READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 09-09-2009 special — reading text

Part 6 of 22. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-24078-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

50% of building fee (Sec. 3. 02. 06) No Change Res 2009 -35 09109109 Plan check fee lf4ew. eor stftlf;tiof4- G-4y Threshold building transmittal /processing 206. 00 No Change Res 2008 -15 04108! 08 fee /ICC 113. 50 No Change Res 2008 -15 04/ 08/ 08 Moving Fee 56. 50 plus $9. 00 per 2, 000 sq ft above No Change Res 2008 -15 04/ 08/ 08 Demolition Fee 20, 000 sq ft or fraction thereof First - $ 36. 00 Re- Inspection" Fee Second - $ 36. 00 No Change Res 2008 -15 04/ 08/ 08 Third and more - $ 110. 00 Reinspection means the building inspector returns to the job site to review corrected work denied on the previous inspection for the same violation. 8/8/ 31/31/ 20092009 10:10: 1919 AMAM UAFinanceTee UAFinanceTee Schedule12009,Schedule12009, September\September\ 99- - 99- - 0909 FeeFee ScheduleSchedule - - 25-25- City of Fort Walton Beach Comprehensive Fee Schedule Certificate of Occupancy 36. 00 No Change Res 2008 -15 04/ 08/08 Certificate of Completion 36. 00 No Change Res 2008 -15 04/ 08/ 08 Temporary Certificate of Occupancy 257.50 No Change Res 2008 -15 04/ 08 /08 Mechanical Permits and Inspection Permit Fee Base 37. 00 No Change Res 2008 -15 04/ 08/ 08 14. 25 for the first $ 1, 000 or fraction Inspection of heating, ve +ntilation, ductwork, thereof of the valuation of installation plus No Change Res 2008 -15 04/ 08/ 08 air conditioning and refrigeration systems 2. 60 for each additional $ 1, 000 or fraction thereof Inspecting repairs, alterations, and additions 5. 50 plus $ 3. 25 for each additional No Change Res 2008 -15 04/ 08/ 08 on existing systems 1, 000 or fraction thereof Inspecting Boilers Boiler Inspections 38. 00 No Change Res 2008 -15 04/ 08/ 08 Reinspection of a heating, ventilation, air First - $ 36. 00 conditioning or refrigeration system, or boiler Second - $ 36. 00 No Change Res 2008 -15 04/ 08/ 08 inspection ( reinspection same as above) Third and more - $ 110. 00 Inspection for permitting temporary operation First - $ 36. 00 of heating, ventilating, refrigeration, or air Second - $ 36.00 No Change Res 2008 -15 04/ 08/ 08 condition system ( reinspection same as Third and more - $ 110. 00 above) Reduced by 50% housing, unless permit is for minimum of $ 5. 00. Repairs, alterations Rehabilitation of substandard No Change Res 2003 -01 1/ 28/03 and additions to an existing system under 500. 00 Plumbing and Gas Permits Base Permit Fee 37. 00 No Change Res 2008 -15 04/ 08/08 Plus, per plumbing fixture, floor drain or trap, 3. 25 No Change Res 2008 -15 04/ 08/ 08 including water and drainage pipe Plus, per sewer connection 11. 33 No Change Res 2008 -15 04108/ 08 Plus, per water heater and /or vent 3. 00 No Change Res 2008 -15 04/ 08/08 For installation, alteration or repair of water 5. 75 No Change Res 2008 -15 04/ 08/08 piping and /or water treating equipment t Tvr7up " 5. 75 No Change Res 2008 -15 04/ 08/08 For vacuum breakers or backf low protective devices subsequent to the installation of the 1 to 5 - $ 3. 00; over 5, each - $ 2. 00 No Change Res 2008 -15 04/ 08/ 08 piping or equipment served First - $ 36. 00 Reinspection for faulty materials, equipment, Second - $ 36. 00 No Change Res 2008 -15 04/ 08/ 08 apparatus or workmanship Third and more - $ 110. 00 Electrical Permits Base Permit Fee 37. 00 No Change Res 2008 -15 04/ 08/08 Plus, per circuit 1. 75 No Change Res 2008 -15 04/ 08/ 08 Temporary pole 17. 50 No Change Res 2008 -15 04/ 08/ 08 First - $ 36. 00

Download this text file with its original spacing ↓