READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 09-09-2009 special — reading text
Part 5 of 22. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-24078-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
fee plus $ 300. 00 deposit No Change Res 07 -15 09/ 05/ 07
Characteristic of Use ( Sec. 12. 93. 09) toward legal ad cost plus direct expenses
Review of an Application for Development
Approval ( ADA) for a Development of
1, 500. 00 filing fee plus $ 700. 00 deposit No Change Res 2003 -27 10/ 14/ 03
plus direct expenses
Regional Impact ( DRI) ( Sec. 2. 11. 02)
Review of a Proposed Substantial Deviation
1, 000. 00 filing fee plus $ 700. 00 deposit
to a Previously Approved Development of No Change Res 2003 -27 10/ 14/ 03
plus direct expenses
Regional Impact ( DRI) ( Sec. 11. 02)
U: \ Flnance\ Fee Schedule\ 2009, Seplember \9 -9 -09 Fee Schedule - 9/ 3112009 10: 19 AM
24-
City of Fort Walton Beach
Comprehensive Fee Schedule
Basis filing fee of $ 100. 00 + one -tenth of
one cent for each gross square foot of
land area contained within the site covered
under the proposed agreement. An initial
deposit of $ 2, 500. 00 upon filing. Additional
increments of $ 2, 500. 00 as deposits are
Development Agreement Application or Res 2003 -27 10/ 14103
exhausted upon notice of the City. No Change
Modification ( Sec. 12. 35)
exception: small scale projects of less
than two ( 2) acres (gross) in size shall be
exempt from $ 2, 500. 00 deposit
requirement if City Manger determines that
technical assistance will not be required
outside consultants)
Directions" Comprehensive Plan 75. 00 per copy No Change Res 2003 -01 1/ 28/ 03
Designation as a Historic Site or Structure;
Demolition of a Structure over 50 years old;
or Request for Waiver of a Requirement of 200. 00 filing fee No Change Res. 2006 -30 12/ 12/06
Archaeological and Historical Preservation
At
BUILDING PERMIT FEES ( Sec. 3. 02. 05)*
General Fees
Contractors Registration 40. 25 No Change Res 2008 -15 04/ 08/ 08
21. 00 No Change Res 2008 -15 04108/ 08
Building permit processing fee
Job Card 1. 00 each No Change Res 07 -15 09/ 05/ 07
25. 75 per submittal SFD
Revisions to approved permit, per submittal 51. 50 per submittal MF No Change Res 2008 -15 04/ 08/ 08
77. 25 per submittal Com
Penalty for commencement prior to 300% of permit fee or $ 250, whichever is
No Change Res 07 -15 09/ 05/ 07
greater
permitting ( Sec. 3. 02. 07)
Change of contractor, transfer of permit (Sec. Res 2003 -01 1/ 28/ 03
Prorate balance of work No Change
3. 02. 10)
Expired permit (Sec. 3. 02. 08) Re- issuance requires fee to be paid No Change Res 07 -15 09/ 05107
Conditional; no work has commenced and
Refund of permit fee (Sec. 3. 02. 11) permit has not expired; requires written No Change Res 07 -15 09/ 05/07
notice to the BO
Construction Permit Fees
No permit required for cosmetic work only,
such as carpet, tile, painting, landscaping,
500 or less etc. Exceptions include any structural No Change Res 07 -15 09/ 05/07
change or any work that requires an
inspection per the FBC.
37. 10 for the first thousand, plus $ 6. 25
501 to $ 50, 000 for each additional thousand or fraction No Change Res 2008 -15 04/ 08 /08
Permit based on thereof, to and including $ 50, 000
value of work,
includes labor, 343. 35 for first $ 50, 000 plus $ 5. 00 for
materials, site work, 50, 001 to $ 100, 000 each additional thousand or fraction No Change Res 2008 -15 04/ 08/ 08
and design fees thereof to and including $ 100, 000
593. 35 for the first $ 100, 000 plus $ 3. 80
100, 001 to $ 500,000 for each additional thousand or fraction No Change Res 2008 -15 04/ 08/08
thereof to and including $ 500, 000
2, 113. 35 for the first $ 500, 000 plus $ 2. 60
for each additional thousand or fraction No Change Res 2008 -15 04/ 08/ 08
500, 001 and up
thereof
Radon Fee - a 1 % radon fee may be added, per F. S. 553. 721 and F. S. 468.631 ( based on sq. ft. of gross floor area for new construction)
