READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — December 4, 2012 — 2012 Project List — reading text

Part 2 of 9. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 08-2012 Project List.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Relocate unilities underground. The town has already committed to a very Relocate all utilities small portion of Eglin Pkwy Hurricane/Tropical Town of Cinco Town of Cinco Town of Cinco Bayou and private Town of Cinco 8 2010 yes $1,000,000.00 X 1 year Existing Y underground (SR 85) but will need new Storm Bayou Bayou utilities Bayou grant/funding source to continue to the Cinco Bayou bridge. During emergencies with Unincorporated Generators for lift power outages, such as Okaloosa County stations, wells, hurricanes, generators are Hurricane & Tropical OkaloosaCounty - Water & Sewer within the 9 booster stations and 2010 needed to keep lift stations, Storm; and Severe yes Okaloosa County Okaloosa County $1,200,000.00 X 1 year Existing Y Dept. Okaloosa County wstewater treatment wells, booster stations, and Storms Water & Sewer plants wastewater treatment Service Area plants in working order. An automatic transfer emergency generator is needed at Lift Station #1 to prevent sewage overflow Hurricane and Tropical Emergency into Santa Rosa Sound in City of Fort Walton City of Fort Walton City of Fort Walton Beach - Water & City of Fort 10 1999 Storm; and Severe yes $37,000.00 X 3 months Existing Y Generators case of power failure. An Beach Beach Sewer Dept. Walton Beach Storm additional portable generator is needed to accommodate other Lift Stations within the City. E-1 Okaloosa County 2011 LMS Appendex E YEAR MITIGATION GOALS MATCH (if AGENCY RESPONSIBLE FOR ESTIMATED PROJECT STATUS IF DEFERRED, TIMEFRAME FOR MiTIGATE NEW OR HMGP PRIORITY NAME OF PROJECT PROJECT DESCRIPTION HAZARDS MITIGATED FUNDING SOURCE JURISDICTION BENEFICIARY SUBMITTED ACHIEVED Applicable) IMPLEMENTATION COST WHY COMPLETION EXISTING? ELIGIBLE NEW COMPLETED DELETED DEFERRED Storm proof lift stations 4,8,9,10,14,15, & 17. elevate tops of wet wells, Hurricane & Tropical valve boxes, relocation of Flood Proofing Lift Storm; Flood; Land City of Valparaiso - Water & Sewer City of 11 2010 emergency power supplies, yes City of Valparaiso City of Valparaiso $600,000.00 X 3 months Existing Y Stations Erosion; Severe Storms; Dept. Valparaiso and storm hardening and Beach Erosion controls. To include bulkheads and/or retaining walls Restoration of Restoration of wetlands in Hurricane & Tropical wetlands in Glenwood Glenwood Park and Town of Cinco Town of Cinco Town of Cinco 12 2010 Storm: Flood; Storm yes Town of Cinco Bayou - Public Works $15,000.00 X 1 year Existing Y Park and upgrade the upgrade the park's Bayou Bayou Bayou Surge drainage system drainage system Sewer pump Station Location is unstable and City of Niceville - Water & Sewer 13 13 protective 2010 susceptible to erosion and Land Erosion yes

Download this text file with its original spacing ↓