READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2013-17 Funding for Wright Pkwy Sidewalk Project — reading text
Part 2 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-31871-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
FY: 2016 -2017
Total Construction Cost 163, 691, 00 30600 218, 99700 00 218. 997,00
Construction Engineering and
Inspection ( LEI)
FY: 2011 -2012
FY: 2012- 2013
FY: 2013 -2014
FY: 2014- 2015
FY 2015 -2016
FY: 2016 -2017
Total CEI Cost 0. 00 0. 0 0. 00 0. 00 0.00
Total Consvucuon & CEI Costs 163691 .00 106 RQO 218 997 . 00 218 997. 00
TOTAL COST OF THE 5180. 060. 00 555.386. 00 E235.366.00 50. 00 4235. 366. 00
PROJECT
525 010.
12
COPY Pa000CnoN SUPFOnT
09/11
Page 3 of 3
5TATE OF RTATION FPN
SUPPLEMENTAL NO.
LOC
1
DUNS NO.
80- 939 -7102
FLqV 428097 -1 - 38- 018428097- 1 - 58 -01
CONTRACT NO.
CDNTRACT
AQ200
IN WITNESS WHEREOF, the parties have caused these presents to be executed the day and year first above written.
AGENCY City of Fort Walton Beach STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
1 a -y
By:
Name: Michael Beedie
By: Name: Jason D. Peters, P. E.
Title: Title: Director of Transporalion Development
ity Manager
Attest Name:
Title:
Helen A. S ncer
Title:
Name:
City Clerk
Date:
Legal Review:
r.
See gg rd En /
lfaC ed Encu nLre Fortryf ty p n ing a
a e ofiuntling approval by Comptroller.
