READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 09-09-2009 special — reading text

Part 8 of 22. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-24078-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

9/3/ 2009 1: 41 PM U: 1Finance \Fee Schedule\ 2009, Septemher\ 9 -9 -09 Fee Schedule - 27- City of Fort Walton Beach Comprehensive Fee Schedule FIRE SERVICES Dispatch Per dispatch call 80. 00 No Change Res. 2006 -30 12/ 12/06 Inspection Fees Less than 4, 000 sq ft - $ 25. 00 4, 001 to 8, 000 sq ft - $ 30. 00 Commercial, Industrial, Public Assembly, No Change Res 07 -15 09/ 05/07 Home Occupation, Private Schools 8, 001 to 12, 000 sq ft - $ 35. 00 Over 12, 001 sq ft - $ 40. 00 plus 1. 00 per 1, 000 sq ft Under 12 units - $ 25. 00 Hotel, Motel Condo, Apartments, Adult 12 - 50 units - $ 30. 00 Congregate Living, Other Residential 51 - 100 units - $ 35. 00 No Change Res 07 -15 09/ 05/07 Facilities Over 101 units - $ 35. 00 plus 0. 30 per unit First Reinspection No Charge No Change Res 2003 -14 6/ 24/ 03 Additional Reinspection 1/ 2 inspection fee No Change Res 2003 -14 6/ 24/ 03 Permit/ License Fees Demolition of Structure 25. 00 No Change Res 2003 -14 6/ 24/ 03 Controlled Burn Permit 50. 00 No Change Res 2003 -14 6/ 24/ 03 Carnival Permit 50. 00 No Change Res 2003 -14 6/ 24/03 Temporary Construction Trailers 50. 00 No Change Res 07 -15 09/ 05/07 Illegal Burn 100. 00 per hour No Change Res 2003 -14 6/ 24/ 03 Hydrant Flow Test 25. 00 No Change Res 07 -15 09/05/ 07 Pre -Inspection (when requested prior to 20. 00 No Change Res 2003- 14 6/ 24103 issuing permit/ license) Fire Prevention Programs Outside City, Inside County 35. 00 No Change Res 07 -15 09/ 05/07 Outside County 35. 00 plus cost incurred No Change Res 07 -15 09/ 05/07 Plans Review Plans Review 0. 03 per sq ft No Change Res 2003 -14 6/ 24/ 03 First Revision No Charge No Change Res 2003 -14 6/24/ 03 Subsequent Revisions 1/ 2 permit fee No Change Res 2003 -14 6/ 24/ 03 Sprinkler System Review Minimurn Fee, up to 25 heads 50. 00 No Change Res 07 -15 09/05/ 07 Each Additional Head 0. 35 No Change Res 2004 -30 10/ 26/ 04 Standpipe System Review Each Raiser 35. 00 No Change Res 07 -15 09/ 05/07 Fire Pump 50. 00 No Change Res 2003 -14 6124/ 03 Fixed fire suppression systems, Halon, 50. 00 No Change Res 07 -15 09/ 05/ 07 wet /dry chemical systems, extinguishers, etc. Fire Detection and Annunciation Systems 50. 00 No Change Res 07 -15 09/ 05/07 Underground Fire Protection Fee 50. 00 No Change Res 07 -15 09/ 05/07 Flammable Liquid Tanks Up to 4, 000 gallons 125. 00 No Change Res 07 -15 09/ 05/ 07 4, 000 gallons or more 150. 00 No Change Res 2003 -14 6/ 24/03 Miscellaneous False Alarm Activation 0. 00 No Change Ord 1787 01/ 13/ 09 Second False Activation 50. 00 No Change Ord 1787 01/ 13/ 09 Third False Activation 100. 00 No Change Ord 1787 01/ 13/ 09 Fourth and Subsequent False Activations Up to $ 500 each, No Change Ord 1787 01/ 13/ 09 at the discretion of the Fire Chief False Alarm Activation without proper notice 100. 00 No Change Ord 1787 01/ 13/ 09 of maintenance or testing Second False Activation without proper 200. 00 No Change Ord 1787 01/ 13/ 09 notice Third False Activation without proper notice 300. 00 No Change Ord 1787 01/ 13/ 09 Fourth and Subsequent False Activations Up to $500 each, No Change Ord 1787 01/ 13/ 09 without proper notice at the discretion of the Fire Chief UARnance\ Fee Schedule \2009, September\ 9- 9. 09 Fee Schedule - 8/ 3112009 10: 19 AM 28- City of Fort Walton Beach Comprehensive Fee Schedule iG s 6k' •, EMIRS .fi= 3nx,+• 3F, 9 4ayS^.) a f 3`: kY ^ fb E k} 8.: S f$ K i u fi . a; r tY g. y gP Use of Drill Tower 100. 00 No Change Res. 2006 -30 12/ 12/ 06 Daily Fee 100. 00 No Change Res. 2006 -30 12/ 12/ 06 Drafting Pit ( per day) Minimum Standards Class 75. 00 per person No Change Res. 2006 -30 12/ 12/06 50. 00 per person No Change Res. 2006 -30 12/ 12/06 40 Hour Training Class 250. 00 No Change Res 2000 -20 10/ 1/ 200 Yearly User Fee Cost Recovery, Supplies Replacement 1 - 1/ 2" Nozzle 650. 00 No Change Res. 2006 -30 12/ 12/06 1 - 3/ 4" Hose 190. 00 No Change Res. 2006 -30 12/ 12/06 2 -1/ 2" Gate Valve 261. 00

Download this text file with its original spacing ↓