READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2023-08 FDOT Utility Work Agreement-Brooks Bridge Replacement — reading text
Part 1 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-41184-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
RESOLUTION 2023-8
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FORT WALTON
BEACH, FLORIDA, CONFIRMING AUTHORIZATION TO COLLECT $916,345.24 FROM
THE FLORIDA DEPARTMENT OF TRANSPORTATION TO THE UTILITY FUND AS
REIMBURSEMENT TO COMPLETE UTILITY WORK FOR FPID NO. 415474-2;
PROVIDING FOR TRANSMITTAL OF THE RESOLUTION; AND PROVIDING FOR AN
EFFECTIVE DATE
WHEREAS, the State of Florida Department of Transportation (FDOT) proposes to
construct or improve State Road No. 30 (US 98), Financial Project No. 415474-2, in Okaloosa
County; and
WHEREAS, as a part of previous subordination of City utility interests to the FDOT as
apart of City of Fort Walton Beach Resolution 2020-4 and 2022-10; and
WHEREAS, for FDOT to proceed with Project No. 415474-2, and to adjust the City
utilities in the right-of-way, it is necessary for the City of Fort Walton Beach to execute and
deliver to FDOT the agreement identified as Utility Work Agreement (FDOT Participating in
Expense); and
WHEREAS, FDOT has estimated the reimbursable cost for the work to modify the
City’s utilities to be $916,345.24 based on the proposal from Superior Construction Company
Southeast, LLC dated March 31, 2023.
NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE
CITY OF FORT WALTON BEACH:
Section 1. City of Fort Walton Beach Authorization and Direction
The City Council of the City of Fort Walton Beach, Florida authorizes the Mayor to
execute and deliver to FDOT the Utility Work Agreement (FDOT Participating in Expense)
(FPID No. 415474-2) for relocation of City utilities in FDOT right-of-way,
Section 2. Transmittal of Resolution
Upon City Council approval of this Resolution, the adopted Resolution will be forwarded
to the FDOT for consideration.
Section 3. Effective Date
This Resolution shall become effective upon adoption by City Council and signature of
the Mayor.
RESOLUTION 2023-8
Adopted: Maus ie! 5 BO da md
Attest:
DocuSign Envelope ID: 13568854-D02E-4D60-A472-FA11EDE67AC6
Florida Department of Transportation
RON DESANTIS 605 Suwarnee Street JARED W. PERDUE, P.E.
GOVERNOR Tallahassee, FL 32399-0450 SECRETARY
06/02/2023 | 10:47 AM EDT
Mr. Daniel Payne, P.E.
CITY OF FORT WALTON BEACH
107 Miracle Strip Parkway SW
Fort Walton Beach, FL 32548
Subject: Fin. Proj. No.: 415474-2-56-02
FAP No.: N/A
County: Okaloosa
Description: S.R. 30 (U.S. 98) Brooks Bridge Replacement (Design Build
Project)
Contract No.: ASW58
Parcel No(s).: 100.7, 105.4CS, 107.3R, 119.2 and 122.2
Dear Mr. Payne:
The enclosed Reimbursable Utility Work Agreement in the amount of $916,345.24 has been approved by
the Department for Parcel Numbers 100.7, 105.4CS, 107.3R, 119.2 and 122.2 where you subordinated
your easements. You may consider this your authorization to proceed with the work under the direction
of the Project Manager. Your company is required to contact the Project Manager, Mr. Evan Lawrence at
(352) 258-2288, 48 hours prior to beginning this work.
After completing the relocation of your facilities, please forward your invoice to this office for further
handling with the Department. If we can provide any assistance, please advise.
Sincerely,
DocuSigned by:
Katey Oynore
2BBF93B9312842C...
Kathy Ozmore
ASSISTANT AREA UTILITY MANAGER FOR THE
FLORIDA DEPARTMENT OF TRANSPORTATION
DISTRICT THREE
ce: Jenee Floyd, Tracy Walls & Beckie Crawford (FDOT-Dist. Finance Dept.)
Jonathan Harris (FDOT-District Utility Administrator)
Eric Saggars, P.E. (HNTB-Project Manager)
Evan Lawrence (Superior-Project Manager)
Matt Durshimer, P.E. (WSP-Project Manager)
Glenn Peterson, P.E. (Eisman & Russo-FDOT CED)
Colby Brown, P.E. (GPI-Utility Coordination Manager)
Hector Castro, P.-E. (VIA Consulting-FDOT Utility CED
Chris Davis, PE. (WSP-Engineer of Record)
Improve Safety, Enhance Mobility, Inspire Innovation
www.fdot.gov
DocuSign Envelope ID: 13568854-D02E-4D60-A472-FA11EDE67AC6
Page 2
Ian Lindsay (Superior-Construction Project Manager)
File 415474-2-56-02
DocuSign Envelope ID: 13568854-D02E-4D60-A472-F A1 1EDE67AC6
To: KATHY.OZMORE@ATKINSGLOBAL.COM
FLORIDA DEPARTMENT OF TRANSPORTATION
FUNDS APPROVAL
ASW58
5/8/2023
CONTRACT INFORMATION
_ ASW5E
_ AE - UTILITIES RELOCATION (UTIL RELOC)
_R-RAILROAD/UTILITIES AGREEMENT
/ CITY OF FORT WALTON BEACH
_ F596000323001
_ 05/09/2023
_ 05/08/2027
“ct = $916,345.24
_ Subordinated easements and have to relocate their facilitiesto avoid conflicts.
FUNDS APPROVAL INFORMATION
FUNDS APPROVED/REVIEWED FOR ROBIN M. NAITOVE, CPA, COMPTROLLER ON 5/8/2023
Actio Original Original
APPROVED APPROVED
55033020352 55033020352
AE AD
139900 139900
$166,345.24 $750,000.00
41547425602 41547425602
216 216
2023 2023
55150200 55150200
| [088799/23 088799/23
0001 0001
00 01
__ [0001/04 0002/04
Total Amount: $916,345.24
Page1 of 1
DocuSign Envelope ID: 13568854-D02E-4D60-A472-FA11EDE67AC6
RESOLUTION 2023-8
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FORT WALTON
BEACH, FLORIDA, CONFIRMING AUTHORIZATION TO COLLECT $916,345.24 FROM
THE FLORIDA DEPARTMENT OF TRANSPORTATION TO THE UTILITY FUND AS
REIMBURSEMENT TO COMPLETE UTILITY WORK FOR FPID NO. 415474-2;
PROVIDING FOR TRANSMITTAL OF THE RESOLUTION; AND PROVIDING FOR AN
EFFECTIVE DATE
WHEREAS, the State of Florida Department of Transportation (FDOT) proposes to
construct or improve State Road No. 30 (US 98), Financial Project No. 415474-2, in Okaloosa
County; and
WHEREAS, as a part of previous subordination of City utility interests to the FDOT as
apart of City of Fort Walton Beach Resolution 2020-4 and 2022-10: and
WHEREAS, for FDOT to proceed with Project No, 415474-2, and to adjust the City
utilities in the right-of-way, it is necessary for the City of Fort Walton Beach to execute and
deliver to FDOT the agreement identified as Utility Work Agreement (FDOT Participating in
Expense); and
WHEREAS, FDOT has estimated the reimbursable cost for the work to modify the
City’s utilities to be $916,345.24 based on the proposal from Superior Construction Company
Southeast, LLC dated March 31, 2023.
NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE
CITY OF FORT WALTON BEACH:
Section 1. City of Fort Walton Beach Authorization and Direction
The City Council of the City of Fort Walton Beach, Florida authorizes the Mayor to
execute and deliver to FDOT the Utility Work Agreement (FDOT Participating in Expense)
(FPID No. 415474-2) for relocation of City utilities in FDOT right-of-way.
Section 2. Transmittal of Resolution
Upon City Council approval of this Resolution, the adopted Resolution will be forwarded
to the FDOT for consideration.
Section 3. Effective Date
This Resolution shall become effective upon adoption by City Council and signature of
the Mayor.
DocuSign Envelope ID: 13568854-D02E-4D60-A472-FA11EDE67AC6
RESOLUTION 2023-8
AteSt
JF&
ao —_ LID Ca. st aga
Kim M Barnes, City Clerk
DocuSign Envelope ID: 13568854-D02E-4D60-A472-FA11EDE67AC6
STATE OF FLOSS DEPARTMENT OF TR AMSEC TA TIC Form No 740-0400
UTILITY WORK AGREEMENT UTILITIES
(FOOT PARTICIPATING IN EXPENSE)
10/04
Financial Project (D: 415474-2-56-02 Federal Project (D: N/A
County: Okaloosa State Road No.: 30
District Document No:
Utility Agency/Owner (UAO}: CITY OF FORT WALTON BEACH ASW58
06/02/2023 | 10:47 AM EDT
THIS AGREEMENT, entered into this day of _ year of . by and between the STATE
OF FLORIDA DEPARTMENT OF TRANSPORTATION, hereinafter referred to as the "FDOT," and CITY OF FORT
WALTON BEACH, hereinafter referred to as the "UAQ":
WITNESSETH:
WHEREAS, the UAO owns or desires to install certain utility facilities which are located on the public road or
publicly owned rail corridor identified below, hereinafter referred to as the “Facilities,” (said term shall be deemed to
include utility facilities as the same may be relocated, adjusted, or placed out of service): and
WHEREAS, the FDOT, is currently engaging in a project which involves constructing, reconstructing, or
otherwise changing a public road and other improvements located on a public road or publicly owned rail corridor
identified as SR. 30 (US 98) Brooks Bridge Replacement, State Road No.30, hereinafter referred to as the "Project".
and
WHEREAS, the Project requires the location (vertically and/or horizontally), protection, relocation, installation,
adjustment, or removal of the Facilities, or some combination thereof, hereinafter referred to as "Utility Work". and
WHEREAS, the UAO. in accordance with and subject to the limitations of the terms and conditions of this
Agreement, is entitled to be reimbursed for some portion or all of the Utility Work: and
WHEREAS, the FDOT and the UAO desire to enter into an agreement which establishes the terms and
conditions applicable to the Utility Work;
NOW, THEREFORE, in consideration of the premises and the mutual covenants contained herein, the FDOT
and the UAO hereby agree as follows:
i. Performance of Utility Work
a. The UAO shall perform the Utility Work in accordance with the utility relocation schedule attached
hereto as Exhibit A and by this reference made a part hereof (the “Schedule"), the plans and
specifications for the Utility Work which have been previously approved by the FDOT (the "plans’), said
Plans being incorporated herein and made a part hereof by this reference, and the detailed cost
breakdown for the Utility Work (the “estimate”) previously prepared. Ifthe Schedule, the Plans, and the
Estimate have not been prepared as of the date of the execution of this Agreement, then the Utility
Work shall be performed in accordance with the Plans, the Schedule, and the Estimate that are
hereafter prepared in compliance with the notice previously sent to the UAO which established the
terms and conditions under which those documents are to be prepared. The FDOT’s approval of the
Plans shall not be deemed to be an adoption of the Plans by the FDOT nor a substitution for the proper
exercise of engineering judgment and the UAQ shall at all times remain responsible for any errors or
omissions in the Plans. The Utility Work shall include all Facilities located on the Project and neither the
failure of the UAO to include all of the Facilities in the Schedule nor the Plans nor the failure of the
FDOT to identify this omission during its review of the Plans shall relieve the UAO of the obligation to
make those Facilities part of the Utility Work. Time shall be of the essence in complying with the total
time shown by the Schedule for the Utility Work as well as any and all interim time frames specified
therein. The Utility Work shall be performed in a manner and using such methods so as to not cause a
delay to the FDOT or its contractors in the prosecution of the Project. The UAO shall be responsible for
all costs incurred as a result of any delay to the FDOT or its contractors caused by errors or omissions
in the Plans, Schedule, or Estimate (including location of the Facilities and the proper inclusion of all
Page 1 of 10
DocuSign Envelope ID: 13568854-D02E-4D60-A472-FA11EDE67AC6
STATE GF FLORIS DEPARTMENT OF TRANGDOR TATION Form No. 740-010-54
UTILITY WORK AGREEMENT UTILITIES
(FDOT PARTICIPATING IN EXPENSE)
Facilities as part of the Utility Work as stated above), failure to perform the Utility Work in accordance
with the Plans and Schedule; or failure of the UAO to comply with any other obligation under this
Agreement or under the law.
All Utility Work shail be performed by the UAO’s own forces or its contractor. The UAO shall be
responsible for obtaining any and all permits that may be necessary to perform the Utility Work. The
FDOT’s Engineer (as that term is defined by the FDOT’s Standard Specifications for Road and Bridge
Construction) has full authority over the Project and the UAO shail be responsible for coordinating and
cooperating with the FDOT’s Engineer. In so doing, the UAO shall make such adjustments and
changes in the Plans and Schedule as the FDOT’s engineer shall determine are necessary for the
prosecution of
