READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 17, 2015 — Oka FWC FY 2015-16 Artificial Reef Const Grant App DRAFT (1) — reading text
Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Oka FWC FY 2015-16 Artificial Reef Const Grant App DRAFT (1) — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Planning and Management
13. A project timeline and construction schedule................................... (required documentation)
14. Number of staff and percentage of time available to undertake administrative and field
aspects of project, including subsequent monitoring and assessment........... (up to five points)
15. A written artificial reef monitoring and assessment plan, if available.............. (up to five points)
16. A five year local artificial reef management plan which shows linkage with the proposed
PIOJECt; if aVAIABIE e s o s ansnmsmins s vo 5.0 565 e TGRS Dses Sebasnnime (up to five points)
17. A demonstration of involvement with a marine advisory board with input on artificial reef
issues, if available. Include a listing of marine advisory board members, and a copy of the
most recent meeting minutes regarding the proposed project............................ (two points)
18. One complete copy of each active ACOE and DEP permit with accompanying permit
conditions applicable to the project.................ocooo (permit requirement)
Local Demand and Public Access
19. A demonstration of public support for the proposed artificial reef project, based upon
written letters or resolutions of support less than six months old.................. (up to five points)
20. The presence of at least one navigable inlet access point within 20 nautical miles of the
project site (list the numberof).............. (three points)
Material Transport and Ownership
21. A plan to address logistics, coordination, staging area availability, material location, and
material transport and handling..............coooiiii (up to five points)
22. Assurance of the availability of reef material for the proposed project, with an itemized list
describing the materials proposed to be deployed...........ccccoeviiiiiiiiic (three points)
23. Proof of ownership. For all proposed reef materials, indicate whether the reef material has
already been purchased or donated (including letter(s) of verification).......(permit requirement)
Project Practicality
24. An approximate estimate of handling and transportation cost per ton for secondary use
materials, and/or purchase, handling, and transportation cost per unit for pre-fabricated
materials. Discuss the extent to which the project is physically and economically feasible
based upon the project description and the requested project funding........... (up to five points)
25. The percentage financial match of the project. Although providing cash match funds is not
required, the commitment to provide funds to help construct the proposed artificial reef will
be ranked in proportion to the percentage match of the project................... (up to four points)
FWC use
only
SO NN N NG SO SURE U SUR <UD < IO~ (- N - Y
R
v 4
LI
LI
LI
L]
EEE
L[
LI
LI
LI
L]
LI
L]
L[ [ B
L
Ll
LI [
L
FWC Form AR01 (1/14) Page 3 of 4
Construction Grant Application
26.
Non-profit Eligibility Verification
27.
28.
Attached
The applicant's total artificial reef construction/monitoring budget (excluding funds
requested from this grant) for the current calendar year including a description and
amounts of additional funding by funding source........................... (information only, no points)
Documentation of 501(c)(3) tax status from the Internal Revenue Service.(Statute requirement)
Documentation of the corporation's By-laws and/or Articles of Incorporation which include
artificial reef monitoring and/or development as an objective................... (Statute requirement)
€4 «Q K
Procurement of Commodities or Contractual Services Verification
29.
Documentation of the intended means which commodities or contractual services will be
procured, pursuant to the requirements of Section 287.057, Florida Statutes. For
Agreements in the amount of $35,000 or less, grantees will be required to obtain a
minimum of two written quotes for any subcontracts. For Agreements in excess of
$35,000, grantees will be required to publicly advertise and send bid specifications to a
minimum of five potential subcontractors. For any Agreement requesting the use a sole
source vendor, provide clear justification (in the response to this item) for Commission
review and approval .......ooiir e, (Statute requirement)
Project Funding Limits
30.
For projects requesting more than the $60,000 funding limit, provide written justification in
compliance with Chapter 68E-9.008, Florida Administrative Code, for Commission review
AN APPIOVAL ...t e e (Statute requirement)
if
THE FOLLOWING ADDITIONAL ITEMS WILL BE DETERMINED BY FWCC:
Overall quality of application preparation and accuracy............................................ (up to four points)
31.
32.
33.
34.
35.
36.
37.
38.
The project is an innovative project or designed to provide future monitoring
T ] (=T ] = | (up to five points)
Estimated percent coverage of natural hardbottom in the multi-county area. More points allotted
to lesser COVETraQe s sommn sup oo das S35 SUMRERDTRTT B SN0 S5 555 155 S0000 Sl dnmtre famte e ssinss s smenne (up to eight points)
Number of recreational boats 16 feet long or longer registered in the affected
COUNY i & smmmmmans sons s 25 e S Seauprorst SHHED 356 250 58 00: SREEAET: TR 37 S04 505 (s (up to five points)
Number of one-year resident and nonresident recreational fishing license holders in the affected
oo T ] e —— (up to five points)
Number of charter/head boats in the affected county....................ooooin (up to five points)
The applicant is located in an economically depressed rural coastal county.................. (five points)
First time participation in the program by the applicant.............................. . (five points)
The applicant’s historic ability to ensure timely project completion, and compliance with grant
agreement terms and conditions based upon the most recent grant agreement
I O MANCE . .. ..t e e (up to five points)
FWC use only
L]
EEN
RN
LI
LU
L]
L]
[]
'D ID 'D ’D ’D [
i
FWC Form ARO1 (1/14)
Page 4 of 4
Construction Grant Application