READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — December 4, 2012 — 2012 Project List — reading text
Part 5 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 08-2012 Project List.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
area
Increased flows during
heavy rains and hurricane
Hurricane & Tropical
Force main upgrade, conditions overwhelm the City of Crestview - Water & Sewer
27 2010 Storms; Flood; and yes City of Crestview City of Crestview $300,000.00 X 90 days Existing City of Crestview Y
Lift Station #10 force main at Lift Station Dept.
Severe Storms
#10 that serves the county
jail and surrounding area.
Several wood frame
houses with a crawl space
Flood, Existing Building
Elevation of Repetitive undernearth are in need of City of Fort Walton City of Fort Walton City of Fort Walton Beach - Building City of Fort
28 1999 Hurricane/Tropical Mitigation in Flood- $540,000.00 1 year Existing Y
Loss Structures elevation or acquisition due Beach Beach Dept. Walton Beach
Storm, Storm Surge prone locations
to frequent flooding during
storm events.
All traffic signals that are All Jurisdictions -
not currently on mast arms mast arms are
Building Construction
Intersection Mast rated at 140 mph need to City of Fort Walton City of Fort Walton City of Fort Walton Beach - Public located on
29 2010 All hazards and Wind; $896,000.00 X 1 year Existing Y
Arms be updated. There are six Beach Beach Works Dept. Hurricane
Communications
intersections for a total of evacuation
18 mast arms needed. routes
E-3
Okaloosa County
2011 LMS
Appendex E
YEAR MITIGATION GOALS MATCH (if AGENCY RESPONSIBLE FOR ESTIMATED PROJECT STATUS IF DEFERRED, TIMEFRAME FOR MiTIGATE NEW OR HMGP
PRIORITY NAME OF PROJECT PROJECT DESCRIPTION HAZARDS MITIGATED FUNDING SOURCE JURISDICTION BENEFICIARY
SUBMITTED ACHIEVED Applicable) IMPLEMENTATION COST WHY COMPLETION EXISTING? ELIGIBLE
NEW COMPLETED DELETED DEFERRED
The Kennedy Lakes area in
NW Crestview is plagued
by low water pressures,
While the pressure is
adequate to provide water
Elevated Potable to residences, it is
City of Crestview - Water & Sewer
30 Water Storage Tank- 2010 dangerously low for fire Wildfire yes City of Crestview City of Crestview $1,000,000.00 X 270 days Existing City of Crestview Y
Dept.
Kennedy Lakes Area protection. The storage
tank is necessary to
provide additional storage
and head pressure to flight
wildfires or multiple
structure fires in this area.
Stormwater drainage
analysis and infrastructure Unincorporated
Hurricane & Tropical
Port Dixie Stormwater repair/replacement for the Okaloosa County - Public Works Okaloosa County
31 2010 Storm; Flood; and yes Okaloosa County Okaloosa County $5,000,000.00 X 770 days Existing Y
System Repair Port Dixie drainage area to Dept. within the Port
Severe Storms
resolve regional flooding Dixie Area
and stormwater problems.
Installation of standby
generators at each of 8
existing un-interuptable
standvy generators at power supply City of
32 8 power supply 2011 locations.Ensures All hazards yes City of Valparaiso City of Valparaiso City of Valparaiso - Public Works Dept $77,000.00