READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 24, 2013 — Grant of Easement — reading text
Part 1 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 60-Grant of Easement.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Document Number: FTFA-EG-2-13-004
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
FOR
EGLIN AIR FORCE BASE, FLORIDA
Standard Outgrant Easement
SAF/GCN-RPO
March 2010
Document Number: FTFA-EG-2-13-004
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
FOR
EGLIN AIR FORCE BASE, FLORIDA
TABLE OF CONTENTS
I. PARTIES AND PURPOSE ........................................................................................................................................................ 1
II. CONSIDERATION ................................................................................................................................................................... 1
III. TERM........................................................................................................................................................................................ 1
IV. GRANTEE ACCESS ............................................................................................................................................................... 1
V. GRANTOR’S RIGHT OF ACCESS AND INSPECTION ................................................................................................... 2
VI. GRANTOR’S RIGHT OF ACCESS FOR ENVIRONMENTAL PURPOSES ................................................................... 2
VII. GRANTOR’S REASONABLE REGULATION ................................................................................................................. 2
VIII. CONDITION OF EASEMENT AREA............................................................................................................................... 3
IX. OTHER GRANTS OF ACCESS ............................................................................................................................................. 3
X. GRANTEE’S IMPROVEMENTS ........................................................................................................................................... 3
XI. NO OBSTRUCTIONS ............................................................................................................................................................ 3
XII. GENERAL INDEMNITY ..................................................................................................................................................... 4
XIII. LIMITATION OF GRANTEE RIGHTS ........................................................................................................................... 4
XIV. INSURANCE ........................................................................................................................................................................ 4
XV. AIRFIELD CONSTRUCTION ............................................................................................................................................. 5
XVI. PRESERVATION OF CULTURAL AND NATURAL RESOURCES............................................................................ 5
XVII. GRANTEE PERMITS ........................................................................................................................................................ 5
XVIII. ENVIRONMENTAL CONDITIONS .............................................................................................................................. 5
XIX. ENVIRONMENTAL COMPLIANCE ............................................................................................................................... 5
XX. ENVIRONMENTAL USE RESTRICTIONS ...................................................................................................................... 6
XXI. HAZARDOUS MATERIALS AND HAZARDOUS WASTE........................................................................................... 6
XXII. GRANTOR ENVIRONMENTAL REMEDIATION ....................................................................................................... 6
XXIII. ENVIRONMENTAL INDEMNIFICATION .................................................................................................................. 6
XXIV. ENVIRONMENTAL LIABILITY OF THE GRANTOR .............................................................................................. 7
XXV. ABANDONMENT OR TERMINATION OF EASEMENT ............................................................................................ 7
XXVI. DAMAGE TO OR REMOVAL OF GOVERNMENT PROPERTY ............................................................................ 7
XXVII. REMOVAL OF GRANTEE IMPROVEMENTS .......................................................................................................... 8
XXVIII. REMEDIES FOR NON-COMPLIANCE ..................................................................................................................... 8
XXIX. ASSIGNMENT .................................................................................................................................................................. 8
XXX. AUTHORIZED REPRESENTATIVES AND NOTICES ................................................................................................ 9
XXXI. EXHIBITS ........................................................................................................................................................................ 11
Standard Outgrant Easement i
SAF/GCN-RPO
March 2010
Document Number: FTFA-EG-2-13-004
Standard Outgrant Easement i
SAF/GCN-RPO
March 2010
Document Number: FTFA-EG-2-13-004
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
I. PARTIES AND PURPOSE
THE UNITED STATES OF AMERICA, acting by and through the Secretary of the Air
Force (the "Grantor"), under and pursuant to the authority granted in 10 U.S.C. § 2668, the
Secretary of the Air Force having determined that no more land than needed for the easement is
included herein, does hereby GRANT and CONVEY to Okaloosa County Board of County
Commissioners, Okaloosa County, Florida (Grantee), a nonexclusive easement to install, operate
and maintain an underground sewer main on, over, under, and across the property on Eglin Air
Force Base (AFB), Florida, as described in Exhibit A and depicted on Exhibit B (the
“Easement Area”). The Grantor and Grantee may be referred to as Parties or separately as a
Party.
II. CONSIDERATION
A. The sum of $3,750 and the provision of maintenance, repair, and security of the
Easement Area, and other good and valuable consideration, the receipt and sufficiency of which
is hereby acknowledged.
B. Payment is due in advance. Payment information:
CHECK INFORMATION: MAILING ADDRESS:
Paid to Account: DSSN3801DY 96 CEG/CEAF
Instrument Number: FTFA-EG-2-13-004 501 Deleon Street, Suite 100
Account Code: 47U2 Eglin Air Force Base FL 32542
Geographical Location: FTFA
C. The Grantee, at its own expense, shall record this executed easement (including
Exhibits A and B) in the public records of the county within which the easement site is located
within fourteen (14) days after receipt, and shall provide to the Grantor within ten (10) days
following the recordation a copy of the recorded easement (including Exhibits A and B) which
contains the O. R. Book and pages at which the easement is recorded.”
III. TERM
This Grant shall be for a term of 25 years beginning ___________ 2013 through
___________2038.
IV. GRANTEE ACCESS
Grantee is granted the nonexclusive right to use the walkways, streets, and roads on Eglin
Standard Outgrant Easement Page 1 of 10
SAF/GCN-RPO
March 2010
Document Number: FTFA-EG-2-13-004
AFB, Florida in common with the Grantor and its lessees and licensees for access to and from
the Easement Area and the nearest public street or highway.
V. GRANTOR’S RIGHT OF ACCESS AND INSPECTION
Grantor shall have the right to enter the Easement Area at any time and shall have the
right to reasonably inspect Grantee’s use of it and any of Grantee’s improvements or property
placed thereon, without notice.
VI. GRANTOR’S RIGHT OF ACCESS FOR ENVIRONMENTAL PURPOSES
Grantor reserves for itself and for the benefit of those local, state and federal
governmental agencies that have responsibility for environmental regulatory compliance (the
"Environmental Agencies") and their respective officials, agents, employees, and contractors,
and subcontractors, the right of access to the Easement Area for the following purposes, either on
the Easement Area or on other lands, and for such other purposes,
A. to conduct site investigations and surveys, including, where necessary, drilling, soil
and water sampling, test-pitting, testing soil borings, and other activities related to the base
Environmental Restoration Program (ERP);
B. to inspect field activities of the Grantor and its contractors and subcontractors in
implementing the ERP;
C. to conduct any test or survey required by the Environmental Agencies relating to the
implementation of the ERP, or environmental conditions on the Easement Area, or to verify any
data submitted to the Environmental Agencies by the Grantor relating to such conditions;
D. to conduct, operate, maintain, or undertake any other response, corrective, or remedial
action as required or necessary under the ERP, including, but not limited to, the installation of
monitoring wells, pumping wells, and treatment facilities; and
E. to monitor any environmental restrictive use covenants and the effectiveness of any
other land use or institutional control established by the Grantor on the Easement Area, either by
itself, by its contractor, by any public entity, including the state, or by a private entity registered
in the state to monitor environmental covenants.
VII. GRANTOR’S REASONABLE REGULATION
The use and occupation of the Easement Area and the exercise of the rights herein
granted shall be subject to Grantor’s reasonable restrictions and regulations regarding ingress,
egress, safety, sanitation, and security, as Grantor, or its duly authorized representatives, may
from time to time impose.
Standard Outgrant Easement Page 2 of 10
SAF/GCN-RPO
March 2010
Document Number: FTFA-EG-2-13-004
VIII. CONDITION OF EASEMENT AREA
The Grantee has inspected and knows the condition of the Easement Area. It is
understood that the Easement is granted “as is, where is” without any warranty, representation,
or obligation on the part of the Grantor to make any alterations, repairs, improvements, or
corrections to conditions or to defects whether patent or latent. The Parties shall jointly perform
and sign or otherwise authenticate a Physical Condition Report at the beginning of the Easement
term to document the condition of the Easement Area. This report will be made a part of this
Grant as EXHIBIT C.
IX.
