READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2013-17 Funding for Wright Pkwy Sidewalk Project — reading text

Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-31871-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

FY: 2016 -2017 Total Construction Cost 163, 691, 00 30600 218, 99700 00 218. 997,00 Construction Engineering and Inspection ( LEI) FY: 2011 -2012 FY: 2012- 2013 FY: 2013 -2014 FY: 2014- 2015 FY 2015 -2016 FY: 2016 -2017 Total CEI Cost 0. 00 0. 0 0. 00 0. 00 0.00 Total Consvucuon & CEI Costs 163691 .00 106 RQO 218 997 . 00 218 997. 00 TOTAL COST OF THE 5180. 060. 00 555.386. 00 E235.366.00 50. 00 4235. 366. 00 PROJECT 525 010. 12 COPY Pa000CnoN SUPFOnT 09/11 Page 3 of 3 5TATE OF RTATION FPN SUPPLEMENTAL NO. LOC 1 DUNS NO. 80- 939 -7102 FLqV 428097 -1 - 38- 018428097- 1 - 58 -01 CONTRACT NO. CDNTRACT AQ200 IN WITNESS WHEREOF, the parties have caused these presents to be executed the day and year first above written. AGENCY City of Fort Walton Beach STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 1 a -y By: Name: Michael Beedie By: Name: Jason D. Peters, P. E. Title: Title: Director of Transporalion Development ity Manager Attest Name: Title: Helen A. S ncer Title: Name: City Clerk Date: Legal Review: r. See gg rd En / lfaC ed Encu nLre Fortryf ty p n ing a a e ofiuntling approval by Comptroller.

Download this text file with its original spacing ↓