Okaloosa County Future
Water Supply Planning
Update
Water The Need
Background and History
Next Steps
Subtitle placed here
November 2013
The Need
Water customers in
Okaloosa County are
served by OCWS and
several other utilities
Drinking water supply
relies on wells in the
Floridan Aquifer
Water levels in the
Floridan Aquifer have
been declining since the
1950’s and further
declines are not
sustainable
The Need
Okaloosa County will need additional water sources to:
– Sustain County’s economic and population growth
– Protect Floridan Aquifer and prevent saltwater intrusion
– Provide for conjunctive use
Planning Background and History
Early 1990’s – Northwest Florida
Water Management District and
OCWS began to foresee the need
for future water supply planning
Mid 1990’s thru Mid 2000’s –
Initial studies were performed by
various groups (USACE and
NWFWMD primarily) on potential
sources throughout Okaloosa
County.
1999 – Creation of the Regional
Utility Authority (RUA)
Planning Background and History
2004 – Construction of a 21-mile
30-inch pipeline with two 1-MG
tanks thru Eglin AFB.
2006 – Northwest Florida Water
Management District contracted
with PBS&J to study potential
water supply alternatives.
2006 – Purchased 353 acres
along the Shoal River for future
utilization.
2008 – OCWS formed a Future
Water Supply Committee
consisting of local concerned
citizens.
Planning Background and History
2008 – OCWS contracted CH2M HILL to assist OCWS and
the Future Water Supply Committee with studying future
water supply.
2009-10 - Two Riverbank Filtration Studies Performed to
Evaluate Suitability of Shoal River.
2010 – In February, Okaloosa Board of County
Commissioners Approved a 4-Year Implementation Plan.
2010-13 – In partnership with the USACE and OCWS, CH2M
HILL has performed three tasks under the USACE’s
Planning Assistance to States Program which provides for a
50/50 cost-share for work performed. In total, the
partnership has performed almost $700,000 in studies with
OCWS contribution $350,000.
Planning Background and History
2013 – OCWS met with NWFWMD to discuss status of land
acquisition. NWFWMD has not budgeted for land acquisition
in their FY14 budget and has no firm timeline when or if land
acquisition will be funded. NWFWMD preference is for
OCWS to lead this effort.
Planning Background and History
2013 - Shoal River Land Acquisition was submitted to the
FDEP for consideration for Pot #2 of the RESTORE Act and
NFWF funding.
Next Steps
Safe Yield Analysis on Shoal River (aka Water Use Permit) -
Perform preliminary analysis to determine the feasibility of
withdrawing up to 10-million gallons per day from the Shoal
River.
Utilize existing REPI and DIG Grants obtained in partnership
with Eglin AFB to purchase land parcels north of Eglin AFB,
south of I-10 and near the Shoal River for both source water
protection, military buffer, and potential water treatment plant
site.
Next Steps
All three REPI Grants require a match
– The match for REPI 1 is the OCWS’s existing 353 acres along the Shoal
River.
– The match for REPI 2 and 3 is the DIG Grant 2 and 3.
DIG 1 is also available and is intended to partner with NWFWMD to
purchase the reservoir property.
Grant Utilization Plan
– Utilize REPI 2 and 3 matched with DIG 2 and 3, respectively, to purchase
land in the targeted area and place all land within a restrictive use easement
with Eglin AFB. The land acquisition may also include additional phases of
REPI & DIG.
– Seek an extension for DIG 1 from current expiration date of 12/23/13 to
allow for more time to coordinate with the NWFWMD and determine
whether they are going to assist with the land acquisition. Land purchased
with DIG 1 will not be required to be placed within a restrictive use
easement, thus it has more flexibility.
Next Steps
Shoal River Buffer Land Acquisition –
Moving Forward with REPI & DIG
- Retain real estate attorney to manage closing and ensure
all local, state, and federal requirements are met.
– Obtain asking price and questionnaire from property
owner.
– Conduct 2 land appraisals in conformance with State
Statutes & Air Force standards.
– Negotiate with property owner and sign contract (will
bring back to BCC for approval and execution).
(continued)
– During contract period (6-12 months):
• Survey
• Environmental Baseline Survey
• Title work & insurance
• Restrictive Use Easement reviewed & signed by Air Force
– Obtain money from Eglin AFB for the land purchase and
allowable transaction costs.
– Closing
• Okaloosa County would now own the property
• Restrictive Use Easement to the Air Force would be executed
* Note: All land acquisition costs & closing costs are reimbursable through REPI &
DIG grants. However, in moving forward with this process, OCWS assumes the
financial risk on any expenses should we not close on the property. These