flow from NVRSB to the APWRF. This will consolidate flows and
reduce overall wastewater treatment cost for the flows from our East County Service Area (Bluewater Bay
area). Project will also eliminate Rocky Bayou Lift Station, Post Office Lift Station, and miles of 14” aging
sewer force main. Pump station construction was completed, and design of force main is in progress.
Garniers Area Sanitary Sewer Rehab (construction) – install cured-in-place liners on vitrified clay sewer
mains and brick manholes to reduce the inflow and infiltration, which is currently inundating the wastewater
collection system.
Lake Pippin Area Sewer (alternatives analysis) – install public sewer to approximately 125 lots adjacent to
Choctawhatchee Bay and Lake Pippin. This project is funded by a state appropriation administered by a
FDEP Grant Agreement.
Marlowe Area Water System Improvements (design) – provide new, larger water mains to the area and fire
hydrants to provide increased fire protection and ensure the reliability of the system.
Mid County Tank #4 (land acquisition & design) – a second elevated water tank near the Bob Sikes
Industrial Park would provide for increased storage, reliability, and redundancy for the potable water and
fire suppression systems. This project is partially funded by a Northwest Florida Water Management
District grant. Approximately 1.1 acres of land was acquired for the tank and associated infrastructure.
Newcastle Area Water System Improvements (construction) – provide new, larger water mains to the area
and fire hydrants to provide increased fire protection and ensure the reliability of the system. This project
was partially funded by a Florida Department of Economic Opportunity Community Development Block
Grant.
PJ Adams Pkwy Water Main Relocation (design) – install a water transmission main to replace the existing
main that is in conflict with the roadway 4-laning project. Project to occur in 4 phases from Hwy 85 to
Interstate 10.
Poquito Bayou Water Main & Force Main Bores (construction) – replace the aging, deteriorated mains
under Poquito Bayou with new directional bores.
PROGRAM GOAL: To be on call and ready to perform any repair to any facet of the Okaloosa County Water
& Sewer Systems’ service area at any time 24/7/365. To handle all projects undertaken in a professional manner
with a minimal amount of service disruption to our customers.
KEY OBJECTIVES:
1. Ensure budgetary, personnel, customer service and purchasing functions comply with County policies and
procedures.
2. Preserve and protect aging infrastructure to provide quality of service to customers.
3. Maintain and extend the useful life and utility of County facilities.
4. Ensure the preservation and safe operation of all work related equipment.
5. To provide routine and preventative maintenance for the system.
6. To provide emergency response capabilities to prevent all but short term interruptions to service and
prevent system losses or environmental damage.
7. To maintain and improve key components of the Water & Sewer infrastructure.
The following projects are planned for FY2017:
Brooks Bridge Water Main Bore (design & construction) – install a second water supply line to Okaloosa
Island, which would then serve as the primary water source to Okaloosa Island (main on bridge would serve
as backup). This project is partially funded by a state appropriation administered by a FDEP Grant
Agreement.
Diversion of East County wastewater from the Niceville-Valparaiso Regional Sewer Board (NVRSB) Plant
to the Arbennie Pritchett Water Reclamation Facility (APWRF) (construction) – construct a new force main
to divert OCWS sewer flow from NVRSB to the Arbennie Pritchett WRF. This will consolidate flows and
reduce overall wastewater treatment cost for the flows from our East County service area.
Garniers Area Sanitary Sewer Rehab (construction) – install cured-in-place liners on vitrified clay sewer
mains and brick manholes to reduce the inflow and infiltration, which is currently inundating the collection
system. This project is partially funded by a state appropriation administered by a FDEP Grant Agreement.
GIS/Mapping – database to be improved and upgraded, by merging multiple datasets. Additional
subsurface utility engineering to be completed as needed to accomplish the merger.
Hwy 90 West Water Main Replacement (design & construction) – install a water transmission main to
replace the aging pipeline that is regularly failing.
Lake Pippin Area Sewer (design) – install public sewer to approximately 125 lots adjacent to
Choctawhatchee Bay and Lake Pippin. This project is funded by a state appropriation administered by a
FDEP Grant Agreement.
Marlowe Area Water System Improvements (construction) – provide new, larger water mains to the area
and fire hydrants to provide increased fire protection and ensure the reliability of the system.
Meigs-Seminole Lift Station & Associated Force Mains (construction) – replace the aging and undersized
Meigs-Seminole Lift Station, which currently pumps all the wastewater from Bluewater Bay to the NVRSB
facility.
Mid County Tank #4 & Connecting Water Main (construction) – a second elevated water tank near the Bob
Sikes Industrial Park would provide for increased storage, reliability, and redundancy for the potable water
and fire suppression systems. This project is partially funded by a Northwest Florida Water Management
District grant.
Newport/Essex Area Water System Improvements (design & construction) – provide new, larger water
mains to the area and fire hydrants to provide increased fire protection and ensure the reliability of the
system.
PJ Adams Pkwy Water Main Relocation (construction) – install a water transmission main to replace the
existing main that is in conflict with the roadway 4-laning project. Project to occur in four phases from
Hwy 85 to Interstate 10.
Reclaimed Water to City of Niceville and Eglin AFB (design & construction) – provide for facility upgrades
at the APWRF to provide up to 4 MGD of reclaimed water capability and install approximately 11 miles of
reclaimed water transmission mains to the City and Eglin AFB. This project has a rough-order-of-
magnitude cost of $8M, and is currently funded at $3M, via a state appropriation administered by a FDEP
Grant Agreement. This grant will fund the entire design and environmental work, the construction of the
APWRF upgrades, and a portion of the pipeline.
Taxiway H Water Main Extension (construction) – in partnership with County Airports and Eglin AFB,
install a water main that will support the Aircraft Rescue & Fire Fighting Station and Eglin AFB’s water
system. This project is funded by an FAA grant and payment in kind for the APWRF lease with Eglin AFB.
PERFORMANCE MEASURES:
Actual Approved Proposed
Performance Measures
FY14/15 FY15/16 FY16/17
Miles of Sewer main / Maintenance Personnel 552/7 534/7 540/7
Miles of Water main / Maintenance Personnel 774/10 746/10 750/10
Input
Number of new sewer taps 154 160 170
Number of new water taps 179 200 210
Output Efficiency
Dollar value - new sewer taps $489,135 $520,000 $600,000
Dollar value - new water taps $167,253 $190,000 $250,000
Feet/Miles of sewer lines cleaned 111,635/21.1 177,424/33.6 180,000/34.1
Number of main breaks repaired - Water 833 681 700
Effectiveness
Number of main breaks repaired - Sewer 363 338 360
Valves maintained 162 300 1,650
Number of work orders (excludes taps & projects) 3,520 3,577 3,600
Man hours per work order 3.89 7.5 6.5
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: PHYSICAL ENVIRONMENT
DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/LABORATORY
PROGRAM DESCRIPTION: This program is responsible for testing various water and wastewater samples
to assure compliance with Federal and State regulatory requirements. These samples come from 3 wastewater
treatment facilities, 39 monitoring wells, and various points throughout the water distribution system.
MAJOR ACCOMPLISHMENTS LAST YEAR:
Performed a total of over 4,000 wastewater sample tests.
Tested in excess of 936 water samples from monitoring wells.
Completed in excess of 2,097 tests in both Bacteriology and Quality on County drinking water samples.
Provided all required reports to DEP, EPA, and NW Florida Water Management District.
Performed numerous testing on an as needed basis (outsourced, leachate, sand and grit).
PROGRAM GOAL: Through the timely testing and reporting of water quality, ensure the public has a safe
supply. Make certain that all treated wastewater meets all required standards prior to discharge from the plant.
Provide the public with an annual report on the quality of the drinking water and how samples are tested and
monitored.
KEY OBJECTIVES:
1. Ensure budgetary, personnel, customer service and purchasing functions comply with County policies and
procedures.
2. Maintain and extend the useful life and utility of County facilities.
3. Ensure the preservation and safe operation of all work related equipment.
4. Carry out required State and Federal laboratory testing to assure water and wastewater meet proper
standards.
5. Perform all tests required by law, regulation and design standards, or contract with a laboratory capable of
such tests at a cost efficient manner as needed.
The following projects are planned for FY2017:
Perform all mandated wastewater sample tests.
Test all required water samples from monitoring wells.
Complete both Bacteriology and Quality tests on County drinking water samples.
Provide all required reports to DEP, EPA, and NW Florida Water Management District.
Prepare and distribute annual Consumer Confidence Report (CCR; water quality analysis) to the public.
PERFORMANCE MEASURES:
Actual Approved Proposed
Performance Measures
FY14/15 FY15/16 FY16/17
Efficiency
Annual lab tests performed / Lab personnel 4,430/5 >4,000/5 >4,000/5
Annual lab tests performed / monitoring wells 726/34 456/39 456/39
Number of lab tests on drinking water 2,173 >2,000 >2,000
HISTORICAL STAFFING SUMMARY:
Category FY14 FY15 FY16 FY17
Full-time Administrative & Support 32 32 34 35
Full-time Management & Professional 15