (7 pages), Exhibit 8 (3 pages), and ORIG. COMPL. DATE December 6, 2012
Exhibit 9 (1 page) to the contract.
REVISED DATE/COMPL. January 13, 2013
SOURCE OF FUNDS: FEDERAL AVIATION ADMINISTRATION/FLORIDA DEPT. OF TRANS./OKALOOSA COUNTY
AMOUNT OF THIS CHANGE ORDER ADD DELETE ___X. $ (419,695.59)
PERCENTAGE CHANGE FROM CONTRACT PRICE > (17.9%)
ORIGINAL TOTAL CONTRACT PRICE. $ 2,350,450.00
APPROVED ADDITIONS TO CONTRACT TO DATE By 0.00
APPROVED DELETIONS TO CONTRACT TO DATE AS 7,868.91
REVISED TOTAL CONTRACT PRICE... $ 1,922,885.50
CONTRACTOR ACKNOWLEDGES, BY ITS EXECUTION AND ACCEPTANCE OF THIS CHANGE ORDER, THAT THE ADJUSTMENTS IN
CONTRACT PRICE AND TIME SHOWN HEREON CONSTITUTE FULL AND COMPLETE COMPENSATION AND SATISFACTION FOR ALL
COSTS AND MODIFICATIONS OF PERFORMANCE TIME INCURRED BY THE CONTRACTOR AS A RESULT OF THIS CHANGE ORDER. NO
OTHER CLAIM FOR INCREASED COSTS OF PERFORMANCE OR MODIFICATIONS OF TIME WILL BE GRANTED BY THE OWNER FOR THE
WORK COVERED BY THIS CHANGE ORDER. THE CONTRACTOR HEREBY WAIVES AND RELEASES ANY FURTHER CLAIMS FOR COST OR
TIME AGAINST THE OWNER ARISING FROM OR RELATING TO THE MATTERS OR WORK SET FORTH OR CONTEMPLATED BY THIS
CHANGE ORDER. CONTRACTOR ALSO ACKNOWLEDGES THAT THERE HAS BEEN NO CHANGE IN ITS OPERATIONS WHICH WOULD
REQUIRE A MODIFICATION OF ITS SWORN STATEMENT ON PUBLIC ENTITY CRIMES SUBMITTED WITH ITS BID.
CONTRACTOR’S ACCEPTANCE:
: C. W. Roberts Contracting, Inc.
J-Z0-C0 (3
= | SIGNATURE DATE
A “7 [ Coepuckee Lorwe. 1Z il
r NAME TITLE
RECOMMENDED FOR APPROVAL:
bon Am. LLbbtn a 3-20 -13
PROBST ENGINEE) = IN, INC.—John Collins, P.E. DA’
V7 Le 3ALLL3
PROJECT MAN, iER: 4VCON, INC.—Virgil C. Lewis, P.E. DATE
S-2': (3
RTS DIRE R—Tracy Stage, A.A.E. DATE
Se Pag) /
OWNER: INTERIM AIRPORTS DIRECTOR: OKALOOSA COUNTY DATE
AIRPORTS,
ae 2 f >
es) ee 5 gis)
FEDERAL: FED] ,VIATION ADMINISTRATION DATE
Y/3113
STATE OF FLORIDA: DEPT. OF TRANSPORTATION, DISTRICT 3 DATE
OWNER: OKALOOSA COUNTY BOARD OF COUNTY COMMISSIONERS, DATE
Change Order No. 2 Justification EXHIBIT 1
Rehabilitation of Public Parking Facilities
Northwest Florida Regional Airport
Page 1 of 1
Change Order No. 2 Justification
March 19, 2013
The primary purposes for Change Order No. 2 is to reconcile the contract quantities per the actual final
quantities accepted and measured in the field and to add improvements that provide long-term benefits to
the Northwest Florida Regional Airport. This change order also adds 38 calendar days to the construction
contract due to additional work added to the contract including infrastructure improvements to
accommodate an airport ice machine and guardrails around the VIP parking lot and Baldwin Building.
A significant deduction to the construction contract is included in the Superpave Asphaltic Concrete pay
item. The geotechnical testing performed during the design phase indicated an existing variable depth
asphalt section across the parking lot. The average depth of the underlying asphalt after milling
operations was anticipated to be approximately 1 to 1.5 inches. It was unclear whether the remaining
asphalt material following milling operations would represent a suitable foundation for the proposed
overlay. Therefore, the original parking lot rehabilitation design included a conservative assumption that
full-depth asphalt removal (approximately 3-inch depth) would be required to provide a stable asphalt
pavement as a foundation for the overlay. Following the asphalt milling operations, it was determined
that a majority of the underlying asphalt was adequate to construct the new 1.5-inch asphalt overlay;
therefore, the full-depth asphalt removal and replacement quantity was significantly reduced. This also
reduced the asphalt quantity by 4,212.1 tons as identified in Exhibit 2, resulting in a deduction of
$404,361.60 in asphalt costs.
Change Order No. 2 Justification EXHIBIT 1
Rehabilitation of Public Parking Facilities
Northwest Florida Regional Airport
Page | of 1
Change Order No. 2 Justification
March 19, 2013
The primary purpose for Change Order No. 2 is to reconcile the contract quantities per the actual final
quantities accepted and measured in the field and adds improvements that provide long-term benefits to
the Northwest Florida Regional Airport utilizing unencumbered funds in the current FAA grant for this
project. This change order also adds 38 calendar days to the construction contract due to addition work
which was added to the contract to include infrastructure improvements to accommodate an airport ice
machine and guardrails around the VIP parking lot and Baldwin Building.
A significant deduction to the construction contract is included in the Superpave Asphaltic Concrete pay
item. The geotechnical testing performed during the design phase indicated an existing variable depth
asphalt section across the parking lot. The condition of the underlying asphalt was unknown so the
original parking lot rehabilitation design included a conservative assumption that full-depth asphalt
removal (approximately 3-inch depth) would be required to provide a stable asphalt pavement. Following
the asphalt milling operations during construction, it was identified that the underlying asphalt was
adequate to construct the new 1.5-inch asphalt overlay so the full-depth asphalt removal and replacement
was not required. This reduced the asphalt quantity by 4,212.1 tons as identified in Exhibit 2 which
results in a deduction of $404,361.60 to the construction contract.
Rehabilitation of Public Parking Facilities
Northwest Florida Regional Airport
The following line items shall be added to the contract as follows:
March 19, 2013
EXHIBIT 2
Item No. Item Description Unit iene Unit Price Total Amount
02-1 INNERDUCT AND WEATHER PROOF BOXES Ls 1 $7,900.20 $7,900.20
02-2 ICE MACHINE INFRASTRUCTURE LS 1 $5,193.11 $5,193.11
02-3 GUARDRAILS: LS 1 $10,981.95 $10,981.95
02-4 AOC OUTLETS AND CAMERA RELOCATION Ls 1 $4,845.90 $4,845.90
C02-5 CONCRETE FLUME AT CREDIT CARD CANOPY LS 1 $2,100.00. $2,100.00
€02-6 SIGN RELOCATION Ls 1 $4,515.00 $4,515.00
C02-7 ADDITIONAL REBAR AT CREDIT CARD CANOPY Ls 1 $577.50 $577.50
co2-8 TSA MULTIPLEXER is i $2,283.00 52,283.00
c02-9 ETHERNET EXTENDER LS 1 $441.44 $441.44
02-10 IRRIGATION LS 1 $6,157.50 $6,157.50
CO2-11 ADJUSTMENT TO OWNERS ALLOWANCE NOT BILLED Ls 1 ($217.09) ($217.09)
Total Add: +$44,778.51
The following contract quantities shall be revised as follows:
Previous Revised ‘
ter | _wenpowton [uae] [ Cora | coma | Genet] [ Same | [Pett] Mt] | scam
PAVEMENT
3278 | Te eee aspuatt: | SY 10,000 2372 -7,628 $3.75 $37,500.00 $8,895.00 $28,605.00
REMOVAL
SUPERPAVE
334 | ASPHALTIC TON 3820 | 4607.90 | -4,212.10 $96.00 $442,358.40 404,361.60
CONCRETE
sg; [CURB REMONAUAND' | iF 1,500 1,783 4283 $45.00 $67,500.00 | $80,235.00 4+$12,735.00
Rehabilitation of Public Parking Facilities
Northwest Florida Regional Airport
March 19, 2013
The following line items shall be added to the contract as follows:
EXHIBIT 2
Item No. Item Description Unit Unit Price | | Total Amount
CO2-1 INNERDUCT AND WEATHER PROOF BOXES Ls $7,900.20 $7,900.20
C02-2 ICE MACHINE INFRASTRUCTURE Ls $5,193.11 $5,193.11
€02-3 GUARDRAILS LS $10,981.95 $10,981.95
CO2-4 ‘AOC OUTLETS AND CAMERA RELOCATION Ls $4,845.90 $4,845.90
€02-5 CONCRETE FLUME AT CREDIT CARD CANOPY Ls $2,100.00 $2,100.00
02-6 SIGN RELOCATION Ls $4,515.00 $4,515.00
CO2-7 ADDITIONAL REBAR AT CREDIT CARD CANOPY is $577.50 $577.50
C02-8 TSA MULTIPLEXER Ls $2,283.00 $2,283.00
CO2-9 ETHERNET EXTENDER LS Sad 44 Sad1.44
02-10 IRRIGATION Ls $36,157.50 $6,157.50
C021 ADJUSTMENT TO OWNERS ALLOWANCE NOT BILLED is ($217.09) ($217.09)
Total Add: $544,778.51
The following contract quantities shall be revised as follows:
re Item Description Unit cnr cen eres Previous, total eel Net Change
PAVEMENT
aan | Oe sewarr | SY 10,000 2372 $3.75 $37,500.00 $8,895.00 $28,605.00
REMOVAL
SUPERPAVE
334 | ASPHALTIC TON 8,820 | 4,607.90 $96.00 $846,720.00 | $442,358.40 -404,361.60
CONCRETE
sagt | CURD REM OVAEAND! | our 1,500 1,783 $45.00 $67,500.00 | $80,235.00 +$12,735.00
EXHIBIT 2
522
CONCRETE
SIDEWALK
sy
550
$85.00
$46,750.00
$35,487.50
~$11,262.50
527
DETECTABLE
WARNING SURFACES
EA
$325.00
$5,200.00
$7,475.00
+$2,275.00
TILA
VEHICULAR
PAVEMENT
MARKINGS, WHITE
SF
19,550
$3.00
$58,650.00
$59,634.00
+$934.00
711-B
VEHICULAR
PAVEMENT
MARKINGS, BLUE
SF
400
$10.00
$4,000.00
$4,080.00
+$80.00
TC
HANDICAP PARKING
SYMBOL
EA
21
$150.00
$3,150.00
$3,600.00
+$450.00
993
TUBULAR MARKERS
EA
$95.00
$1,140.00
$1,235.00
+$95.00
WH-1
WHEEL STOP
EA
59
$145.00
$8,555.00
$10,440.00
+$1,885.00
SP-9-
EVALUATION OF
CODE COMPLIANCE
FOR AIRPORT
ENTRANCE SIGN
Ls
$15,000.00
$15,000.00
$0.00
-$15,000.00
SP-9-
DEMOLITION OF
EXISTING SIGN
STRUCTURE,
FOUNDATION, AND
ELECTRICAL
Ls
$9,500.00
$9,500.00
$0.00
$9,500.00
SP-9-
INSTALLATION OF
ENTRANCE SIGN
STRUCTURE,
FOUNDATION AND.
ELECTRICAL
Ls
$27,500.00
$27,500.00
$0.00
$27,500.00
col-
P-
120-2
COMPLETE
CONCRETE REMOVAL
sy
163
$55.00
$8,965.00
$14,520.00
+$5,555.00
col-
200
LIMEROCK BASE
COURSE (8°)
sy
1,000
$12.00
$12,000
$16,236
+$4,236.00
col-
520-1
TYPE F CONCRETE
CURB AND GUTTER
LF
$26.00
$6,760.00
$7,540.00
+$780.00
EXHIBIT 2
COI- | CONCRETE RIBBON
520-2 | CURB LF 160 320 $23.00 $3,680.00 $7,360.00 +$3,680.00
col. SODDING,
‘9g1_ | ARGENTINE BAHIA sy 300 0 $3.00 $900.00 $0.00 -$900.00
WITH 4” TOPSOIL
col-
BL-| | BOLLARD COVER EA 2 0 $50.00 $100.00 $0.00 -$100.00
Total Deduct: $464,474.10
Net Deduct for Change Order No. ($419,695.59)
EXHIBIT 3
AVCON, INC.
ENGINEERS & PLANNERS
N:/2011.050.02/Work Directives/WD#16, Monitoring wells, KVM, AOC Support Equipment, 10-29-12.doc
October 29, 2012
Mr. John Reynolds
C. W. Roberts Contracting, Inc.
160 Industrial Park Road
Freeport, Fl 32439
320 Bayshore Drive, Suite A
Niceville, Florida 32578
Phone: (850) 678-0050
Fax: (850) 678-0040
www.ayconinc.com
Reference: Work Directive No. 16: Fill Groundwater Monitoring Wells, KVM, AOC Support
Equipment, TSA Multiplexer
Rehabilitation of Public Parking Facilities
Northwest Florida Regional Airport, Eglin AFB, Florida
Dear Mr. Reynolds:
Pursuant to our recent coordination and Request for Proposal No 11, 12, and 14, you are hereby authorized to
proceed with the work included in Tables 1 and 2 below. The work