READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — August 2, 2016 — proposed Water & Sewer Ordinance (tracked changes version) — reading text

Part 9 of 36. These parts divide the reading text for browsing; they are not the source document's page numbers.

proposed Water & Sewer Ordinance (tracked changes version) — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Industrial User. (6) Notification of the Discharge of Hazardous Waste. a. Any User who commences the discharge of hazardous waste shall notify the POTW, the EPA Regional Waste Management Division Director, and State hazardous waste authorities, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR Part 261, the EPA hazardous waste number and the type of discharge (continuous, batch, or other). If the User discharges more than one hundred (100) kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the User: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the waste stream discharged during that calendar month, and an estimation of the mass of constituents in the waste stream expected to be discharged during the following twelve (12) months. All notifications must take place no later than one hundred and eighty (180) days after the discharge commences. Any notification under this paragraph need be submitted only once for each hazardous waste discharged. However, notifications of changed conditions must be submitted under Section 24-134 of this ordinance. The notification requirement in this Section does not apply under the self-monitoring requirements of Sections 24-138 of this ordinance. b. Dischargers are exempt from the requirements of paragraph (a), above, during a calendar month in which they discharge no more than fifteen (15) kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than fifteen (15) kilograms of non-acute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the User discharges more than such quantities of any hazardous waste do not require additional notification. c. In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the User must notify the Director, the EPA Regional Waste Management Waste Division Director, and State hazardous waste authorities of the discharge of such substance within ninety (90) days of the effective date of such regulations. d. In the case of any notification made under this Section, the User shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. Page 27 of 118 e. This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this ordinance, a permit issued there under, or any applicable Federal or State law. (7) Analytical Requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report, shall be performed in accordance with the techniques prescribed in 40 CFR Part 136 and amendments thereto and Paragraph 62-625.600(1)(e), F.A.C., Chapter 62-160, F.A.C., and the Department of Environmental Protection Standard Operating Procedures for Field Activities, DEP-SOP-001/01 (DEP-SOP-001/01, FS 2400, Wastewater Sampling) unless otherwise specified in an applicable categorical Pretreatment Standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that the Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the Director or other parties approved by EPA. (8)Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report and based on data that is representative of conditions occurring during the reporting period. a. Except as indicated in Section (b) and (c) below, the User must collect wastewater samples using 24-hour flow-proportional composite sampling techniques, unless time-proportional composite sampling or grab sampling is authorized by the Director. Where time-proportional composite sampling or grab sampling is authorized by the Director, the samples must be representative of the discharge. Using protocols (including appropriate preservation) specified in 40 CFR Part 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period maybe composited prior to the analysis as follows: for cyanide, total phenols, and sulfides, the samples may be composited in the laboratory or in the field. For volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the compositing procedures as documented in approved EPA methodologies may be authorized by the Director, as appropriate. In addition, grab samples may be required to show compliance with Instantaneous Limits. b. Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. c. For sampling required in support of baseline monitoring and 90-day compliance reports required in Section 24-138 (a) and 24-138(j) [40 CFR 403.12(b) and (d)], a minimum of four (4) grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist. For facilities for which historical sampling data are available, the Director may authorize a lower minimum. For the reports required by paragraphs Section 24-138 (40 CFR403.12(e) and 403.12(h)), the Industrial User is required to collect the number of grab samples necessary to assess and assure compliance by with applicable Pretreatment Standards and Requirements. (9) Users subject to the reporting requirements of this ordinance shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this ordinance, any additional records of information obtained pursuant to monitoring activities undertaken by the User independent of such requirements and documentation associated with Best Management Practices. Records shall include the date, exact place, method, time of sampling, name of the person(s) taking the samples, dates analyses were performed, who performed the analyses, the analytical techniques or methods used, and the results of such analyses. These records shall remain available for a period of at least three (3) years. This period shall be automatically extended for the duration of any litigation concerning the User or the County, or where the User has been specifically notified of a longer retention period by the Director. (10) Reports on Compliance with Categorical Pretreatment Standard Deadline. Page 28 of 118 Within ninety (90) days following the date for final compliance with applicable categorical Pretreatment Standards, or in the case of a New Source following commencement of the introduction of wastewater into the POTW, any User subject to such Pretreatment Standards and Requirements shall submit to the Director a report containing the information described in Section 24-132(c) and 24-138(b) 2 of this ordinance. For Users subject to equivalent mass or concentration limits established in accordance with the procedures in Section 24-134[Note: See 40 CFR 403.6(c)], this report shall contain a reasonable equivalent measure of the User’s long-term production rate. For all other Users subject to categorical Pretreatment Standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the User’s actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with Section 24-142 of this ordinance. All sampling will be done in conformance with Section 24-138(g) and Section 23-138(h). (11) All Users not required to obtain an individual wastewater discharge permit shall provide appropriate surveys and/or reports to the Director as the Director may require. Sec. 24-139. - Monitoring facilities. The Board shall require to be provided and operated at the users own expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should normally be situated on the user's premises, but the Board may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles. There shall be ample room in or near such sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the User. Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with the Board's requirements and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the Board. Sec. 24-140. - Inspection and sampling. The Board shall inspect the facilities of any User to ascertain whether the purpose of this article is being met and all requirements are being complied with. Persons or occupants of premises where sewage is created or discharged shall allow the Board or their duly authorized representative ready access at all reasonable times to all parts of the premises for the purposes of inspection, sampling, records examination and copying of records or in the performance of any of their duties. The Board, approval authority and (where the state is the approval authority), EPA shall have the right to setup on the User's property such devices as are necessary to conduct sampling inspection, compliance monitoring and/or metering operations. Where a User has security measures in force which would require proper identification and clearance before entry into their premises, the User shall make necessary arrangements with their security guards so that upon presentation of suitable identification, personnel from the Board, approval authority and EPA will be permitted to enter, without delay, for the purposes of performing their specific responsibilities. (1) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the User at the written or verbal request of the Director and shall not be replaced. The costs of clearing such access shall be borne by the User. (2) Unreasonable delays in allowing the Director access to the User’s premises shall be a violation of this ordinance. (3) Search Warrants: If the Director has been refused access to a building, structure, property, or any part thereof, and is able to

Download this text file with its original spacing ↓