READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 11-08-05 (regular) — reading text
Part 8 of 17. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-10100-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Tucker, Pullen, Hartwell, and
Minich in favor.
REGULAR AGENDA- PRESENTATION. WIND. TIDAL SURGE AND TREES
Presentation by Mr. Joe Foster on Wind, Tidal Surge and Trees.
This item was pulled from the agenda due to the absence of Mr. Foster, and will be scheduled for
a future agenda.
STATUS REPORT- TENNIS CENTER
Erik Stenberg, President of Swedish American Connections, Inc., presented the annual status
report for the Fort Walton Beach Tennis Center and reported that from January 16 through
January 22, 2006, the Tennis Center will be hosting its first professional event, a $ 25,000
Women' s Event, which will bring 100 world- class tennis players representing 20 to 25 countries.
Mr. Stenberg invited Mayor and Council to attend the event in January.
BOAT LIFT FACILITY- FORT WALTON LANDING
Consideration of a request by Florida Fish and Wildlife Conservation Commission ( FWC) to
construct a boat lift facility at the Fort Walton Landing; further request authorization to waive the
monthly electrical costs for this facility, as outlined in the backup report. All cost associated with
the installation, permitting and construction will be borne by the Florida Fish and Wildlife
Conservation Commission, with the exception of the City placing an electric conduit from the lift
station to our utility pole. Captain Brad Williams will be present at the meeting to answer
questions.
John Hofstad, Utilities Director, advised that Captain Williams could not be present this evening,
but that he had spoken with Captain Williams earlier this week and was assured the FWC would
pay the construction related costs and the permitting costs.
Mr. Hofstad reported he spoke with the City Attorney regarding concerns about language in the
City' s submerged land lease that addresses other uses than public uses for the facility. He stated
Captain Williams advised the FWC will work closely with DEP to resolve those issues on behalf
of the City. Mr. Hofstad also discussed a possible mutual aid agreement between the City and
FWC for law enforcement in and around the area of Santa Rosa Sound, and the Fort Walton
Landing in particular.
Discussion ensued regarding the probable use of the inside western slip for the boat lift facility,
that the use is limited to two or three slips due to water depth, and the concern that Staff has not
had an opportunity review drawings and the only contact with Captain Williams has been by
telephone.
12 o o 10/25/ 05
BOAT LIFT FACILITY ( CONTI
Mr. Minich moved to postpone discussion on the boat lift facility until
Captain Williams can come
before Council. Mr. Hartwell seconded motion.
Mr. Minich stated he would like Captain Williams to talk to the Council rather than
just telephone
conversations with Staff, and would like an opportunity to discuss the inter/ocal before
agreement
any decisions are made.
The Mayor called for the vote on the motion and it failed by vote of 3 to 4 with
Campbell, Hartwell,
and Minich in favor and Holmes, Patterson, Tucker, and Pullen opposed.
The City Manager advised the interlocal agreement is a separate item that will come back before
Council at a future date.
Dr. Pullen moved to approve the construction of a boat lift facility at the Fort Walton
landing dock by the Florida Fish and Wildlife Conservation Commission and to waive the
monthly electrical costs for this facility. All cost associated with the Installation, permitting
and construction will be borne by the Florida Fish and Wildlife Conservation Commission,
with the exception of the City placing an electric conduit from the lift station to our utility
pole. Mr. Tucker seconded motion and It carried unanimously with Holmes, Patterson,
Campbell, Tucker, Pullen, Hartwell, and Minich in favor.
PRELIMINARY/ FINAL PLAT- HOllYWOOD COMMERCIAL SUBDIVISION
Consideration of a request by John Dunne, agent for the Osborne-Frazier Family Partnership, LLC
and Franz A. and Ve Sun Richter, owners, for preliminary and final plat approval for Hollywood
Commercial Subdivision located at 745-749 Hollywood Blvd NW.
The City Attorney announced a quasi-judicial proceeding and swore in those individuals who
planned to testify.
Len Mitchell, Long- Range Planning Manager, reviewed the proposed subdivision of a parcel of
property into two lots for the purpose of transfer of ownership of the individual lots. He advised the
MPB conditionally approved the preliminary and final plat at their October 6, 2005
meeting, with
the conditions that the required landscape plan for the proposed lots be brought into conformity
with current landscaping requirements.
Mr. Mitchell further advised the Public Works Department/Engineering Division reported the
City
Surveyor found one error in the Final Plat regarding the Eglin AFB marker J- 15 that must be
corrected.
John Dunne, Agent, advised there was no objection to the Staff Report. The Staff Report was
entered and accepted into the record.
Mr. Holmes moved to approve the Preliminary and Final Plat for Hollywood Commercial
Subdivision located at 745-749 Hollywood Blvd. NW, with the following conditions:
1) That the required landscape plan to bring both proposed lots 1 and 2 Into conformity
with current landscaping requirement be submitted for approval prior to execution of
the final plat.
2) That the Eglin AFB marker J- 15 identified as " not recovered" at the southwest corner of
the northeast quarter of Section 17 has been found and visible in the field. Plat should
not identify this monument as " Not recovered-destroyed and/ or covered with
concrete" must be addressed.
Mr. Tucker seconded motion and It carried unanimously with Holmes, Patterson, Campbell"
Tucker, Pullen, Hartwell, and Minich in favor.
o 13
10/ 25/ 05 o
FINAL PLAT- NATURES TRAIL FIRST ADDITION
Consideration of a request by Charles M. Shoff, owner, for final plat approval for Natures Trail First
Addition, located at 225 Natures Trail NW for a proposed subdivision of a parcel of property into
two ( 2) lots for the purpose of transfer of ownership.
The City Attorney announced a quasi-judicial proceeding and swore in those individuals who
planned to testify.
Mr. Mitchell reviewed the proposed subdivision of a parcel of property into two lots for the purpose
of transfer of ownership of the individual lots. He advised the MPB approved the preliminary and
final plat at their October 6, 2005
Mark Siner, representing the applicant, had no objection to the Staff Report. The Staff Report was
entered and accepted into the record.
Mr. Campbell moved to approve the Final Plat for Natures Trail First Addition Subdivision
located at 225 Natures Trail Court NW. Mr. Minich seconded motion and it carried
unanimously with Holmes, Patterson, Campbell, Tucker, Pullen, Hartwell, and Minich in
favor.
RECESS
The meeting recessed at 8: 55 p. m.
RECONVENE
The meeting reconvened at 9: 00 p. m.
PRELIMINARY PLAT- SHADY OAKS SUBDIVISION
Consideration of a request by Albra Ann Coon, owner, for preliminary and final plat approval of
Shady Oaks Subdivision located at 209- 211 Oaks Street SE for a proposed replat of a parcel of
property into seven ( 7) lots, for the purpose of ownership of the individual lots.
The City Attorney announced a quasi- judicial proceeding and swore in those individuals who
planned to testify.
Mr. Mitchell clarified this is a request for preliminary plat approval only, and not preliminary/final
plat approval as stated in the agenda. He advised the request is to replat a parcel of property into
seven lots for the purpose of transfer of ownership, and that the MPB recommended approval at
their meeting of October 6, 2005.
Jim Weeks, engineer and agent for the applicant, had no objection to the Staff Report. The Staff
Report was entered and accepted into the record.
Mr. Campbell moved to approve the Preliminary Plat for Shady Oaks Subdivision located at
209- 211 Oak Street SE. Mr. Campbell seconded motion and It carried unanimously with
Holmes, Patterson, Campbell, Tucker, Pullen, Hartwell, and Minich in favor.
SITE PLAN APPROVAL- FORT WALTON BEACH YACHT SALES
Consideration of a request by Stephen Moatz owner of Fort Walton Beach Yacht Sales, for site
plan approval for the construction of a 1, 365 SF commercial building located at 240 Eglin Parkway
SE.
The City Attorney announced a quasi-judicial proceeding and swore in those individuals who
planned to testify.
14 o o 10/ 25/ 05
FORT WALTON BEACH YACHT SALES ( CONTI
As there were no objections, the Staff Report was entered and accepted into the record.
Peggy Fowler, Planner, explained the project includes the demolition of two existing buildings and
a portion of the existing pavement and installation of a manufactured building fronting Eglin
Parkway. The project includes drives, parking, landscaping, and stormwater management. She
advised the applicant was granted a development order for a Change of Nonconforming Building
by the Municipal Planning Board at their September 1, 2005 meeting. The CRA was presented
with the site plan at their October 5, 2005 meeting, and was denied primarily because of issues
with the building design.
Ms. Fowler informed the site plan is generally consistent with the Comprehensive Plan Future
Land Use Map, is in conformance with the height, setback and lot coverage requirements, shows
the required parking lot landscaping will be provided, and stormwater management will be
accommodated through retention areas located along Harbeson Street SE and First Street.
Ms. Fowler advised Staff recommends approval of the project with conditions.
Mark Siner, Choctaw Engineering, advised the applicant has made changes to the site plan to
conform to City standards, and that the project will be an improvement from what is presently on
the site.
Dr. Pullen moved to approve the site plan for Fort Walton Beach Yacht Sales, 240 Eglin
Parkway, SE, subject to the following conditions: Note: These conditions are based upon
the applicationand site plan developedby Choctaw Engineering, Inc. (project 1997- 317- 8,
dated May 25, 2005, revised August 2, September 21, and October 11, 2005) and the
architectural drawings and elevations developed by Alliance Homes, Inc.
1) The site plan must comply with all the conditions of the development order for the
Change of Nonconforming Building" as follows:
a. The site shall be developed as approved on the site plan submitted with the change
In nonconformity application, prepared by Choctaw Engineering, Inc., Job No. 1997-
318- B, dated May 25, 2005, and revised 8/ 05.
b. The applicant shall provide a solid, six-foot high landscape buffer zone planted with
hedge material of a species that will achieve a height of six feet (6') within two (2)
