READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2010-25 - Amend Fee Schedule — reading text
Part 1 of 8. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-23987-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
RESOLUTION NO. 2010- 25
A RESOLUTION OF THE CITY OF FORT WALTON BEACH,
FLORIDA, AMENDING THE COMPREHENSIVE FEE SCHEDULE
FOR FIRE DEPARTMENT FEES, ENGINEERING & UTILITY
SERVICES DEPARTMENT FEES, RECREATION AND
CULTURAL SERVICES DEPARTMENT FEES; AND SETTING
AN EFFECTIVE DATE.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT
WALTON BEACH:
Section I. Pursuant to the authority of section 3. 01. 06,
Building Code, Permit
Fees, of the City Code of Ordinances, the Comprehensive Fee Schedule is
amended by adding, eliminating, and adjusting certain fees as follows:
Additional Inspection Fee $ 38. 00
Earlv Power Fee $ 38. 00
OSPR Restaurant License Water & $
39. 50
Wastewater Service Certification Fee
Job Card $ 1. 00 each
BUILDING PERMT FEES ISec. 3.02.05\*
A surcharaevvill be collected in accordanceVvith and for the ourooses stated in F.S. 468.631 and F.S. 553.721.
R::
Idon F-
ee .) 1~-;. FaSen fee HEJ 00 00008. I*!
f FS. 883. 721 and F. S. 400. 931 ( easee an ~. ft. sf ~ floor area fer na" ooAE::trJGtien)
Building permit processing fee ~ $ 22.50
Construction Permit Fees
fa the first ttnJsard, pus~ fa ~ fa the first ttnJsand, Qm fa
pus.$
501 to 5
$ 0,(
0) each actJitialal t
thous:n:a fraction therect, each a::
Iditialal thous:n:
t or fraction therect,
to and irdLd~ $50,(
0) to and irdLd~ $50,(
0)
343,35 fa first 5$ 0,(
0) $ 00 fa each ~
pus 5, fa first 5
$ 0,(
0) pus 5$ .25 fa each
Permit based on $
50,001 to $100,(0) adcitional thoosand a fraction therect to and adcitionaI thoosand a fraction therect to and
value d v..
o1<, irdLd~ $ 100,(0) irdLd~ $ 100,(0)
irdudes labor,
materials, site v..
o1<, $
aQ:iJ5 for the first $100,(0) $ OO fa ~
pus J; for the first $100,(0) pus 4.
$ 00 fa
and design fees $
100,001 to 5
$ 00,(
0) each adcitialal ttnJsard or fraction therect each adcitional thc:usard a fraction therect
to and irdudi~ $500,(
0) to and irdlXli~ $500,(
0)
2A. 13,3$
fa the first $
500,(
0)plus 2 00 for ~
$ : fa the first 5
$ 00,(
0) Q plus.RZ.fO!
500,001 and 1.4> $
each adcitialal ttnJsard a fraction therect each adcitional t
thous:n: a fraction therect
First-$J6,OO First- rnm
Re-lnspection** Fee Secood - $ 3(iOO Secood - rnm
Third and rrore - 00
1-
$ 10, Third and rrore - $115.50
Reinspection mea1S the buildng inspector reh.ms to the job site to review Xm!
< Cted v.
or1<denied on the previous inspectial fa the sane vidation.
Certificate ci Occupancy $ 36.00 ~
Certificate ci Canpletion $ 3&.
00 $ 38. 00
Temporary Certificate ci Occupancy ~ $ 270. 50
Mechanical Permits and Inspection
Pennit Fee Base ~ $ 39. 00
fa the first $ 1, 000 or fraction thered $ 15.00 for the first $ 1, 000 or fraction thereof
Inspection d heating, ventilation, cIuclv.or1<, ~
d the valuation d installation plus 2 $ .00 fOr d the valuation d installation plus ~ for
air conditioning and refrigeration systems
each additional $ 1, 000 or fraction thereof each additional $ 1, 000 or fraction theroof
Inspecting repairs, alterations, and additions $ MG plus 8
3
$ ,
2.for each additional $ 1, 000 ~ plus ~ for each additional $ 1,( 0)
on existing systems or fraction thered or fraction thereof
o..'.,.,.,....""'.,;."~~......."',.....,""'.;;...-,;_~~.""-~-,..~,.;.~"-,,.,;..;,-..,.~.,"'..,~
Mo.....,
Inspecting Boilers
Boiler Inspections $ 38,00- ~
Reinspection d a heating, ventilation, air First-$36,OO First-~
conditioning or refrigeration system, or boiler Second- $36,00 Second- moo
inspection ( reinspection same as above) Third and more - $ 1. 10,00 Third and more - $ 115.50
Inspection for pennittlng temporary
operation of heating, ventilati~, 36,00
First - $ First - $ 38.00
Second- ~ Second- moo
refrigeration, or air condition system
Third and more - 10,
$+ 00 Third and more - $ 115.50
reinspection same as above)
Plmting and Gas Pemits
Base Pemit Fee $ 37,00 ~
Aus, per pllTD~ fIXture,
