issue later this summer.
It is very likely that the revised cost estimates for the plant renovation work will place the cost for all
the needed work above $ 10 million. This is due in large part to industry-wide construction trends
highlighted later in this report. In addition, the scope of work for the project increased from the
time that the original WWTP Facilities Plan was developed. Safety concerns related to the sludge
handling facilities at the treatment plant must be addressed now through this effort to avoid
catastrophic failures in the near future. These same facilities were thoroughly evaluated in 2002 and
found to be in good working order, with no apparent metal loss or fatigue. Based on our initial
assessment of these facilities and the current replacement costs, the added cost to the project for this
element is approximately $1.5 to $2 million.
3
Additional Water and Sewer Infrastructure Work
Included in the list of Bond projects were two of the City' s on- going Capital Improvement Projects:
CIP 5056 - 2 1/4" Water Line Replacement and CIP 5032 - Sewer Line Rehabilitation. Since the
inception of the Utility Bond program, the City has accomplished the following projects:
Relocation of the Cinco Bayou Force Main: Council approved this award on May
23, 2006, and Hemphill Construction Company completed the work in
September at a total cost of $257,950.
Slip-lining, Root Control, and Point Repairs: In addition to the Cinco Bayou Force
Main project, the City's Utilities Department personnel have completed
several annual projects related to field infrastructure repairs. The total cost
to date is $ 339, 180. 65 for the projects identified above.
Replacement of low-volume 2 1/4" water lines: Each year, City crews replace several
hundred feet of aging 2 1/4" water lines with higher volume 6" water lines.
Over the past three years, crews have replaced small diameter lines along
Reed Place, Sellers Place, Highland Drive, Laurie Drive, Gardner Drive, and
portions of other streets. The total cost to date is $ 141, 751.02 for these
improvements.
Of the $ 800,000 originally appropriated for sewer line replacement work through the Series 2005
Bonds, the City has spent $ 597, 130. 65, with $ 202,869. 35 remaining for future work. Of the
225,000 originally appropriated for 2 1/4" water line replacement work through the Series 2005
Bonds, the City has spent $141, 751.02, with $83,248.98 remaining for future work.
The following table indicates the original budget for each project and the monies appropriated to
accomplish each objective ( actual dollars may change as each objective is completed):
Pro' ect
Elevated Water Tanks
18" Transmission Main
Water Tank Demolition
2 1/ 4" Water Line Re lacement
Subtotal- Water Pro' ects
WWTP Design
WWTP Renovations
Sewer Main Rehabilitation
Subtotal - Sewer Pro' ects
I
Factors Driving the Cost of Major Infrastructure Projects
For the purpose of developing a probable opinion of cost for each of the major projects identified
in the Series 2005 Utility System Revenue Bonds, staff and the City's consulting engineers updated
the estimated construction cost for each project in February 2005 prior to entering the bond market.
During this time, the area enjoyed a relatively stable bidding environment for large scale projects.
The pricing included for each of the projects was, at the time, consistent with pricing for similar
projects of similar scope in the surrounding area. Since the time that the bonds were delivered,
4
consttuction prices have increased dramatically due to a number of circumstances in the worldwide
and regional markets including:
Instability in the petroleum market - higher petroleum prices have a direct
relationship on the cost of materials such as PVC and ductile iron pipe ( a
major element of our infrasttucture projects).
The central Florida Panhandle is not a favorable location for major infrasttucture
work - In April 2006, the unit cost for 30" jack and bore for 18" water
transmission main project was $ 750 per LF. Recendy, the unit cost for 66"
jack and bore in Escambia County was $ 500 per LF.
Desttuctive weather patterns in the northern Gulf of Mexico have substantially
limited the ability to hire cheap labor.
The enormous amount of consttuction in foreign countries has limited the
availability of common consttuction materials - Many of the world' s raw
materials supply for items such as cement, iron, and plastic is being diverted
to explosive growth countries such as China. As a result, the costs for these
materials have increased substantially over 2005 levels as follows:
8" Ductile Iron Pipe - $ 28/ LF in 2005, $ 66/ LF today
Sttuctural Cement - $ 200/ yd3 in 2005, $ 400/ yd3 today
8" PVC Pipe - $ 22/ LF in 2005, $ 50/ LF today
The City of Fort Walton Beach is not alone in experiencing escalating consttuction costs. Based on
conversations with County staff, the cost for their new WWfP to replace the aging Gamier' s
WWTP has substantially increased from the original estimate of $40 million developed in 2005, to
the current estimate for the same scope of work of $ 64.5 million. While we continue to hold out
hope that domestic markets will stabilize, it would not be prudent to think that the cost of the City' s
WWTP renovations will decrease below our current estimates. As such, we will need to consider
some source of alternative funding in order to make all of the improvements necessary for our
WWTP.
Recommendation:
No Council action is necessary for this item at this time. The intent of Staff with this report is to
update City Council on the current status of each project, the costs driving each project, the scope
of improvements needed, and the estimated costs to complete each of the remaining projects. Staff
will be providing future recommendations on options to proceed for each of the remaining projects
as more information is gathered.
7-07
Date
Lisa Absher, Finance Director Date
I.vrr;) t/ 7;
1?
5
CITY COUNCIL WORKSHOP
June 12, 2007
Workshop Agenda
Discussion to determine Council' s interest in accepting
the offer of a two- story, four bedroom home in FWB to
use to help shelter the homeless, particularly women
with children
Council Member Garvie)
Agenda Item Number: WA- 3
COUNCIL WORKSHOP 6- 12- 07
Verbatim transcription requested by City Manager
REVIEW OF UTILITY SYSTEM REVENUE BOND, SERIES 2005; GENERAL OVERVIEW OF
RELATED PROJECTS AND EXPENDITURES
Mayor - The first item is the review of Utility System Revenue Bond, Series 2005; general overview
of related projects and expenditures. Dr. Pullen requested this item and I think Mr. Hofstad will make
a presentation. So Dr. Pullen do you want to lead into this?
Dr. Pullen - No, I simply asked what was going on with it, I didn' t ask for it to be put on here but I
think it's educational for everyone, I think it's educational for everyone to see it. I just, I wanted an
update on what was going on.
Mayor - Okay, so Mr. Hofstad
John Hofstad, Utilities Director - I've got, I think a seventeen slide power point I want to present to
you and it's an overview of all of our projects in the Series 2005 Utility Revenue Bond issuance that
we had back in the spring of 05' now. First, several years ago we had to establish the need for major
capital financing for our water and sewer system. The early roots of these projects actually started
back in the late 90' s and in 98' we contracted with Fabre Engineering to develop design documents for
various water system improvements. We followed that in 2002 by hiring Hartman & Associates to
perform a Wastewater Treatment Plant Facilities Plan to analyze our wastewater treatment plant and
needed improvements for that facility. The following year in 2003 the Wastewater Treatment Plant
Facilities Plan was completed by Hartman & Associates and it had an estimated capital cost, bear in
mind that this was done without engineering and design plans, but a conceptual capital cost of $4.2
million. In June of 04' staff presented to Council in a workshop an overview of the water and sewer,
the major water and sewer projects that we had planned and we tried to identify various funding
options to fund those improvements. We started with a Phase I water system improvement project of
roughly $ 3. 25 million which included around 3 ' l2 miles of 18" water transmission main, two elevated
storage tanks and Phase II improvements were an ozone treatment facility to be located at the Golf
Club. We have since mothballed that project. We had initially sought a need, or identified a need for a
higher level of treatment at the golf course if, and when, we had to augment our florid and water
supply with sand and gravel water. So we needed some additional treatment capacity, or capability
and we identified ozone treatment for that need. We no longer have, currently, do not have a need to
to do that in the future. We also
go down that road but we do have those design plans should we elect
looked at two funding options, one being the State Revolving Fund and the other conventional debt
financing. At the time Council didn' t view the State Revolving Fund as a viable option simply because
there is quite a bit of competition for water and wastewater projects with very limited funding, plus the
payback period for that is substantially shorter than conventional debt financing that you would get
through a bond issuance. In March of 05' during a regular City Council meeting staff brought forward
Ordinance 1633 which was authorization for the issuance of up to $ 11 million in Utility System
Revenue Bonds to fund the projects I identified earlier. We had first reading in March of 05', followed
that a couple of weeks later in April of 05' where that ordinance was adopted on second reading. In
into the
May of 2005, that same year, the revenue bonds were delivered after we completed our entry
bond market to the tune of roughly $ 10. 91 million.
Page 1 of 11
COUNCIL WORKSHOP 6- 12- 07
John Hofstad - When we put together the preliminary official statement back in the spring of 05'
before we went into the bond market we had to identify various projects, which we did like I said
around $ 11 million. When we received those proceeds this is essentially how they broke down. We
started out with $